BLM-CO - Potholes Road Improvement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140L1722Q0002
Agency
Colorado Region Bureau of Land Management, Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Z1LB Maintenance Of Highways/Roads/Streets/Bridges/Railways
Place of performance
Glade Park CO 81523

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

BLM-CO - Potholes Road Improvement - Amend 2

The purpose of this amendment is to document the pre-bid site visit. The site tour was held as advertised on a sunny nice day, but with snow on the ground. So the actual site was not visited. We were able to drive up to the entrance to the recreation area. If you have any questions, email them to the POC no later than COB on 14 January to get them answered in one more amendment.

This is a solicitation for roadwork in accordance with the attachments. The Government estimates the rough order of magnitude for this project to be between $25,000 - $100,000.

A. Description of Work: Furnishing labor, equipment, supplies, and materials, to grade and shape and existing road and parking areas, install crushed aggregate surfacing onto the prepared roadways and parking areas, and install rock barriers.

B. Location: Work under this Contract is located in Mesa County, Colorado. The work locations are shown on the drawings.

Pre-Bid Site Tour: A hosted pre-bid site tour is scheduled for 6 January at 10:00, weather and road conditions permitting. Meet at the at site - Junction of DS 9 8/10ths Road and Potholes Road shown on the map.

Basic Contracting Requirements:
1. Active Registration - www.sam
2. Invoicing and Payment - www.ipp.gov - 14 Day Prompt Pay
3. FAR Part 36 - Construction Provisions and Clauses
4. FAR Part 13 - Simplified Acquisition Procedures
5. Davis-Bacon Act Wage Requirements for Mesa County, CO
6. Bonding - Bid (20% of total bid), Performance and Payment
7. Possibility of new COVID-19 Safety Protocols - https://www.saferfederalworkforce.gov/
8. Total Small Business Set - Aside for NAICS 237990 - Size Standard: $39.5M
9. Award Basis - Low Price Technically Acceptable with a through review of your technical response.

Minimum Requirements for a Responsive Quote

1. Filled out, priced and signed SF1442.

2. Technical Proposal - see important note below.

3. Bid Bond - 20% of total price.

Note: For a sufficient technical response, you must provide a detailed and tailored plan addressing this specific project which lists your resources, equipment, personnel, recent and relevant past performance, plan of operations, supervision plan, safety plan, etc. A simple recap of the SOW or blanket statement of "will comply with SOW" is not adequate and will most likely be deemed "not technically acceptable". It does not need to be long or fancy, just needs to adequately explain your plan.

POC: Contracting Officer Robert Hall - rhall@blm.gov - 970-876-9038

Update #2 ·

BLM-CO - Potholes Road Improvement - Amend 1

The purpose of this amendment is to let you know that we are still planning on the site visit. However, there is about a foot of snow on the ground with more in the forecast. Once you leave the paved road it has been plowed, but with the snowbanks on the sides there is little room for maneuvering or turn-arounds. This will limit how many vehicles can actually travel to the work site.
If you still plan on attending the site visit, travel carefully and don't expect to see very much. We do like meeting with you and discussing our projects. If you have questions, please email me. Also, if there is enough interest, I will set up a video conference to discuss if you feel it is necessary. Overall, this is a straight forward project and the pre-bid visit is not mandatory. Bidding has been extended by one week due to inclement weather and to give you time to research with alternate sources, e.g. Google Earth, locals, etc.

This is a solicitation for roadwork in accordance with the attachments. The Government estimates the rough order of magnitude for this project to be between $25,000 - $100,000.

A. Description of Work: Furnishing labor, equipment, supplies, and materials, to grade and shape and existing road and parking areas, install crushed aggregate surfacing onto the prepared roadways and parking areas, and install rock barriers.

B. Location: Work under this Contract is located in Mesa County, Colorado. The work locations are shown on the drawings.

Pre-Bid Site Tour: A hosted pre-bid site tour is scheduled for 6 January at 10:00, weather and road conditions permitting. Meet at the at site - Junction of DS 9 8/10ths Road and Potholes Road shown on the map.

Basic Contracting Requirements:
1. Active Registration - www.sam
2. Invoicing and Payment - www.ipp.gov - 14 Day Prompt Pay
3. FAR Part 36 - Construction Provisions and Clauses
4. FAR Part 13 - Simplified Acquisition Procedures
5. Davis-Bacon Act Wage Requirements for Mesa County, CO
6. Bonding - Bid (20% of total bid), Performance and Payment
7. Possibility of new COVID-19 Safety Protocols - https://www.saferfederalworkforce.gov/
8. Total Small Business Set -Aside for NAICS 237990 - Size Standard: $39.5M
9. Award Basis - Low Price Technically Acceptable with a through review of your technical response.

Minimum Requirements for a Responsive Quote

1. Filled out, priced and signed SF1442.

2. Technical Proposal - see important note below.

3. Bid Bond - 20% of total price.

Note: For a sufficient technical response, you must provide a detailed and tailored plan addressing this specific project which lists your resources, equipment, personnel, recent and relevant past performance, plan of operations, supervision plan, safety plan, etc. A simple recap of the SOW or blanket statement of "will comply with SOW" is not adequate and will most likely be deemed "not technically acceptable". It does not need to be long or fancy, just needs to adequately explain your plan.

POC: Contracting Officer Robert Hall - rhall@blm.gov - 970-876-9038

Update #1 ·

BLM-CO - Potholes Road Improvement

This is a solicitation for roadwork in accordance with the attachments. The Government estimates the rough order of magnitude for this project to be between $25,000 - $100,000.

A. Description of Work: Furnishing labor, equipment, supplies, and materials, to grade and shape and existing road and parking areas, install crushed aggregate surfacing onto the prepared roadways and parking areas, and install rock barriers.

B. Location: Work under this Contract is located in Mesa County, Colorado. The work locations are shown on the drawings.

Pre-Bid Site Tour: A hosted pre-bid site tour is scheduled for 6 January at 10:00, weather and road conditions permitting. Meet at the at site - Junction of DS 9 8/10ths Road and Potholes Road shown on the map.

Basic Contracting Requirements:
1. Active Registration - www.sam
2. Invoicing and Payment - www.ipp.gov - 14 Day Prompt Pay
3. FAR Part 36 - Construction Provisions and Clauses
4. FAR Part 13 - Simplified Acquisition Procedures
5. Davis-Bacon Act Wage Requirements for Mesa County, CO
6. Bonding - Bid (20% of total bid), Performance and Payment
7. Possibility of new COVID-19 Safety Protocols - https://www.saferfederalworkforce.gov/
8. Total Small Business Set -Aside for NAICS 237990 - Size Standard: $39.5M
9. Award Basis - Low Price Technically Acceptable with a through review of your technical response.

Minimum Requirements for a Responsive Quote

1. Filled out, priced and signed SF1442.

2. Technical Proposal - see important note below.

3. Bid Bond - 20% of total price.

Note: For a sufficient technical response, you must provide a detailed and tailored plan addressing this specific project which lists your resources, equipment, personnel, recent and relevant past performance, plan of operations, supervision plan, safety plan, etc. A simple recap of the SOW or blanket statement of "will comply with SOW" is not adequate and will most likely be deemed "not technically acceptable". It does not need to be long or fancy, just needs to adequately explain your plan.

POC: Contracting Officer Robert Hall - rhall@blm.gov - 970-876-9038

Attachments

Files attached to this notice, newest first
File Type Posted
Attachment_3_-_Pre-bid_sign_in_sheet_0002.pdf PDF
Sol_140L1722Q0002_Amd_0002.pdf PDF
Sol_140L1722Q0002_Amd_0001.pdf PDF
Sol_140L1722Q0002.pdf PDF
Attachment_1_-_Plans_and_Specs.pdf PDF
Attachment_2_-_Wage_Determination.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
BLM-CO - Potholes Road Improvement Award Award Notice
BLM-CO - Potholes Road Improvement This notice · Latest solicitation Solicitation
BLM-CO - Potholes Road Improvement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity