Building 433 Repair Source Selection Office, KAFB, NM
Awarded Award Notice Posted
- Solicitation number
- W912PP23Q0054
- Agency
- ENDIST Albuquerque US Army Corps of Engineers, Department of Defense
- Awarded
- to QA Engineering LLC
- Set-aside
- 8(a) Sole Source
Opportunity facts
- Contract number
- W912PP23P0040 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Z1AA Maintenance Of Office Buildings
- Place of performance
- Kirtland AFB, New Mexico 87117, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The contract was awarded to QA ENGINEERING LLC for $113,222.00 on September 20, 2023, for demolition and new construction work. The demolition work includes removal of existing flooring, rubber wall base, electrical, and gyp. bd. at four existing optical domes. The new construction work involves patching holes, painting walls and ceilings, installing new flooring, floor transition strips, power and comm in new floor box, carpet tile, and 23/32 plywood at four existing domes.
List of products and services:
- Removal of existing flooring and rubber wall base
- Removal of existing electrical and comm
- Removal of existing gyp. bd. at four existing optical domes
- Patching holes and texturing all walls
- Painting existing walls and hard lid ceilings
- Installation of new flooring and rubber wall base
- Provision and installation of new floor transition strips
- Provision and installation of power and comm in new floor box under table
- Provision and installation of new carpet tile to match existing
- Provision and installation of new 23/32 plywood at four existing domes and painting all exposed faces.
Notice text
This action was awarded as and 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act
SOW
a.Demolition
1.Contractor must remove existing flooring and rubber wall base, as indicatedon drawings.
2.Contractor must remove existing electrical, and comm. as indicated ondrawings.
3.Contractor must remove existing gyp. bd. at four (4) existing optical domes,as indicated on drawings.
b.New Construction
1.Contractor must patch holes etc. and texture all walls as indicated on not forconstruction drawings.
2.Contractor must paint existing walls and hard lid ceilings as indicated on notfor construction drawings.
3.Contractor must install new flooring and rubber wall base, as indicated on notfor construction drawings.
4.Contractor must provide and install new floor transition strips, as indicated onnot for construction drawings.
5.Contractor must provide and install power and comm in new floor box undertable, as indicated on drawings with coordination from Building 462 Manager.
6.Contractor must provide and install new carpet tile to match existing, asindicated on not for construction drawings.
7.Contractor must provide and install new 23/32 plywood at four (4) existingdomes and paint all exposed faces, as indicated on not for constructiondrawings.
Awarded contract W912PP23P0040 to QA ENGINEERING LLC for 113222.00 on 2023-09-20.