Building 592 repair front entry , kafb

Awarded Award Notice Posted

Solicitation number
W912PP20Q0081
Agency
ENDIST Albuquerque US Army Corps of Engineers, Department of Defense
Awarded
to Altima Construction Inc.
Set-aside
8(a) Sole Source

Opportunity facts

Contract number
W912PP20P0063 Federal contract award
NAICS code
238350 Finish Carpentry Contractors
PSC
Z2AA Repair Or Alteration Of Office Buildings
Place of performance
Kirtland Afb Nm 87117 USA

Notice details come from SAM.gov. Updated .

Notice text

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 592 Repair Front Entry.  The work shall include the following requirements listed in the specific requirements. 

  1. Demolition
    1. Contractor must remove existing duplex receptacles, as indicated on drawings.
    2. Contractor must remove existing comm and phone, as indicated on drawings.
    3. Contractor must remove existing flooring and wall base, as indicated on drawings.
    4. Contractor must remove existing wall, as indicated on drawings.
    5. Contractor must remove existing door, frame and hardware, as indicated on drawings.
    6. Contractor must remove existing water cooler and water lines, as indicated on drawings.
    7. Contractor must remove existing heater, as indicated on drawings.
    8. Contractor must remove existing display board, as indicated on drawings.
    9. Contractor must remove existing badge reader and salvage for reinstallation, as indicated on drawings.
    10. Contractor must remove existing ceiling grid and tiles, as indicated on drawings.
    11. Contractor must remove existing lighting, as indicated on drawings.
       
  2. Construction
    1. Contractor must provide and install new flooring and rubber wall base, as indicated on drawings.
    2. Contractor must construct new walls, as indicated on drawings.
    3. Contractor must provide and install new door, frame and hardware, as indicated on drawings,
    4. Contractor must provide and install new duplex receptacles, as indicated on drawings.
    5. Contractor must provide and install new comm, as indicated on drawings.
    6. Contractor must patch and paint existing walls, as indicated on drawings.
    7. Contractor must provide and install new casework, as indicated on drawings.
    8. Contractor must provide and install new ceiling grid and tiles, as indicated on drawings.
    9. Contractor must provide and install new lighting and switches, as indicated on drawings.
    10. Contractor must provide and install new exit light, as indicated on drawings.

Awarded contract W912PP20P0063 to ALTIMA CONSTRUCTION INC. for 142245.36 on 2020-09-29.