Barcelona Harbor Repair
Awarded Award Notice Posted
- Solicitation number
- W912P4-16-B-0003
- Agency
- ENDIST Buffalo US Army Corps of Engineers, Department of Defense
- Awarded
- to Dean Marine And Excavating, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W912P416C0008 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- 8212 Route 5 Westfield, New York 14787, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Added: Jun 24, 2016 4:32 pm
Please be advised of the following change. Sheet S-501 will be modified to call out the use of High Strength Blind Fasteners in place of above and below water welding. This change will allow for greater flexibility to make the attachments and better long term reliability of the repair. An amended drawing will follow.
The response date is extended to 1 July 2016, 3:00 PM, eastern time.
Update #4 ·
Added: Jun 23, 2016 10:47 pm
6/23/2016 - This solicitation is amended to provide the following information.
Please be advised of the following change. Sheet S-501 will be modified to call out the use of High Strength Blind Fasteners in place of above and below water welding. This change will allow for greater flexibility to make the attachments and better long term reliability of the repair. An amended drawing will follow.
The response date is extended to 1 July 2016, 3:00 PM, eastern time.
Update #3 ·
Added: Jun 16, 2016 4:20 pm
6/16/2016 - This solicitation is amended to provide answers to questions received, provide changes to the bid schedule/sheet, provide a copy of the site visit sign-in sheet, and provide copies of files that describe conditions at the project location.
The response date and time are not extended.
Update #2 ·
Added: Apr 21, 2016 1:41 pm
Modified: May 26, 2016 2:30 pmTrack Changes
26 May 2016. The Presolicitation status has been changed to Solicitation. See attached documentation. Additionally, the response date to the solicitation is 27 June 2016.
********************
The Buffalo District is currently preparing a solicitation to award a contract for repair work that is required at Barcelona Harbor, Westfield, NY.
This is not an Invitation for Bid, Request for Proposal, or a Request for Quote. This is to make industry aware of an upcoming requirement.
Barcelona Harbor is located on the southeastern shore of Lake Erie in the town of Westfield in Chautauqua County, New York, approximately 28 miles northeast of Erie, Pennsylvania and 17 miles southwest of Dunkirk, New York. The harbor supports both commercial and recreational navigation and its West Breakwater provides opportunities for shore-based activities such as fishing and bird-watching.
The harbor's navigation structures include a 693-foot long East Breakwater and 790-foot long West Breakwater. Both breakwaters were constructed of granular filled circular steel sheet pile diaphragm cells with concrete caps. As a recreational feature, a concrete access ramp extending from the Shorearm to the West Breakwater was added in 1965. In 1984, additional modifications were made to the harbor due to its history of severe and unsafe wave conditions.
Severe lake storms occurring on October 29 through November 2, 2015 caused cellular SSP failure of one cell (seventh cell from the lakeward end) along the West Breakwater. This failure resulted in the complete loss of the cell's internal granular fill down to the lake level and left the concrete cap supported only by edge friction.
Repairs are required to the failed section of a sheet pile cellular structure that will include the following: driving approximately 72 linear feet (36 feet each side) of new sheet pile and filling with stone and Government supplied concrete blocks. Piles will be flat sheets about 23 feet in length, driven to form arcs (dia. approx. 30ft.) and welded above and below water to existing steel piles. The drive lines for piles are obstructed, on one side by the failed 2 feet thick concrete cap and on the other side by armor stone. These obstructions are to be removed and reused in the work. Some damaged piles remain and will need to be removed from the drive line as well.
In water work environmental window opens on 15 June 2016.
No questions will be answered until official solicitation is issued.
Update #1 ·
Added: Apr 21, 2016 1:41 pm
The Buffalo District is currently preparing a solicitation to award a contract for repair work that is required at Barcelona Harbor, Westfield, NY.
This is not an Invitation for Bid, Request for Proposal, or a Request for Quote. This is to make industry aware of an upcoming requirement.
Barcelona Harbor is located on the southeastern shore of Lake Erie in the town of Westfield in Chautauqua County, New York, approximately 28 miles northeast of Erie, Pennsylvania and 17 miles southwest of Dunkirk, New York. The harbor supports both commercial and recreational navigation and its West Breakwater provides opportunities for shore-based activities such as fishing and bird-watching.
The harbor's navigation structures include a 693-foot long East Breakwater and 790-foot long West Breakwater. Both breakwaters were constructed of granular filled circular steel sheet pile diaphragm cells with concrete caps. As a recreational feature, a concrete access ramp extending from the Shorearm to the West Breakwater was added in 1965. In 1984, additional modifications were made to the harbor due to its history of severe and unsafe wave conditions.
Severe lake storms occurring on October 29 through November 2, 2015 caused cellular SSP failure of one cell (seventh cell from the lakeward end) along the West Breakwater. This failure resulted in the complete loss of the cell's internal granular fill down to the lake level and left the concrete cap supported only by edge friction.
Repairs are required to the failed section of a sheet pile cellular structure that will include the following: driving approximately 72 linear feet (36 feet each side) of new sheet pile and filling with stone and Government supplied concrete blocks. Piles will be flat sheets about 23 feet in length, driven to form arcs (dia. approx. 30ft.) and welded above and below water to existing steel piles. The drive lines for piles are obstructed, on one side by the failed 2 feet thick concrete cap and on the other side by armor stone. These obstructions are to be removed and reused in the work. Some damaged piles remain and will need to be removed from the drive line as well.
In water work environmental window opens on 15 June 2016.
No questions will be answered until official solicitation is issued.
Attachments
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_Barcelona_-_12JULY2016.pdf | ||
| W912P4-16-B-0003-02.pdf | ||
| Barcelona_Wall_Failure_Area_for_Contractor.xyz | XYZ file | |
| W912P4_16_B_0003-U0001-Barcelona-Solicitation_Amendment_1.pdf | ||
| Barcelona_2016_Failure_Area.pdf | ||
| Barcelona_2014-2016_Failure_Area_Comparison.pdf | ||
| W912P4-16-B-0003-26MAY2016-Barcelona.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities