Bayview campground well drilling. MT. Baker ranger district
Awarded Award Notice Posted
- Solicitation number
- AG-05M6-S-17-0041
- Agency
- Region 6 - Pacific Northwest Region Forest Service, Department of Agriculture
- Awarded
- to Dahlman Pump & Well Drilling, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-05M6-C-17-0015 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- Whatcom County, Washington, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Jun 21, 2017 10:48 am Awarded.
Update #2 ·
Added: Apr 21, 2017 8:09 pm
Modified: May 10, 2017 10:54 amTrack Changes
The project consists of drilling three potable water wells on the Mt. Baker Ranger District, Mt. Baker-Snoqualmie National Forest. Work includes installing of two new hand pumps and drilling, casing, sealing, lining well to a maximum 140-foot depth or to a depth that yields a minimum of 30 gallons per minute with a minimum depth of 130 feet.
This project is located at The Bay View Campground on the Mt. Baker Ranger District of the Mt. Baker- Snoqualmie National Forest, Section 19, Township 39 North, Range 9 East, Whatcom County, Washington. Project may be reached from Sedro-Woolley, Washington by traveling east on Highway 20 follow the road for 20 miles then turn right onto FS road #1118 by following FS road approximately 2 miles Bay View Campground on the left.
No Pre Bid Meeting will be held. Project quoters are advised to visit the project site prior to submitting a quote.
The Government's estimated price for the well drilling is between $25,000 and $100,000.
This project is 100% set aside for Small Business. A payment bond will be required upon contract award.
The solicitation will be posted around May 5th 2017. The desired start of work is June 1st 2017.
Technical contact for this project is Thomas Warter at (425) 783-6082 or e-mail twarter@fs.fed.us
Update #1 ·
Added: Apr 21, 2017 8:09 pm
The project consists of drilling three potable water wells on the Mt. Baker Ranger District, Mt. Baker-Snoqualmie National Forest. Work includes installing of two new hand pumps and drilling, casing, sealing, lining well to a maximum 140-foot depth or to a depth that yields a minimum of 30 gallons per minute with a minimum depth of 130 feet.
This project is located at The Bay View Campground on the Mt. Baker Ranger District of the Mt. Baker- Snoqualmie National Forest, Section 19, Township 39 North, Range 9 East, Whatcom County, Washington. Project may be reached from Sedro-Woolley, Washington by traveling east on Highway 20 follow the road for 20 miles then turn right onto FS road #1118 by following FS road approximately 2 miles Bay View Campground on the left.
No Pre Bid Meeting will be held. Project quoters are advised to visit the project site prior to submitting a quote.
The Government's estimated price for the well drilling is between $25,000 and $100,000.
This project is 100% set aside for Small Business.
The solicitation will be posted around May 5th 2017. The desired start of work is June 1st 2017.
Technical contact for this project is Thomas Warter at (425) 783-6082 or e-mail twarter@fs.fed.us
Attachments
| File | Type | Posted |
|---|---|---|
| Copy_to_Submit_AG-05M6-S-17-0041.pdf | ||
| Solicitation_AG-05M6-S-17-0041.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity