CHATTAHOOCHEE-OCONEE National Forest-Leatherwood Loop Reroute Project
Awarded Award Notice Posted
- Solicitation number
- AG-435H-S-15-0001
- Agency
- Region 8 - Southern Region Forest Service, Department of Agriculture
- Awarded
- to Tudor's Exterior Services, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-435H-C-15-0001 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Chattooga River Ranger District HWY 441 South Lakemont, Georgia 30525, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Nov 26, 2014 10:23 am Bid Due Date 12/01/2014 4:30 EST
Update #1 ·
Added: Nov 07, 2014 3:33 pm
The Frady Branch Trail System provides recreational trails for equestrians, bicyclists and hikers. This project is to construct a trail re-route. Contractor will provide layout, planning and surveying, obtain required permits, and will construct approximately 1.2 miles of non-motorized multi-use trails that are low maintenance, sustainable, and that meet the needs of the user at a reasonable price. In addition, the contractor shall close approximately 1.1 miles of poorly located, undesignated, existing trails in areas that will remain in the trail system.
The trail centerline has been mapped and flagged on the ground. The contractor will use this centerline to layout and construct the new routes within a 100 foot corridor with trail maintenance equipment.
Trails within the Leatherwood Loop Reroute Project are to be managed as "Class 3 Pack and Saddle" as found in the FSH 2309.18, Section 23.12, Exhibit 01 (attached to this solicitation). There are specific design and construction criteria required to meet this management goal. The contractor will be required to produce a site plan based upon a survey of the proposed layout.
Project Location: The work is to be performed at the Frady Branch Trail System. To locate project site from Toccoa, GA take GA-184 south for 3 miles. Turn right onto Old Historic 441 Hwy and go for 1 miles and the parking lot will be on your right.
Project Timeline
Estimated Start Date - December 1, 2014
Contract duration - 120 days
Completion Date - April 15, 2014
Estimated Price $25,000-$100,000
A Complete Solicitation Package will be Issued by 11/14/2014.
Attachments
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment.pdf | ||
| leatherwood_Map.docx | DOCX document | |
| Drawings_with_edits.pdf | ||
| RETURN_PACKAGE_docx.pdf | ||
| Leather_Design.pdf | ||
| Solicitation_Leatherwood_Trail_Reroute.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity