C-17 PSE - Gage Assembly - Air Pressure
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- FA8526-24-Q-0008
- Agency
- AFLCMC Robins AFB Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Place of performance
- Warner Robins, Georgia 31098, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is seeking a firm-fixed price contract for seventeen each NSN: 6685-01-529-3128, Gage Assembly - Air Pressure, P/N 17G130483-1 units to support the C-17 Landing Gear system for the Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base. The requirement includes one First Article, one First Article Test Plan, and one First Article Test Report, with delivery FOB Destination to locations within the continental United States. This requirement will be solicited as an 8(a) direct award considering all responsible sources. Proposals will be evaluated based on past performance using PPIRS and compliance with the Excluded Parties List System. The anticipated release date for the RFQ is February 29, 2024.
This opportunity is designated as an 8(a) competitive set-aside. The primary NAICS is 336411 and PSC is 1660. The quantity required is seventeen units totaling the Gage Assembly. All data for this C-17 weapon system is export controlled. Interested parties should request a copy of the RFQ from the points of contact listed by the anticipated RFQ date.
Notice text
*8a Direct Award*
The C-17 Program Management Office has a requirement that is for a firm-fixed price contract for seventeen (17) each NSN: 6685-01-529-3128, Gage Assembly – Air Pressure, P/N 17G130483-1, which includes one First Article, one First Article Test Plan, and one First Article Test Report. The C-17 Landing Gear employs 5 hydraulic fluid/nitrogen filled struts, four on the main landing gear (MLG) and one on the nose landing gear (NLG). A means is required at the organizational and depot maintenance levels to check the nitrogen pressure in each strut and to provide a controlled means of adjusting strut pressure. The means must provide a non-leaking interface with the MS28889 strut charging valve. A flexible interconnection between the charging valve and the pressure checking device is needed to permit visual access of the readout unit. The device attachment nut must be compatible with the .305-32 male threads on the MS28889 charging valve stem. Delivery is FOB Destination with shipments in the continental United States. This requirement will be solicited as an 8(a) direct award. All responsible sources may submit a quotation which shall be considered by the agency. The Government will utilize the Past Performance Information Retrieval System (PPIRS), Excluded Parties List System (EPLS), and other Government databases to determine contractor status before evaluating proposals. Proposals will be evaluated based on the criteria stated in the RFQ. All data for this weapon system is considered EXPORT CONTROLLED. If you desire to obtain a copy of the RFQ, your emailed request must be submitted to bobby.mitchell.8@us.af.mil and aliscia.pitts@us.af.mil. It is anticipated that the RFQ will be released on or around 29 February 2024.
Notice history
| Notice | Type | Posted |
|---|---|---|
| C-17 PSE: Gage Assembly, Air Pressure | Solicitation | |
| C-17 PSE - Gage Assembly - Air Pressure | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities