Ethernet controller, in repair/modification of

Closed Solicitation Posted

Solicitation number
N0038325QC551
Agency
Naval Supply Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing
PSC
6210 Indoor And Outdoor Electric Lighting Fixtures
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy Naval Supply Systems Command is seeking contractors for the repair and modification of Ethernet controllers through this solicitation. The procurement falls under NAICS code 335999 for All Other Miscellaneous Electrical Equipment and Component Manufacturing. Key contract requirements include a 12-month warranty period with 60 days after discovery for warranty claims, compliance with Buy American provisions and Free Trade Agreements, and adherence to Commercial Asset Visibility (CAV) system reporting requirements. The contract emphasizes Repair Turnaround Time (RTAT) definitions, measuring delivery requirements from asset return to acceptance, with contractors required to report all transactions within five business days of receipt. The solicitation was posted on August 4, 2025, with a tight deadline for responses due August 6, 2025.

This opportunity does not utilize any set-aside designations and is open to full and open competition. No incumbent contractors or specific award values are mentioned in the available documentation. The contract includes higher-level quality requirements and inspection and acceptance procedures for supplies, with the contractor required to maintain accurate transaction reporting in the CAV system with action dates reflecting actual physical receipt dates. Performance location details are not specified in the solicitation notice, though the contract involves repair services that would typically be performed at the contractor's facility. The procurement includes priority rating considerations for national defense, emergency preparedness, and energy program use, indicating the strategic importance of these Ethernet controller repair services to naval operations.

Notice text

CONTACT INFORMATION|4|N792.06|2D3|771-229-0469 |patrick.j.horan23.civ@us.navy.mil|

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x||||||||

INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x||||||||||||||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE ||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||

WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery |||||

EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||

BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||

ROYALTY INFORMATION (APR 1984)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335999|600|||||||||||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x|

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition

asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth

regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT: ## 126 days after receipt of asset

Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.

Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such

prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.

ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR

SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.

Early and incremental deliveries accepted and preferred.

\

1. SCOPE

1.1 . Markings shall be in accordance with MIL-STD-130.

1.2 PRE-AWARD / POST AWARD REQUIREMENTS:

Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.

1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved

will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the

SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:

(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the

same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.

(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.

(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.

(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,

forgings, etc.

(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics

should be discernible from all other characteristics.

The above requirements are a subset of requirements specified in the ASO

Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with

MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval

Brochure.

The contractor shall notify NAVICP Code 072 when material required by this contract has been shipped to Destination.This shall be accomplished by sending

a copy of the DD Form 250, Material Inspection and Receiving Report to:

Naval Inventory Control Point

ATTN: Code 072

700 Robbins Avenue, Phila., PA 19111

or by submitting a facsimile to FAX: (215)697-2524, ATTN: Code 072.

1.4 The material covered in this contract/purchase order will be used in a

crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital

shipboard systems or loss of aircraft. Therefore,the material has been

designated as Critical material and special control procedures are invoked

to ensure receipt of correct material.

1.5 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3995AS2240; drawing number ( ;30003; ) ;REV B; , Revision ;APPLIES; and all details and specifications referenced therein.

1.6 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be

provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.

1.7 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.

2. APPLICABLE DOCUMENTS

DRAWING DATA=3995AS2240 |30003| C| |D| | | |

DRAWING DATA=3995AS2242 |30003| | |C| | | |

DRAWING DATA=3995AS2244 |30003| | |D| | | |

DRAWING DATA=3995AS2246 |30003| | |D| | | |

DRAWING DATA=3995AS2248 |30003| A| |C| | | |

DRAWING DATA=3995AS9999 |30003| B| |D| | | |

3. REQUIREMENTS - NOT APPLICABLE

4. QUALITY ASSURANCE

4.1 CRITICAL MANUFACTURING PROCESSES

( ;APPLIES; ) HEAT TREAT

( ;N/A; ) WELDING

( ;N/A; ) CADMIUM PLATING

( ;N/A; ) ENGINEERING CHROME PLATING

( ;N/A; ) NICKEL CHROME PLATING

( ;N/A; ) CASTING(S)

( ;N/A; ) FORGING(S)

( ;N/A; ) MPR (MATERIAL PROCESSING REQUIREMENTS)

4.2 . Mandatory Inspection Requirements:

100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).

During production, mandatory inspection is required to be accomplished by the contractor as follows:

A. Level of Inspection (LOI).

1. Critical characteristics: 100% inspection shall apply.

2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.

B. Critical characteristics:

;ALL ACTUAL DIMENSIONS OF ANY MAJOR OR CRITICAL CHARACTERISTICS SHALL BE RECORDED. THE AMBEINT TEMPERATURE SHALL BE RECORDED AT TIME MEASUREMENTS ARE TAKEN. CERTIFICATIONS TO BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERYOF CONTRACT.;

C. Major and Minor characteristics

1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.

4.3 SPECIAL INSPECTION REQUIREMENTS

( ;N/A; ) MAGNETIC PARTICLE INSPECTION

( ;N/A; ) SURFACE INSPECTION

( ;N/A; ) PENETRANT INSPECTION

( ;N/A; ) RADIOGRAPHIC INSPECTION

( ;N/A; ) ULTRSONIC INSPECTION

( ;N/A; ) HIGH SHOCK TEST

( ;N/A; ) MECHANICAL VIBRATION TEST

4.4 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying

office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of

witnessing the final inspection. The contractor shall notify by email or

TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA FAX (732) 323-1381.; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

THIS IS AN ALRE FLIGHT CRITICAL ACTION ITEM. DISREGARD QUALITY ASSURANCE ON DRAWING, REFER TO CONTRACT. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWINGUPDATE SHEET.

NAVICP REFERENCE ONLY: TDR 23-10013.

THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS"CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY THE NAVAL AIR SYSTEMSCOMMAND. ONLY THOSE COMPANIES WHO HAVE SUBMITTED REQUESTS FOR SOURCE APPROVALAND BEEN APPROVED WILL BE ELIGIBLE

FOR AWARD UNDER THIS SOLICITATION ANYCOMPANY NOT PREVIOUSLY APPROVED MAY SUBMIT A SOURCE APPROVAL REQUEST ASOUTLINED LATER IN THIS SOLICITATION.

All records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years.

/This overhaul/repair TDR is requiring the submission of data covering all parts components and assemblies, including material certifications, non-destructive inspection process data, welding procedures/qualifications; this applies only to new, replaced components

and assemblies identified on the drawing as CAI/CSI and used in the recertification of the part- CAI/CSI and alltraceability requirements do not apply to any existing asset or components contained within.

\

DATE OF FIRST SUBMISSION=ASREQ

16. REMARKS

Data Requirements (As required based on repair process/procedure):

a. Copies of all approved requests for variations.

b. Firmware installation procedure per Note 4 of Drawing 3995AS2240.

c. Testing of spares per Note 6 of Drawing 3995AS2240.

d. Identification per Notes 8, 10, 11, and 12 of Drawing 3995AS2240.

DATE OF FIRST SUBMISSION=ASREQ

16. REMARKS

If the extent of the repair effort for this assembly is beyond the scope of theexist-ing NAWCADLKE/NAVAIR approved overhaul/repair procedure for this assembly then the overhauling contractor or activity shall provide a step-by-step overhaul procedure for

disassembly and reassembly.

The overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance "hold points" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at

final assembly are accessible for proper interim inspection.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Ethernet controller, in repair/modification of This notice · Latest solicitation Solicitation
Ethernet controller, in repair/modification of Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity