Drag Dam Drop Reconstruction, Central Montana
Awarded Award Notice Posted
- Solicitation number
- L13PS00283
- Agency
- Montana-Dakotas Region Bureau of Land Management, Department of the Interior
- Awarded
- to D & D Excavation, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- INL13PX00817 Federal contract award
- NAICS code
- 238910 Site Preparation Contractors
- PSC
- Not on record
- More information
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Mar 15, 2013 12:38 pm Modified: Apr 25, 2013 3:56 pmTrack Changes Amendment provides questions and answers from site visit and other; an updated Value Schedule; and extends the quote due date to May 10, 2013. Location: Central Montana. Summary of Work: This project will replace the Drag Dam Drop Outlet works located in Petroleum County, approximately 38 miles north of Winnett, Montana. Major items of work at this dam include: Dewater construction area if/as necessary; Excavate dam embankment for removal of existing corrugated steel outlet pipe, riser, and inlet structure; Construct precast reinforced concrete outlet conduit; Construct precast concrete spillway riser; Reconstruct dam embankment at outlet works; and, Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of soil preparation for seeding but does not include seeding. See details under Documentation.
Update #2 ·
Added: Mar 15, 2013 12:38 pm Modified: Apr 03, 2013 7:09 pmTrack Changes Location: Central Montana. Summary of Work: This project will replace the Drag Dam Drop Outlet works located in Petroleum County, approximately 38 miles north of Winnett, Montana. Major items of work at this dam include: Dewater construction area if/as necessary; Excavate dam embankment for removal of existing corrugated steel outlet pipe, riser, and inlet structure; Construct precast reinforced concrete outlet conduit; Construct precast concrete spillway riser; Reconstruct dam embankment at outlet works; and, Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of soil preparation for seeding but does not include seeding. Period of Performance: July 1 to August 20, 2013. See attachments for details. Page 2 of the Maps&Drawings will be issued under an amendment.
Update #1 ·
Added: Mar 15, 2013 12:38 pm
Location: Central Montana. Summary of Work: This project will replace the Drag Dam Drop Outlet works located in Petroleum County, approximately 38 miles north of Winnett, Montana. Major items of work at this dam include: Dewater construction area if/as necessary; Excavate dam embankment for removal of existing corrugated steel outlet pipe, riser, and inlet structure; Construct precast reinforced concrete outlet conduit; Construct precast concrete spillway riser; Reconstruct dam embankment at outlet works; and, Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of soil preparation for seeding but does not include seeding. Period of Performance: July 1 to August 20, 2013.
Estimated price range is between $25,000 and $100,000. 100% payment protection is required for construction contracts awarded over $30,000. PLEASE NOTE: the awardee will be required to obtain payment protection within ten (10) days of Notice of Award.
The RFQ is tentatively scheduled to be available on or about April 3, 2013 at www.fedconnect.net. No hard copies of the solicitation will be issued. A Site Tour may be scheduled; date, time and location will be identified in the solicitation. Response date for quotes will be on or about May 1, 2013.
This is a Small Business Set-aside. Offers will be accepted from all responsive and responsible small business concerns.
Fully and current registration in System for Award Management (SAM) at www.sam.gov is required for award.
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity