ENT Microscope Leica Brand Name Only
Awarded Award Notice Posted
- Solicitation number
- VA25917Q0432
- Agency
- Veterans Integrated Service Network 19 Veterans Health Administration, Department of Veterans Affairs
- Awarded
- to JLS Medical Products Group, L.L.C.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- VA25917P5098 Federal contract award
- NAICS code
- 333314 Optical Instrument and Lens Manufacturing
- PSC
- Not on record
- Place of performance
- 13611 E. Colfax Ave Aurora, CO 80045 United States Of America
Notice details come from SAM.gov. Updated .
Notice text
Added: Apr 21, 2017 3:23 pm
DRAFT
Statement of Work
PKG CB EQ043 Microscope, ENT
Eastern Colorado Health Care System
Denver, CO
PURPOSE
The purpose of this requirement is to deliver and install PKG CB EQ043 Microscope, ENT as part of the initial outfitting of the newly constructed VA Eastern Colorado Health Care System, Replacement Facility located at 1700 N. Wheeling Street, Aurora, CO 80045.
SCOPE
The Contractor shall deliver and install all items listed in section(s) 2.5 and 2.6.3.
All items must meet all salient characteristics defined in section 2.5.
Installation must meet manufacturer specifications.
The Contractor shall furnish all personnel, supplies, and equipment required for delivery and installation.
2.5 ITEM SPECIFICATIONS AND SALIENT CHARACTERISTICS
2.5.1. Microscope, Otolaryngology (JSN L0100.A)
Quantity: 2
Basis of Design: Leica Model M320-Wall Mounted Brand Name only
Specifications/Salient Characteristics: Optical system microscope with LED lighting for clear, crisp, and bright images with depth of field with extremely long service life. The wall mounted swing arm shall have minimized vibrations and effortless positioning features. System shall have comprehensive spectrum of different binocular tubes, lenses, and handles.
W12 Wall Mount for Leica M320 Brand name only
Power Cable, 5m, North America
Optics Cr. Swing Arm
Dust Cover
HDMI Cable Kit10m
USB Cable Kit
Handles Lateral set (Pair)
Objective f=250mm man. foc.
Straight binocular tube, short T, type II
Eyepiece f. spect.w s 12.5x/17B, type II (Note: 2 each per microscope)
Full HD Video & Photo Camera
Wall Plate set for metal stud wall
Certification of Installation
Approximate Dimensions:
Parking Position: o/a 586 mm x 672 mm.
Power Requirement:
One power socket
100-240 V AC, 50/60 Hz and 100 VA
Accessories/Configuration Options: NA
Construction Materials/Type: NA
2.5.2. Wall Mount, Microscope (JSN L0100.A1)
Quantity: 3
Basis of Design: Leica Model LW12 Wall Mount Brand Name only
Specifications/Salient Characteristics: Shall convert three (3) reuse Leica M320 F12 (M320 on floor stands) to Leica M320 LW12 (M320 on wall mounts). At a minimum the following items are needed to make the conversion from stand to wall mounted.
W12 Wall Mount for M320 or Equal
M320 Optics Cr, Swing Arm, incline C/W 12 or Equal
HDMI Cable Kit 10m
USB Cable Kit
Handles Lateral Set (Pair)
Wall Plate set- metal stud wall
Certificate of Installation
Approximate Dimensions:
Parking Position: o/a 586 mm x 672 mm
Power Requirement:
One power socket
100-240 V AC, 50/60 Hz and 100 V
Accessories/Configuration Options: NA
Construction Materials/Type: NA
2.5.3. Microscope, Audiology (JSN M8535)
Quantity: 2
Basis of Design: Leica Model M320 F12
Specifications/Salient Characteristics: Optical system microscope with LED lighting for clear, crisp, and bright images with depth of field with extremely long service life. System shall have comprehensive spectrum of different binocular tubes, lenses, and handles.
Floor Stand
Power Cable, 5m, North America
Optics Car. Inc. Swing Arm, inclined
Dust Cover
Objective f=250mm man. foc.
Straight binocular tube, short, T, type II
Eyepiece f. spect. w s 12.5x/17B, type II
Handles front set
Certification of Installation
Approximate Dimensions:
78.75 H x 57 H x 24 W
Power Requirement:
One power socket
100-240 V AC, 50/60 Hz and 100 VA
Accessories/Configuration Options: NA
DELIVERY AND INSTALLATION
COORDINATION:
The Contractor shall coordinate delivery, staging areas, installation, site safety requirements, and parking with the Contracting Officer Representative (COR). The COR will be designated after contract award.
The Contractor shall participate in a pre-delivery meeting as specified in 2.6.2.3 below to determine delivery and installation dates.
The Contractor shall verify delivery date three business days prior to scheduled delivery.
DELIVERY
Delivery Timeframe: NET 3/17/17 and NLT 6/1/17
Acquisition of the above items is part of the initial outfitting and activation of the new VA medical center being constructed in Aurora, CO. Since construction is still occurring, delivery dates are approximate and will be coordinated with the successful contractor after award (see 2.6.1 Coordination).
The Contractor shall contact the COR to schedule a pre-delivery meeting to be conducted approximately 60 days prior to the initial award delivery date for verification of delivery and installation dates. The Contractor may be required to adjust the delivery date from the date specified in the contract award document. A government-requested delivery delay up to 90 days after the delivery date specified in the contract award shall be at no additional cost to the government.
Delivery Location: Contractor shall deliver all equipment to the Eastern Colorado Health Care System, 1700 N. Wheeling Street, Aurora, CO 80045
Delivery Markings: Contractor shall deliver items in manufacturer's original sealed containers with manufactures name marked thereon. Deliveries shall be marked with the PO and contract number.
Items on delivery vehicles not equipped with a Lift Gate will not be accepted. The delivery will have to be rescheduled and any delivery charges will be the responsibility of the Contractor.
A pre-delivery meeting will be conducted 60 days prior to initial award delivery date for verification of delivery and installation dates.
Delivery and Installation will be coordinated through the Contracting Officer Representative (COR). POCs for delivery and install are:
TBD
INSTALLATION
The Contractor shall deliver, install and test all equipment to manufacturer s specifications and in accordance with Federal and local safety standards.
The Contractor shall install the microscopes onto existing wall plates. Wall plates to be installed by Martek.
The Contractor shall convert three (3) reuse Leica M320 F12 (M320 on floor stands) to three (3) Leica M320 LW12 (M320 on wall mounts) once the three reuse Leica M320 F12 have been relocated to the new facility.
2.6.3.2.1. The Contractor shall reuse the binoculars, eyepieces, and objective lens from the three (3) reuse Leica M320 F12 and install these pieces onto the three (3) Leica M320 LW12 units.
2.6.3.2.2. The Contractor shall retrieve the floor stand, arm system, and optics carrier from the three (3) reuse Leica M320 F2 and turn back to Leica for trade-in credits.
Installation/Configuration shall commence upon day of delivery. All work shall be completed between 8:00 a.m. and 4:30 p.m. MST. Monday through Friday, excluding all Federal holidays (https://www.opm.gov/policy-data-oversight/pay-leave/pay-administration/fact-sheets/holidays-work-schedules-and-pay).
The Contractor shall remove all related shipping debris and cleanup any materials and tools associated with delivery and installation of the specified items. Contractor shall remove all packaging from the ECHCS premises.
The Contractor shall be responsible for any damage to the building that occurs due to Contractor error or neglect (refer to Section 5 below).
SITE CONDITIONS
Delivery may occur while the construction contractor is still working on the facility.
Delivery and installation personnel must comply with all site safety requirements, to include the wearing of PPE. Minimum requirements are hard hat, over the ankle boots, reflective safety vest, eye protection and gloves. The Contractor shall confirm site safety requirements with the COR when coordinating delivery and installation.
There shall be no smoking, eating, or drinking inside the construction site at any time.
INSPECTION AND ACCEPTANCE
The Contractor shall conduct a joint inspection upon completion of installation.
In the event deficiencies are identified, the Contractor shall provide date when the identified deficiencies will be addressed if not addressed on the date of installation.
The Contractor shall conduct a joint inspection after addressing all deficiencies.
All deficiencies identified during joint inspections shall be fixed by the Contractor prior to government acceptance of the item.
Disputes shall be resolved by the Contracting Officer.
Training, Operation and Maintenance Manuals
Binders - Quantity (2) each for items identified in section 2.5.
Digital Copies - Quantity (1) each for items identified in section 2.5.
Deliver compilation of all manufacturer recommended maintenance schedule and operation materials packaged in binder(s) to COR upon completion of installation.
Contractor shall provide clinician training not to exceed 15 people for eight (8) hours in no more than two (2) sessions.
PROTECTION OF PROPERTY
Contractor shall protect all items from damage during delivery and installation. The Contractor shall take precaution against damage to the building(s), grounds, and furnishings. The Contractor shall repair or replace any items related to building(s) or grounds damaged accidentally or on purpose due to actions by the Contractor.
Contractor shall be responsible for providing adequate floor and wall protection to minimize damage to the facility during delivery/installation of the items in section 2.5. It is recommended that all material handling equipment have rubber wheels to minimize potential damage to floors.
The Contractor shall perform an inspection of the building(s) and grounds with the COR prior to commencing work. The Contractor shall be responsible for repairing or replacing any items, components, building(s), or grounds damaged due to negligence and/or actions taken by the Contractor or its employees. The source of all repairs beyond simple surface cleaning is the facility construction contractor (or appropriate subcontractor), so that building warranty is maintained. Concurrence from the VA Facilities Management POC and COR is required before the Contractor may perform any significant repair work. In all cases, repairs shall utilize materials of the same quality, size, texture, grade, and color to match adjacent existing work.
The Contractor shall be responsible for securing the items identified in section 2.5 and its own work tools and equipment during delivery/installation.
SECURITY REQUIREMENTS
Security background checks are not required.
WARRANTY
The contractor shall provide all manufacturer(s) warranties on all parts and labor at time of delivery.
The warranties shall include all travel and shipping costs associated with any warranty repair.
Attachments
| File | Type | Posted |
|---|---|---|
| VA259-17-Q-0432-001.docx | DOCX document | |
| VA259-17-Q-0432-000.docx | DOCX document |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity