BIG Triple Bay Sink

Closed Solicitation Posted

Solicitation number
36C25719Q1052
Agency
Veterans Integrated Service Network 17 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

NAICS code
333999 All Other Miscellaneous General Purpose Machinery Manufacturing
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

Statement of Work
2
The Department of Veterans Affairs in West Texas VA Healthcare System, TX is posting this combined Synopsis/Solicitation for BIG Riding Lawn Mower through the Contracting Officer in San Antonio, Texas. The government intends to make a contract award to the Lowest Price Technically Acceptable vendor that can provide the required items in accordance to the attached documents, as a result of this solicitation for quotes.
This action is a total small business set-aside for service-disabled veteran owned small business (SDVOSB) only. The NAICS is 332999. Responses to this notice will be used by the Government to make appropriate evaluations and award decisions. Please submit all required information to Ognian Ivanov via e-mail: Ognian.Ivanov@va.gov by Thursday, 07/12/2019.
A. GENERAL GUIDANCE
1. Title of Project: Triple Bay Sinks
2. Scope of Work: Upon receipt of purchase order vendor will manufacture, configure and ship the product. Once the product arrives at West Texas VA Health Care System (WTVAHCS); vendor will deinstall the current sinks and make all necessary utility disconnections, remove and transport equipment to a predetermined location within same customer facility for pickup or disposal. Vendor is responsible to install two (2) new reprocessing sinks and associated equipment, perform set up and complete initial tests to ensure functionality of equipment. Installation is for two sinks.
3. Background: WTVAHCS has a need for new equipment for the medical center s Sterile Processing Service (SPS). New SPS requirements cannot be met with the existing equipment currently in use.
4. Performance Period: Delivery shall occur when all required site preparations by facility are ready for equipment installation. This includes steam, air, water, exhaust, waste, electric, and atmospheric vent. Construction timeline expects delivery and installation date to be estimated October 2019. Install is expected to occur on a Saturday and Sunday to not disrupt patient care. Install must not take more than 2 days. Installation and testing MUST be finished by 8:00 PM central time on the second day to allow time for terminal cleaning.
5. Type of Contract: This is a firm-fixed-price agreement.
B. CONTRACT AWARD MEETING
The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kick off meeting, or has advised the contractor that a kick off meeting is waived.
C. GENERAL REQUIREMENTS Sink One
Salient Characteristics for Ergonomic Adjustable Sink
Ergonomic hydraulic sinks- **needs to be AAMI compliant
The Reprocessing Sink must be height adjustable
The sink also needs to have a minimum of a triple bay configuration
The overall sink counter length must be no more than 106"
Must also have the ability to have the following work flow configurations of left-to right
Aqua Klenz-Wash-Rinse.
Reprocessing Sink Bays
Must be commercial grade stainless steel with both wash and rinse bays
The overall dimensions must be within the measurements and not to exceed 17"x10"x 24" (432 x 254 x 610 mm)
Counter tops of the sink-
Must have an incline that prevents water dripping to floors, which can cause safety risks.
Must have the ability to adjust the height of the sink to a minimum height (range of 33-41")
Must contain/needs to include all of the following:
Stainless-steel magnetic back splash
Overhead Lighting System
Magnification Light
Faucet One-Touch Button (faucet activation)
Control Screen containing icons (touch screen) to activate software programming
Record Keeping abilities to record data
Auto Drain and Fill options
Aqua Klenz
Air and Pure Water Pistols (both sinks)
Tie-Down Kit
Overall (width, height, and length) must be a at a minimum of: 30"x33-41"x106"
Steam: dynamic pressure with steam pressure regulators, shut-off valves steam traps, insulation and pipe routing necessary to supply at least up to 97% vapor-quality steam
Air: dynamic pressure
Water: dynamic water pressure with pressure regulators with properly sized piping to prevent water hammering (water flow)
Exhaust: must be certified or approved
Waste: must have proper drain(s), sized to handle water/steam flow rates
Electric: must have electrical supply
Atmospheric Vent: vent piping for pressure relief valves that also has drip pan elbow at connection point
Must have (3) surface top slide shelves
Telecommunications options: must include the following specs and capabilities
Technical Support prior to dispatching a service technician. Allow connection to Response Center
Computer Requirements needs to have the all of the following elements
Desktop, server or virtual computer to run Remote Monitoring software, service agent and support software
Windows 10
2.5GHz Multi-Core Processor
8GB ram
10GB Free Hard Drive Space
Local admin account for assigned to connected facility network (access to Internet)
If offering equipment as a non-manufacturer (i.e. distributor) the vendor is also required to submit with their quote proof (letter, etc.) from the manufacturer that shows they are authorized as a distributor of the equipment.
D. GENERAL REQUIREMENTS Sink Two
Salient Characteristics for Ergonomic Adjustable Sink
Ergonomic hydraulic sinks- **needs to be AAMI compliant
The Reprocessing Sink must be height adjustable
The sink also needs to have a minimum of a triple bay configuration
The overall sink counter length must be no more than 106"
Must also have the ability to have the following work flow configurations of right to left Sonic Klenz-Wash-Rinse.
Reprocessing Sink Bays
Must be commercial grade stainless steel with both wash and rinse bays
The overall dimensions must be within the measurements and not to exceed 17"x10"x 24" (432 x 254 x 610 mm)
Counter tops of the sink-
Must have an incline that prevents water dripping to floors, which can cause safety risks.
Must have the ability to adjust the height of the sink to a minimum height (range of 33-41")
Must contain/needs to include all of the following:
Stainless-steel magnetic back splash
Overhead Lighting System
Magnification Light
Faucet One-Touch Button (faucet activation)
Control Screen containing icons (touch screen) to activate software programming
Record Keeping abilities to record data
Auto Drain and Fill options
Sonic Klenz
Air and Pure Water Pistols (both sinks)
Tie-Down Kit
Must have (3) surface slide shelves.
Overall (width, height, and length) m
ust be a at a minimum of: 30"x33-41"x106"
Steam: dynamic pressure with steam pressure regulators, shut-off valves steam traps, insulation and pipe routing necessary to supply at least up to 97% vapor-quality steam
Air: dynamic pressure
Water: dynamic water pressure with pressure regulators with properly sized piping to prevent water hammering (water flow)
Exhaust: must be certified or approved
Waste: must have proper drain(s), sized to handle water/steam flow rates
Electric: must have electrical supply
Atmospheric Vent: vent piping for pressure relief valves that also has drip pan elbow at connection point
Telecommunications options: must include the following specs and capabilities
Technical Support prior to dispatching a service technician. Allow connection to Response Center
Computer Requirements needs to have the all of the following elements
Desktop, server or virtual computer to run Remote Monitoring software, service agent and support software
Windows 10
2.5GHz Multi-Core Processor
8GB ram
10GB Free Hard Drive Space
Local admin account for assigned to connected facility network (access to Internet)
If offering equipment as a non-manufacturer (i.e. distributor) the vendor is also required to submit with their quote proof (letter, etc.) from the manufacturer that shows they are authorized as a distributor of the equipment.
E. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES
Training to be provided by vendor on Monday following install beginning at 7:00 am.
F. EVALUATED OPTIONAL FEATURES
Even though the contractor, at the Government s option, provides the requirements specified in this section; they are nonetheless treated with the same level of control as the mandatory specifications. The CO shall only exercise these options when requested by the COR, and when the necessary funding is available.
G. SCHEDULE FOR DELIVERABLES
All items to be delivered F.O.B. Destination during normal working hours, between 7:30am and 2:30pm, Monday through Friday.
WTVAHCS
300 W. Veterans Blvd.
Big Spring, TX 79720
H. CHANGES TO THE STATEMENT OF WORK
Changes to the statement of work are unlikely, but can be made with acceptance by both parties.
I. REPORTING REQUIREMENTS
No reporting required
J. TRAVEL
No travel required.
K. GOVERNMENT RESPONSIBILITIES
WTVAHCS will be responsible for all pre-installation requirements.
L. CONTRACTOR EXPERIENCE REQUIREMENTS
Qualifications of Key Personnel (Standard mandatory language for all task orders)
NA
Time and Materials Task Orders
NA
Firm-Fixed-Price Task Orders
NA
M. CONFIDENTIALITY AND NONDISCLOSURE
Standard mandatory language for all task orders.
N. CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
SECURITY CLAUSE : The contractor will have no reason to access sensitive VA information or the WTVAHCS computer network. Access to UpToDate will be via the Internet..

Attachments

Files attached to this notice, newest first
File Type Posted
36C25719Q1052-000.docx DOCX document
36C25719Q1052-001.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity