Communications Conduit Installation, Ft Peck Dam
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9128F20B0031
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- MT 59248 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is seeking proposals for communications conduit installation at Fort Peck Dam in Montana. The U.S. Army Corps of Engineers, Omaha District, intends to issue a solicitation on or about August 24th, 2020 for the installation of new duct bank, conduit and communications cabling between buildings on site. Proposals will be accepted until September 24th, 2020. The selected contractor shall complete all work according to the technical plans and specifications, including horizontal directional drilling, trenching, excavation and underground utility identification, within 365 calendar days of receiving the notice to proceed.
The opportunity is set aside for total small businesses and utilizes NAICS code 237130 with a $36.5 million size standard. The estimated value of the contract is between $250,000 to $500,000. All questions must be submitted through ProjNet and proposals shall be completed in SAM. The place of performance will be at Fort Peck Dam in Fort Peck, Montana.
Notice text
Pre-Solicitation Notice
On or about 24 AUG 2020, the Government intends to issue a solicitation for “Communications Conduit Installation, Ft Peck Dam”. The solicitation will close on or about 24 September 2020. The solicitation is restricted to Small Businesses.
Site Visit:
Site Visit details will be provided with the release of the solicitation
Project Description:
The contractor shall complete all work as described in the technical plans and specifications. In general, this project will involve installing new duct bank, conduit, and communications cabling between the outside maintenance building and the administration building. The installation will be underground and will require horizontal directional drilling, trenching, and excavation. Before work is started, underground utilities will need to be located via potholing to prevent damage to existing underground infrastructure.
The Contractor will be required to commence work upon receipt of contract award and complete the work 365 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs:
The estimated construction cost of this project is between $250,000 and $500,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237130 - Power and Communication Line and Related Structures Construction, with a size standard for Small Business of $36.5M.
Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance).
Place of Performance:
Ft Peck Dam Project
Ft Peck, Montana 59248
Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Registration is required to access solicitation documents.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Communications Conduit Installation, Ft Peck Dam | Award Notice | |
| Communications Conduit Installation, Ft Peck Dam | Solicitation | |
| Communications Conduit Installation, Ft Peck Dam | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity