Coal Creek Bridge Construction
Awarded Award Notice Posted
- Solicitation number
- AG-04N7-S-16-0019
- Agency
- Region 6 - Pacific Northwest Region Forest Service, Department of Agriculture
- Awarded
- to West Coast Contractors, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-04N7-C-16-0017 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Powers Ranger District, Rogue River-Siskiyou National Forest, at milepost 58.28 of Forest Development Road 3300 (Agness Road) approximately 6 miles south of Powers, OR, Coos County, Oregon. Powers, Oregon 97466, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Apr 14, 2016 7:34 pm
Modified: May 25, 2016 7:19 pmTrack Changes
Description: Work for this project consists of removal of the existing corrugated metal culvert pipes and replacement with a new prestressed concrete bridge. The superstructure for the new bridge is to be precast, prestressed, concrete deck bulb-T beams supported by cast-in-place concrete pile caps on drilled piles. The project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for the construction of the Coal Creek Bridge. Work includes but is not limited to the following: Removal and disposal of two existing 10-foot diameter corrugated metal culvert pipes, structural and channel excavation, including channel realignment with in-stream structures, riprap, constructing approach roadway embankments, foundations, bridge superstructure, erosion control measures, clearing and grubbing, crushed aggregate, asphalt pavement and all other items necessary to complete the work in accordance with the plans and specifications.
Price Range is between $1,000,000 and $5,000,000. Estimated start work is July 1, 2016. Contract completion is no later than November 15, 2017. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about 4/29/2016. Solicitation will be posted under AG-04N7-S-16-0019 ONLY. A bid bond of 20 percent is required. A payment bond (100 percent) and a performance bond (100 percent) will be required after award.
Note: prospective awardees MUST be registered in the System for Award Management (SAM) to be awarded a Federal Government Contract. If you are not registered, please register at the following site: https://www.sam.gov/portal/public/SAM/
"This procurement requires the use of biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably priced. Where available, these products should first be acquired from among qualified products that fall under the umbrella of items designated through the Federal Biobased Products Preferred Procurement Program (FB4P)". "
ALTERNATE FAX: 541-618-2400 - (Due to current phone/fax issues)
Update #1 ·
Added: Apr 14, 2016 7:34 pm
Description: Work for this project consists of removal of the existing corrugated metal culvert pipes and replacement with a new prestressed concrete bridge. The superstructure for the new bridge is to be precast, prestressed, concrete deck bulb-T beams supported by cast-in-place concrete pile caps on drilled piles. The project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for the construction of the Coal Creek Bridge. Work includes but is not limited to the following: Removal and disposal of two existing 10-foot diameter corrugated metal culvert pipes, structural and channel excavation, including channel realignment with in-stream structures, riprap, constructing approach roadway embankments, foundations, bridge superstructure, erosion control measures, clearing and grubbing, crushed aggregate, asphalt pavement and all other items necessary to complete the work in accordance with the plans and specifications.
Price Range is between $1,000,000 and $5,000,000. Estimated start work is July 1, 2016. Contract completion is no later than November 15, 2017. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about 4/29/2016. Solicitation will be posted under AG-04N7-S-16-0019 ONLY. A bid bond of 20 percent is required. A payment bond (100 percent) and a performance bond (100 percent) will be required after award.
Note: prospective awardees MUST be registered in the System for Award Management (SAM) to be awarded a Federal Government Contract. If you are not registered, please register at the following site: https://www.sam.gov/portal/public/SAM/
"This procurement requires the use of biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably priced. Where available, these products should first be acquired from among qualified products that fall under the umbrella of items designated through the Federal Biobased Products Preferred Procurement Program (FB4P)". "
Attachments
| File | Type | Posted |
|---|---|---|
| Solicitation_Constructon_RFP-Coal_Creek_Bridge.pdf | ||
| Project_Drawings_4-28-2016.pdf | ||
| Return_Documents.doc | DOC document | |
| Supplemental_Specifications.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Coal Creek Bridge Construction | Award Notice | |
| Coal Creek Bridge | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity