Eugene River Avenue Facility

Awarded Limited / Sole Source Justification Posted

Solicitation number
W9127N20C0012
Agency
ENDIST Portland US Army Corps of Engineers, Department of Defense
Set-aside
No set-aside

Opportunity facts

Contract number
W9127N20C0012 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2QA Repair Or Alteration Of Restoration Of Real Property (Public Or Private)
Place of performance
Eugene Or Usa

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Portland District, published a Limited/Sole Source Justification Notice for design-build construction services to retrofit the Eugene River Avenue Facility in Eugene, Oregon into an alternate care facility to serve COVID-19 patients. The justification cited an unusual and compelling urgency under the Presidential Emergency Declaration to begin work immediately and ready the facility within 28 calendar days to provide additional isolation capacity and meet critical patient care needs in support of the pandemic response. The Corps awarded contract W9127N20C0012 to Turner Construction Company on April 17, 2020 for an amount up to $1.5 million to complete the retrofit within the required timeline.

Notice text

The purpose of this contract is to provide design-build construction services in accordance with the Presidential National  Emergency Declaration Concerning the Novel Coronavirus (COVID-19) for an Alternate Care Facility (ACF).  Work effort will consist of the design and construction to retrofit the selected space into an ACF to serve patients ranging from Non-Acute Non-COVID patients up to critical-care (COVID) patients.  This effort is to provide an ACF meeting basic healthcare functions with an emphasis on patient isolation, infection control, fire protection and life safety. This Justification is for the Eugene River Avenue Facility in Eugene, Oregon.  The period of performance for the design-build contract is 28 calendar days in total, which required performance to begin immediately to meet this schedule. 

Awarded contract W9127N20C0012 to unknown vendor for unknown amount on 2020-04-17.

Attachments

Files attached to this notice, newest first
File Type Posted
A.02 Eugene J&A Coversheet (Routed).pdf PDF
A.02 Final Approved J&A - Eugene River Avenue Facility.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity