F35A Armament Research Facility Addition (B614)

Awarded Award Notice Posted

Solicitation number
W9127818R0065
Agency
ENDIST Mobile US Army Corps of Engineers, Department of Defense
Awarded
to Speegle Construction, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
W9127818C0026 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Eglin, Afb Fl, United States

Notice details come from SAM.gov. Updated .

Notice text

13 versions

Update #13 · Latest ·

Awarded Vendors: Speegle Construction, Inc.. Contract Award Dollar Amount: $8,600,902.48. Contract Award Date: 2018-09-28.

Update #12 ·

08/09/2018
AMEMDMENT 05
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.


Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the
specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.



SECTION Corresponding Added or Revised Paragraph PAGE, and/or Section


01 10 10 Revised Paragraphs 8.7.2.7, 14.2.2, 14.3.10, and 14.4 as indicated herein.


Appendix A Revised Drawings C-101, E-101, and E-102 as indicated herein.

.

Update #11 ·

Added: Aug 09, 2018 11:54 am 08/09/2018
AMEMDMENT 05
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.


Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the
specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


 


SECTION Corresponding Added or Revised Paragraph PAGE, and/or Section


01 10 10 Revised Paragraphs 8.7.2.7, 14.2.2, 14.3.10, and 14.4 as indicated herein.


Appendix A Revised Drawings C-101, E-101, and E-102 as indicated herein.

Update #10 ·

08/06/2018
AMEMDMENT 04
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.


Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the
specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


SECTION Corresponding Added or Revised Paragraph PAGE, and/or Section


01 10 10 Revised Paragraphs 3.19.1, 6.14.2, 6.14.9, 8.7.2.7, 8.8.6, 9.9.5, 10.4.7, 11.3.1, 11.11.1, 12.3, 13.3.2, 13.4.4, 15.2, 15.4.2, 16.1, and 16.2 as indicated herein.
Appendix A Revised Drawings V-102, C-001, C-101, C-102, C-103, C-104, C-105, C-201, C-202, C-301, C-302, E-101, E-102, A-310, and A-501 as indicated herein.
Appendix E Replaced Appendix in its entirety.

.

Update #9 ·

Added: Aug 06, 2018 1:45 pm 08/06/2018
AMEMDMENT 04
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.


Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the
specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


SECTION          Corresponding Added or Revised Paragraph PAGE, and/or Section


01 10 10          Revised Paragraphs 3.19.1, 6.14.2, 6.14.9, 8.7.2.7, 8.8.6, 9.9.5,  10.4.7, 11.3.1, 11.11.1, 12.3, 13.3.2, 13.4.4, 15.2, 15.4.2, 16.1, and 16.2 as indicated herein.

Appendix A      Revised Drawings V-102, C-001, C-101, C-102, C-103, C-104, C-105, C-201, C-202, C-301, C-302, E-101, E-102, A-310, and A-501 as indicated herein.

Appendix E      Replaced Appendix in its entirety.

Update #8 ·

07/26/2018
AMENDMENT 03

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS


The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the
specification in the proper numerical/alphabetical sequence.


Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


SECTION Corresponding Added or Revised Paragraph/Page,and/or Section


SF1442 Revised Block 13.A as indicated herein.


00 11 00 Revised Paragraph 4.3 as indicated herein.


01 00 01 Revised Requests for Information Paragraph as indicated herein.

.

Update #7 ·

Added: Jul 26, 2018 3:30 pm 07/26/2018
AMENDMENT 03

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS


The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the
specification in the proper numerical/alphabetical sequence.


Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


SECTION Corresponding Added or Revised Paragraph/Page,and/or Section


SF1442 Revised Block 13.A as indicated herein.


00 11 00 Revised Paragraph 4.3 as indicated herein.


01 00 01 Revised Requests for Information Paragraph as indicated herein.

Update #6 ·

07/25/2018
AMENDMENT 02

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.


Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


SECTION Corresponding Added or Revised Paragraph/Page,and/or Section


01 10 10 Revised Paragraphs 3.5.1, 3.15.1, 3.19.1, 6.3.5, 6.4.5, 6.14.2, 6.14.9.7, 7.2, 8.8.14, 9.2, 9.7.2, 9.14, 13.3.1, 13.3.3.3, 13.4.4, and 13.4.5 as indicated herein. Added Paragraph 3.20 as indicated
herein.


01 10 12 Revised Paragraphs 2.4.4 and 6.3.1 as indicated herein.


01 14 00 Revised Paragraphs 1.4.4.3, 1.4.5.3, 1.4.6, 1.4.6.1, 1.4.6.2, 1.4.6.3, 1.4.6.4, 1.4.6.5, and 1.4.6.6 as indicated herein.


Appendix A Revised Sheets C-101, C-102, C-502, E-101, E-102, A-103, A-201, and A-310 as indicated herein.


Appendix B Revised Sheet I-601 as indicated herein.


Appendix G Added pages to end of appendix as indicated herein.

.

Update #5 ·

Added: Jul 25, 2018 2:28 pm 07/25/2018
AMENDMENT 02

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.


Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


SECTION Corresponding Added or Revised Paragraph/Page,and/or Section


01 10 10 Revised Paragraphs 3.5.1, 3.15.1, 3.19.1, 6.3.5, 6.4.5, 6.14.2, 6.14.9.7, 7.2, 8.8.14, 9.2, 9.7.2, 9.14, 13.3.1, 13.3.3.3, 13.4.4, and 13.4.5 as indicated herein. Added Paragraph 3.20 as indicated
herein.


01 10 12 Revised Paragraphs 2.4.4 and 6.3.1 as indicated herein.


01 14 00 Revised Paragraphs 1.4.4.3, 1.4.5.3, 1.4.6, 1.4.6.1, 1.4.6.2, 1.4.6.3, 1.4.6.4, 1.4.6.5, and 1.4.6.6 as indicated herein.


Appendix A Revised Sheets C-101, C-102, C-502, E-101, E-102, A-103, A-201, and A-310 as indicated herein.


Appendix B Revised Sheet I-601 as indicated herein.


Appendix G Added pages to end of appendix as indicated herein.

Update #4 ·

07/20/2018

AMENDMENT 01


PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS


The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised
paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part
of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence. Within the specifications, deletions from the specifications are
indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


SECTION Corresponding Added or Revised Paragraph Page, and/or Section


00 11 00 Revised Paragraph 4.3 and Attachment 4 as indicated herein.


00 12 00 Revised Paragraph 3.3 as indicated herein.


00 70 00 Deleted UAI 5152.236-9009 as indicated herein.

.

Update #3 ·

Added: Jul 20, 2018 10:27 am 07/20/2018

AMENDMENT 01


PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS


The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised
paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part
of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence. Within the specifications, deletions from the specifications are
indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.


SECTION Corresponding Added or Revised Paragraph Page, and/or Section


00 11 00 Revised Paragraph 4.3 and Attachment 4 as indicated herein.


00 12 00 Revised Paragraph 3.3 as indicated herein.


00 70 00 Deleted UAI 5152.236-9009 as indicated herein.

Update #2 ·


THIS IS A TOTAL SMALL BUSINESS SETASIDE

UTILIZING FAR PART 15 SOURCE SELECTION PROCEDURES


THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM(NAICS) CODE FOR THIS PROJECT IS 236220.



Estimated Cost Range $5,000,000.00 to $10,000,000.00.



This project requires design and construction of a new 10,134 gsf 2-story addition and alterations to existing Building B.614 controlled access building. The new addition includes office, storage and classroom/training functions in a controlled access secure environment with secure areas that require specified physical security measures. The addition shall connect to the existing building that is also a controlled access secured facility with physical security measures that operates on a regular and after duty hours basis that will be occupied and shall remain in operational including all building services and security provisions during all phases of construction of the new addition, alterations and related demolition and sitework. Other spaces include open office with workstations, conference rooms, break rooms, and restroom facilities. Additionally, there are the interior systems to include electrical, fire suppression, plumbing, HVAC, A/V, classified and unclassified communications and data systems, fire alarm / mass notification system, intrusion detection system (IDS), access control system (ACS), closed circuit television systems (CCTV), HVAC DDC controls, etc.


The scope of alterations to the existing building for this project is primarily for the connection of the new addition to the existing building envelop and related demolition, connection of the addition corridors to the existing building corridors and internal circulation elements, and connections to the existing building support systems that include, but not limited to; classified and unclassified communications and data systems, fire alarm / mass notification system, IDS, ACS, CCTV, HVAC DDC controls, etc.


The site work and supporting facilities required include, but not limited to; new site improvements, modification to existing improvements, new and rework of existing utilities, new parking as an expansion to an existing parking lot and reconfiguration of existing parking, landscaping, and related demolition.


The North American Industry Classification System (NAICS) code for this project is 236220.


Note No. 1: All prospective contractors and their subcontractors and suppliers must be registered in Federal Business Opportunities (FedBizOpps) before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/ prior to award of this contract. Solicitation documents, plans and specifications will only be available via FedBizOpps. Registration for plans and specifications should be made via FedBizOpps Internet Homepage. If you are not registered, the United States Government is not responsible for providing you with notifications of any changes to this solicitation. The solicitation will be available only as a direct download. This solicitation will not be issued on CD-ROM. Neither telephonic, mailed, nor fax requests will be accepted. Registration should be completed one week prior to the issue date. It is therefore the Contractor's responsibility to monitor the website daily for the solicitation to be posted, and for any posted changes or amendments to this solicitation. The plans and specifications and all notifications of changes to this solicitation shall only be made through this posting and modifications hereto. Plans and specifications will not be provided in a printed-paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government's best interest. NOTE: This solicitation is in .pdf format and requires Adobe Acrobat Reader. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader.


Note No. 2: All bid forms, bid bonds, and other normal documents required for the bid submittal, including amendments to the bid submittal, shall be in paper medium. Electronic medium for the bid submittal documents will not be allowed.


Note No. 3: Critical path method (network analysis system) is required.


Note No. 4: For this job, a small business is defined as having average annual receipts of less than $36,500,000 for the past three years.


Note No. 5: This solicitation includes bid options which may not be awarded.


Note No. 6: All advertisements of Mobile District projects will be through the Federal Business Opportunities (FedBizOpps). Detailed information on this and other Mobile District Projects (Ordering Solicitations, Points of Contact, Synopsis of Work, etc.) are available on the Internet at: https://www.fbo.gov.


Address questions concerning downloading of plans/specifications to Plans Room at phone number 251-690-2536.


Note No. 7: A Contractor Site Visit has been scheduled for 11 July 2018 from 9:00 am to 11:00 am. The only purpose of the site visit is to become familiar with the existing site conditions. Requests for Information (RFIs) generated from the site visit must be entered into the ProjNet Contractor RFI system for responses. Attendance at the site visit is strongly recommended. Due to Base Security requirements and limited field staff available for construction contractor site visits, this scheduled site visit will be the only one offered. Individual requests for site visits will not be granted. Contractors will be required to register with Ms. Josephine Bochiechio-Pace by close of business on 09 July 2018 and provide their given name (as it appears on their driver's license), social security number, date of birth, the project name, name of the company that they represent, and a state driver's license number. Contractors must provide a list with the names of the persons to be attending the site visit on Company Letterhead and email it to Ms. Josephine Bochiechio-Pace at the number shown below. Request for attendance received after the date shown above will not be accepted. The number of attendees is limited to four from each firm.


Name: Ms. Josephine Bochiechio-Pace
Email: Josephine.R.Bochiechio-Pace@usace.army.mil


Contractors must meet at the site, located at the corner of Gaffney Road and Hatchee Road at the time and date listed above.


Contractors will be required to register with Ms. Josephine Bochiechio-Pace for installation access, and will be required to provide a valid driver's license, proof of insurance, and vehicle registration to gain access to the installation.


Note No. 8: The request for information (RFI) process for bidder inquiries during the advertisement period will be through the ProjNet internet based system, and specifics will be contained in the RFP solicitation package available exclusively from FedBizOpps. Other forms of communicating RFIs to the Government will not be honored. The Government will try to respond to all questions. However, responses may not be furnished to all questions and particularly those received late in the advertisement period (0-10 days prior to bid opening.)



-- END --


.

Update #1 ·

Added: Jun 12, 2018 2:34 pm
THIS IS A TOTAL SMALL BUSINESS SETASIDE

UTILIZING FAR PART 15 SOURCE SELECTION PROCEDURES


THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM(NAICS) CODE FOR THIS PROJECT IS 236220.



Estimated Cost Range $5,000,000.00 to $10,000,000.00.



This project requires design and construction of a new 10,134 gsf 2-story addition and alterations to existing Building B.614 controlled access building. The new addition includes office, storage and classroom/training functions in a controlled access secure environment with secure areas that require specified physical security measures. The addition shall connect to the existing building that is also a controlled access secured facility with physical security measures that operates on a regular and after duty hours basis that will be occupied and shall remain in operational including all building services and security provisions during all phases of construction of the new addition, alterations and related demolition and sitework. Other spaces include open office with workstations, conference rooms, break rooms, and restroom facilities. Additionally, there are the interior systems to include electrical, fire suppression, plumbing, HVAC, A/V, classified and unclassified communications and data systems, fire alarm / mass notification system, intrusion detection system (IDS), access control system (ACS), closed circuit television systems (CCTV), HVAC DDC controls, etc.


The scope of alterations to the existing building for this project is primarily for the connection of the new addition to the existing building envelop and related demolition, connection of the addition corridors to the existing building corridors and internal circulation elements, and connections to the existing building support systems that include, but not limited to; classified and unclassified communications and data systems, fire alarm / mass notification system, IDS, ACS, CCTV, HVAC DDC controls, etc.


The site work and supporting facilities required include, but not limited to; new site improvements, modification to existing improvements, new and rework of existing utilities, new parking as an expansion to an existing parking lot and reconfiguration of existing parking, landscaping, and related demolition.


The North American Industry Classification System (NAICS) code for this project is 236220.


Note No. 1: All prospective contractors and their subcontractors and suppliers must be registered in Federal Business Opportunities (FedBizOpps) before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/ prior to award of this contract. Solicitation documents, plans and specifications will only be available via FedBizOpps. Registration for plans and specifications should be made via FedBizOpps Internet Homepage. If you are not registered, the United States Government is not responsible for providing you with notifications of any changes to this solicitation. The solicitation will be available only as a direct download. This solicitation will not be issued on CD-ROM. Neither telephonic, mailed, nor fax requests will be accepted. Registration should be completed one week prior to the issue date. It is therefore the Contractor's responsibility to monitor the website daily for the solicitation to be posted, and for any posted changes or amendments to this solicitation. The plans and specifications and all notifications of changes to this solicitation shall only be made through this posting and modifications hereto. Plans and specifications will not be provided in a printed-paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government's best interest. NOTE: This solicitation is in .pdf format and requires Adobe Acrobat Reader. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader.


Note No. 2: All bid forms, bid bonds, and other normal documents required for the bid submittal, including amendments to the bid submittal, shall be in paper medium. Electronic medium for the bid submittal documents will not be allowed.


Note No. 3: Critical path method (network analysis system) is required.


Note No. 4: For this job, a small business is defined as having average annual receipts of less than $36,500,000 for the past three years.


Note No. 5: This solicitation includes bid options which may not be awarded.


Note No. 6: All advertisements of Mobile District projects will be through the Federal Business Opportunities (FedBizOpps). Detailed information on this and other Mobile District Projects (Ordering Solicitations, Points of Contact, Synopsis of Work, etc.) are available on the Internet at: https://www.fbo.gov.


Address questions concerning downloading of plans/specifications to Plans Room at phone number 251-690-2536.


Note No. 7: A Contractor Site Visit has been scheduled for 11 July 2018 from 9:00 am to 11:00 am. The only purpose of the site visit is to become familiar with the existing site conditions. Requests for Information (RFIs) generated from the site visit must be entered into the ProjNet Contractor RFI system for responses. Attendance at the site visit is strongly recommended. Due to Base Security requirements and limited field staff available for construction contractor site visits, this scheduled site visit will be the only one offered. Individual requests for site visits will not be granted. Contractors will be required to register with Ms. Josephine Bochiechio-Pace by close of business on 09 July 2018 and provide their given name (as it appears on their driver's license), social security number, date of birth, the project name, name of the company that they represent, and a state driver's license number. Contractors must provide a list with the names of the persons to be attending the site visit on Company Letterhead and email it to Ms. Josephine Bochiechio-Pace at the number shown below. Request for attendance received after the date shown above will not be accepted. The number of attendees is limited to four from each firm.


Name: Ms. Josephine Bochiechio-Pace
Email: Josephine.R.Bochiechio-Pace@usace.army.mil


Contractors must meet at the site, located at the corner of Gaffney Road and Hatchee Road at the time and date listed above.


Contractors will be required to register with Ms. Josephine Bochiechio-Pace for installation access, and will be required to provide a valid driver's license, proof of insurance, and vehicle registration to gain access to the installation.


Note No. 8: The request for information (RFI) process for bidder inquiries during the advertisement period will be through the ProjNet internet based system, and specifics will be contained in the RFP solicitation package available exclusively from FedBizOpps. Other forms of communicating RFIs to the Government will not be honored. The Government will try to respond to all questions. However, responses may not be furnished to all questions and particularly those received late in the advertisement period (0-10 days prior to bid opening.)



-- END --


 

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity