Battery, Storage
Awarded Award Notice Posted
- Solicitation number
- SPE7MX-15-R-0145
- Agency
- Land and Maritime Defense Logistics Agency, Department of Defense
- Awarded
- to Remy Battery Co Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- SPE7MX16D0060 Federal IDV award
- NAICS code
- 335911 Storage Battery Manufacturing
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
Added: Sep 21, 2015 9:56 am
*** LTC PID Packaging Consolidated Text ***
-
PLEASE SEE GLOSSARY AT THE END OF THE DOCUMENT FOR FULL TEXT OF THE ITEM DESCRIPTION
AND PACKAGING REFERENCE NUMBERS CALLED OUT FOR EACH NSN.
NSN:014634470
BATTERY, STORAGE
REFERENCE NUMBER:ZD080
REFERENCE NUMBER:ZD071
REFERENCE NUMBER:ZD025
REFERENCE NUMBER:ZD072
SEALED LEAD-ACID, AGM
SHELF LIFE TYPE I, 18 MONTHS
REFERENCE NUMBER:CQSLK
REFERENCE NUMBER:A0003
REFERENCE NUMBER:CS241
REFERENCE NUMBER:CA071
EXCEPTION DATA:
ALL BATTERIES SUPPLIED FOR THIS NSN MUST ADHERE TO DIMENSIONS OF 908A,
USING ONLY DIMENSIONS SPECIFIED IN SPEC SPEC NEMA-C18.1M PART 1 O.D.
DIMENSIONS REQUIRED PER SPEC SPEC NEMA-C18.1M PART 1 AS FOLLOWS:
ACCEPTABLE DIMENSIONS:,,,,
LENGTH: 2 5/8" (+/- 1/16")
WIDTH: 2 5/8" (+/- 1/16")
HEIGHT (NOT INCLUDING TERMINALS): 3 13/16" (+/- 1/16")
CRITICAL APPLICATION ITEM
REMY BATTERY COMPANY, INC. DBA 06LA0 P/N UB5-6S
POWER-SONIC CORPORATION, THE 0WJ05 P/N PS-650LS
BATTSCO, LLC DBA 5VRN0 P/N UN5-6S
PREP FOR DELIVERY
LINE ITEM 00001 TYPE OF COVERAGE: DLA DIRECT, CONUS
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP:001 PRES MTHD:10 CLNG/DRY:1 PRESV MAT:00
WRAP MAT:XX CUSH/DUNN MAT:JC CUSH/DUNN THKNESS:D
UNIT CONT:E5 OPI:M
INTRMDTE CONT:XX INTRMDTE CONT QTY:XXX
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:32 -32 Type I, shelf life
PALLETIZATION SHALL BE IN ACCORDANCE WITH MD00100452 REV B DATED JULY 01, 2008
SHELF LIFE TYPE I, 12 MONTHS
THIS SHELF LIFE ITEM IS NON-EXTENDABLE, CODE H,
WITH A TOTAL SHELF LIFE OF TWELVE MONTHS.
MATERIAL FURNISHED UNDER THIS CONTRACT/ORDER
SHALL HAVE AT LEAST 85% (10 MONTHS).
Package iaw appropirate UN requirements according the applicable mode of
transportation.
************************************************************************************************************
GLOSSARY
************************************************************************************************************
PACKAGING TEXT
THE FOLLOWING PARAGRAPH APPLIES TO ALL PACKAGING CALLED OUT IN THIS DOCUMENT:
ITEM DESCRIPTION TEXT
REFERENCE NUMBER ZD080
SAMPLING:
IF THE APPLICABLE (OEM OR MILITARY) DRAWING, SPECIFICATION, STANDARD, OR
QUALITY ASSURANCE PROVISION (QAP) SPECIFIES AN ACCEPTABLE QUALITY LEVEL
(AQL), IT MAY BE USED TO ESTABLISH THE AUTHORIZED SAMPLE SIZE. HOWEVER
THE SAMPLING ACCEPTANCE NUMBER SHALL BE REDUCED TO ZERO (0). EVEN THOUGH
THE ACCEPTANCE LEVEL IS ELIMINATED, THE SAMPLE SIZE REMAINS THE SAME.
UNLESS OTHERWISE SPECIFIED IN THE OEM OR MILITARY DRAWING,
SPECIFICATION, STANDARD, OR QUALITY ASSURANCE PROVISIONS (QAPs)
CHARACTERISTICS CLASSIFIED AS CRITICAL, MAJOR AND MINOR SHALL HAVE AN
ASSIGNED AQL OF 0.10, 1.0, AND 4.0 RESPECTIVELY. ASQ H1331 TABLE 1 OR
MIL-STD-1916 SHALL TAKE PRECEDENCE OVER MIL-STD-105 AND ASQ Z1.4. THESE
PLANS ACCEPT ON ZERO DEFECTS AND REJECT THE ENTIRE LOT ON ONE DEFECT. A
ZERO BASED SAMPLING PLAN SHALL BE USED, UNLESS OTHERWISE SPECIFIED BY
CONTRACT.
REFERENCE NUMBER ZD071
Configuration Change Management - Engineering Change Proposal, Requests
for Variance (Deviation or Waiver) February 2015
1. Requirements
A. The Configuration Change Management section of SAE EIA-649-1
Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for Configuration Control of material purchased under
this contract.
B. Furnished item(s) shall conform to the approved configuration
requirements/revision specified, unless a Pre-Production Request for
Variance (deviation) or a Post-Production Request for Variance (waiver),
is processed and approved as provided by Paragraph 3. in this Standard
Text Object (STO). Hereafter, the term #Request for Variance (RFV)#
will also include Requests for Deviations and Waivers.
2. The definitions from EIA-649-1 apply to items being procured under
this solicitation/contract, with the following clarification of
Deviation & Waiver:
A. Pre-Production RFV (previously known as deviation) requests
permission to produce a product that does not conform to contract
requirements/documentation for a limited amount of time and for
specified effectivity. (A deviation differs from an engineering change
in that an approved engineering change requires corresponding revision
of the item's current approved configuration documentation, whereas a
deviation does not.).
B. Post-Production RFV (previously known as waiver) requests
approval of product found during manufacture, or after having been
submitted for Government inspection or acceptance, that departs from
specified requirements, but nevertheless is considered suitable for use
"as is" or after repair by an approved method.
3. Contractor responsibilities.
A. An Engineering Change Proposal (ECP) is used to make permanent
changes in the Government technical data package (TDP). Pending
approval of an ECP, contractual relief should be requested in writing by
the Contractor using a RFV.
B. Refer to FAR Part 48 Value Engineering for cost saving
improvements to the Technical Data Package (TDP).
C. All ECPs submitted by the Contractor will be deemed routine.
If the Contractor considers an ECP as an emergency or urgent; they
shall include in their ECP submittal an explanation and all applicable
supporting documentation. All ECPs will be reviewed for a determination
on criticality, and, if concurred to be an emergency, the appropriate
processing time-frame negotiated with the ESAs will be followed and the
Contractor will be notified of anticipated response time.
D. For ECPs, Specification Change Notices (SCNs) or RFV, the
Contractor must submit the applicable documentation listed in
sub-paragraphs D.(1) through D.(4)to the Administrative Contracting
Officer(ACO), with an information copy to the Procuring Contracting
Officer (PCO). Failure to submit a complete legible package may result
in return of the ECP/RFV without processing.
(1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2
(RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the
latest revision of EIA-649-1.
(2) DD Form 1692 (current revision) for ECP.
(3) DD Form 1694 (current revision) for RFV.
(4) DD Form 1695 (current revision) for NOR.
4. DLA#s responsibilities:
A. Upon receipt of the ECP or RFV, the PCO will ensure that the
applicable product specialist receives the copy from DCMA.
B. Within five (5) working days from the date of receipt of the
Contractor's ECP or RFV from DCMA, the PS must submit the requests and
any supporting documentation via a 339 to the appropriate Engineering
Support Activity (ESA), when applicable.
C. Routine ECPs will be processed within 90 days from receipt by
the ESA. RFVs will be evaluated and processed within 30 days from
receipt by the ESA or as negotiated with the ESA.
(1) The contractor will be notified in writing of approval by
the return of an approved copy of the ECP or RFV. Approval will be
reflected by signature of the contracting activity or a review activity
specifically identified in the contract.
(2) The contractor will be notified in writing of disapproval
including reason(s) for disapproval.
5. For an approved RFV or an approved ECP, when the request affects the
Contract, a modification will be issued to the contract incorporating
the applicable requirement changes. Only a Contracting Officer is
authorized to issue a modification incorporating the approved RFV and/or
ECP.
6. Questions regarding the status of previously submitted ECP or RFV
should be directed to the PCO.
7. The submission of an ECP or RFV by the Contractor does not affect
the required delivery date of the contract. If a delivery date change
is needed, it must be negotiated with the Contracting Officer and
documented via modification to the contract.
8. The period of time for evaluation and approval/disapproval of an ECP
and/or a RFV, as specified in Paragraph 4. C., shall not constitute
excusable delay in the performance of this Contract by the Contractor or
in any way relieve the contractor from compliance with the contract
delivery schedule. The submission of an ECP and/or RFV by the
Contractor shall not preclude the Government from exercising its rights
under any clause of the Contract. (End)
REFERENCE NUMBER ZD025
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
REFERENCE NUMBER ZD072
Hazard Communication Standard Notice:
Effective June 1, 2015, Federal Standard No. 313-E, Material Safety
Data, Transportation Data and Disposal Data for Hazardous Materials
Furnished to Government Activities, establishes the requirement for
preparation and submission of Safety Data Sheets (SDS) in lieu of
Material Safety Data Sheets (MSDS) by suppliers who provide hazardous
materials to government activities.
The Occupational Safety and Health Administration (OSHA) has modified
its Hazard Communication Standard (HCS) to conform to the United Nations
Globally Harmonized System of Classification and Labeling of Chemicals.
As a result of this change, GSA revised Federal Standard No. 313-E
requiring Safety Data Sheets for classifying chemicals and communicating
the applicable information on labels.
In accordance with the revised standard after June 1, 2015:
1. Suppliers will be required to submit, to the contracting officer for
review and approval prior to award, safety data sheets consistent with
the requirements found at 29 C.F.R. 1910.1200 for hazardous materials
delivered to the Government.
2. Suppliers will also be required to submit, to the contracting officer
for review and approval prior to award, hazardous warning labels in
accordance with 29 C.F.R. 1910.1200 for hazardous materials delivered to
the Government.
3. Finally, suppliers must train their employees on the new safety data
sheets, hazardous warning labels, and requirements of 29 C.F.R.
1910.1200.
For more information on SDS, refer to OSHAs website, available at:
https://www.osha.gov/dsg/hazcom/ghs-final-rule.html.
For information on 29 C.F.R. 1910.1200, refer to the below link:
http://www.gpo.gov/fdsys/pkg/CFR-2009-title29-vol6/pdf/CFR-2009-title29-
vol6-sec1910-1200.pdf.
REFERENCE NUMBER CQSLK
THIS SHELF LIFE ITEM IS NON-EXTENDABLE, CODE K, ,
WITH A TOTAL SHELF LIFE OF EIGHTEEN MONTHS. ,
MATERIAL FURNISHED UNDER THIS CONTRACT/ORDER ,
SHALL HAVE AT LEAST 85% (15 MONTHS) OF THE SHELF,
LIFE REMAINING AT TIME OF DELIVERY. ,
REFERENCE NUMBER A0003
MIL-STD-130N(1) DATED 16 NOV 2012.
IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY
REFERENCE NUMBER CS241
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
REFERENCE NUMBER CA071
COMMERCIAL OFF THE SHELF ITEM. ADEQUATE CATALOG
DATA IS AVAILABLE AT THE PROCUREMENT AGENCY TO
EVALUATE ALTERNATE OFFERS.
Attachments
| File | Type | Posted |
|---|---|---|
| CL14205001_(1000027647)_MR_Questionnaire.docx | DOCX document | |
| CL14205001_(1000027647).xlsx | XLSX spreadsheet |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Battery | Award Notice | |
| Battery, Storage | Award Notice | |
| Battery, Storage | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity