Chiller replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140F0620R0024
Agency
Fish and Wildlife Service Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Z2NB Repair Or Alteration Of Heating And Cooling Plants
Place of performance
6232 East 29TH Street North, Wichita, KS 67220 USA
More information

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks replacement of HVAC components at the Great Plains Nature Center in Wichita, Kansas. The Department of the Interior Fish and Wildlife Service is procuring the removal of existing air-cooled chillers, pumps and valves, along with installation of new chillers, pumps, valves and HVAC controls upgrades. Proposals are due by August 26, 2020 and the evaluation will prioritize life-cycle costs, technical approach and past performance.

The opportunity is set aside for total small business concerns. The projected award value is between $500,000 to $1 million. Work will be performed at 6232 East 29th St N, Wichita, KS 67220 and will replace HVAC systems serving the 23,000 square foot nature center. Tim Officer of the Department of the Interior Fish and Wildlife Service is the point of contact for any questions at Tim_Officer@fws.gov.

Notice text

4 versions

Update #4 · Latest ·

Amendment 0001 CHILLER REPLACEMENT: The Great Plains Nature Center is a cooperative project between the U.S. Fish & Wildlife Service, Kansas Department of Wildlife, Parks & Tourism, City of Wichita and Friends of the Great Plains Nature Center. The 23,000 square foot facility provides opportunities for the public to investigate, understand and develop an appreciation for wildlife and the environment, especially the wildlife and plant species, of the Great Plains Region. The HVAC components serving this facility, as described in this package, have reached the end of their useful life and are being replaced. The contract documents include construction drawings showing the removal of existing air-cooled chiller, hydronic pumps, hydronic specialties and air handler three-way control valves. The installation of a new air-cooled chiller, hydronic pumps, hydronic specialties and air handler two-way control valves. The contract documents also show HVAC controls upgrades for the central plant system and installation of emergency chiller connections. The construction magnitude is between $500,000 and $1,000,000; with a budget toward the lower range of the magnitude. The POC for this effort is the Contracting Officer Tim Officer 303-236-4320, email Tim_Officer@fws.gov. Amendment 0003

Update #3 ·

Amendment 0001 CHILLER REPLACEMENT: The Great Plains Nature Center is a cooperative project between the U.S. Fish & Wildlife Service, Kansas Department of Wildlife, Parks & Tourism, City of Wichita and Friends of the Great Plains Nature Center. The 23,000 square foot facility provides opportunities for the public to investigate, understand and develop an appreciation for wildlife and the environment, especially the wildlife and plant species, of the Great Plains Region. The HVAC components serving this facility, as described in this package, have reached the end of their useful life and are being replaced. The contract documents include construction drawings showing the removal of existing air-cooled chiller, hydronic pumps, hydronic specialties and air handler three-way control valves. The installation of a new air-cooled chiller, hydronic pumps, hydronic specialties and air handler two-way control valves. The contract documents also show HVAC controls upgrades for the central plant system and installation of emergency chiller connections. The construction magnitude is between $500,000 and $1,000,000; with a budget toward the lower range of the magnitude. The POC for this effort is the Contracting Officer Tim Officer 303-236-4320, email Tim_Officer@fws.gov. Amendment 0002

Update #2 ·

Amendment 0001 CHILLER REPLACEMENT: The Great Plains Nature Center is a cooperative project between the U.S. Fish & Wildlife Service, Kansas Department of Wildlife, Parks & Tourism, City of Wichita and Friends of the Great Plains Nature Center. The 23,000 square foot facility provides opportunities for the public to investigate, understand and develop an appreciation for wildlife and the environment, especially the wildlife and plant species, of the Great Plains Region. The HVAC components serving this facility, as described in this package, have reached the end of their useful life and are being replaced. The contract documents include construction drawings showing the removal of existing air-cooled chiller, hydronic pumps, hydronic specialties and air handler three-way control valves. The installation of a new air-cooled chiller, hydronic pumps, hydronic specialties and air handler two-way control valves. The contract documents also show HVAC controls upgrades for the central plant system and installation of emergency chiller connections. The construction magnitude is between $500,000 and $1,000,000; with a budget toward the lower range of the magnitude. The POC for this effort is the Contracting Officer Tim Officer 303-236-4320, email Tim_Officer@fws.gov.

Update #1 ·

CHILLER REPLACEMENT: The Great Plains Nature Center is a cooperative project between the U.S. Fish & Wildlife Service, Kansas Department of Wildlife, Parks & Tourism, City of Wichita and Friends of the Great Plains Nature Center. The 23,000 square foot facility provides opportunities for the public to investigate, understand and develop an appreciation for wildlife and the environment, especially the wildlife and plant species, of the Great Plains Region. The HVAC components serving this facility, as described in this package, have reached the end of their useful life and are being replaced. The contract documents include construction drawings showing the removal of existing air-cooled chiller, hydronic pumps, hydronic specialties and air handler three-way control valves. The installation of a new air-cooled chiller, hydronic pumps, hydronic specialties and air handler two-way control valves. The contract documents also show HVAC controls upgrades for the central plant system and installation of emergency chiller connections. The construction magnitude is between $500,000 and $1,000,000; with a budget toward the lower range of the magnitude. The POC for this effort is the Contracting Officer Tim Officer 303-236-4320, email Tim_Officer@fws.gov.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Chiller replacement Award Award Notice
Chiller replacement This notice · Latest solicitation Solicitation
Chiller replacement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity