About this opportunity

The Department of Homeland Security US Coast Guard is seeking a small business contractor to upgrade the fire alarm system on the USCG Cutter OSAGE located in Sewickley, Pennsylvania. The solicitation requires replacing the existing obsolete Notifier AFP 200 Fire Alarm system with a new Notifier AFP 320 system, maintaining existing wiring infrastructure where possible. Contractors must provide all necessary labor, materials, and tools to complete the system replacement, including removing old components, configuring new system zones, and conducting comprehensive system testing and certification. The project requires strict adherence to NFPA fire alarm certification standards and original equipment manufacturer specifications. Proposals must be submitted by March 7, 2025, with the expectation that work will commence within 10 days of contract award and be completed within a 14-day performance period.

The contract is set aside exclusively for small businesses and falls under the NAICS category of Ship Building and Repairing (336611). Work will be performed primarily during standard business hours (0730-1600 EST) Monday through Friday at 300 McKown Lane in Sewickley, PA. The contractor will be responsible for providing system operation training to ship's personnel and delivering a comprehensive trip report and warranty within seven days of project completion. While specific award value is not disclosed, the project involves a complete fire alarm system upgrade with detailed technical requirements outlined in the accompanying technical drawing package. The period of performance is relatively short, spanning approximately 14 days from work commencement, with all deliverables and system certifications expected to be completed within that timeframe.

Notice text

SEE SOW ATTACHED 

Attachments

Files attached to this notice, newest first
File Type Posted
OSAGE_Fire_Alram_upgrade_SOW.docx DOCX document
65B-WD_6504_2_1_-_A.pdf PDF