Cooling Tower Replacement
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 300NLACoolingTower-PresolicitationNotice
- Agency
- Region 9 Public Buildings Service, General Services Administration
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Los Angeles, California 90012, United States
Notice details come from SAM.gov. Updated .
Notice text
The contract is anticipated to involve the following work to be done at the federal building at 300 N. Los Angeles St., Los Angeles, CA: The overall strategic project goal of the Design-Build (DB) Contractor is for the replacement of (4) 2 Cell Cooling Towers and to perform structural sub-platform and main platform repairs and/or replacement within an occupied building without disruption to occupants and to utilize sustainable design and construction strategies where applicable and practical.
Phase 1 Cooling Tower 1 and/or 2:
- Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan.
- Furnish and set-up (1) 500 Ton temporary skid mounted Cooling Tower adjacent to the building on Los Angeles St. within a lockable chain link fence enclosure affording adequate NEC and service clearances, and pipe temporary bypass CWS/R lines to POCs in the basement.
- Provide temporary make-up water (MUW) and drain down piping indirectly to the nearest approved sanitary sewer.
- Provide temporary electrical power via a 200 KVA skid mounted genset and electrical disconnect and service power to the skid mounted Cooling Tower.
- Provide biocidal and other chemical treatment as needed for a temporary cooling tower. Obtain necessary permits and special inspections if/as required from the City of Los Angeles Public Works.
- Disconnect controls from CT-1 and/or 2, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines.
- Using a helicopter crane or other crane, demolish and remove CT-1 and/or 2 and remove from site to contractor chosen location for recycling and disposal.
- Demolish and replace CT-1 and/or 2 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty.
- Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal.
- Prepare and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty.
- Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment.
- Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness.
- Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse.
- Install engineered vibration isolators and seismic bracing for CT-1 and/or 2 and lift and install new CT(s) directly onto sub-framing.
- Repair pitch pockets and roofing as required in the work area.
- Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s).
- Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower.
- Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to-endpoint testing and verification.
Phase 2 Cooling Tower 3 and/or 4:
- Replace the (2) existing nominal 900-ton Cooling Towers (CTs) in one or two phases of construction.
- Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan.
- Disconnect controls from CT-3 and/or -4, demolish condensate drain, make-up water lines and electrical service back to the distribution panel.
- Partially demolish Condenser water supply and return lines.
- Using a helicopter crane or other crane, demolish and remove CT-3 and/or -4 and their respective CW pumps and remove from site to contractor chosen location for recycling and disposal.
- Demolish and replace CT-3 and/or -4 structural subframe(s).
- Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty.
- Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal.
- Prepare and apply corrosion resistant paint or an elastomeric coating with minimum 10-year warranty.
- Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment.
- Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness.
- Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse.
- Install engineered vibration isolators and seismic bracing for CT-3 and/or -4 and lift and install new CT(s) directly onto sub-framing.
- Repair pitch pockets and roofing as required in the work area.
- Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s).
- Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower.
- Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to- endpoint testing and verification. (Note: There is no BAS programming nor graphics scope)
The anticipated magnitude of the contract is $5M to $10M. A full and open request for proposal is anticipated to be published late February or early March 2023.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Cooling Tower Replacement | Solicitation | |
| Cooling Tower Replacement | Pre-Solicitation | |
| Cooling Tower Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity