Asphalt Overlay, Ava Ranger District

Awarded Award Notice Posted

Solicitation number
AG-64R4-S-17-0022
Agency
Forest Service Research Service Northern Research Station Forest Research Service, Department of Agriculture
Awarded
to Springfield Sealing Service, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG64R4P170073 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Usda Forest Service Ava Ranger District 1103 S Jefferson Ava, Missouri 65608, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: May 03, 2017 8:59 am This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; offors are being requested.

Solicitation AG-64R4-S-17-0022 is issued as RFQ under FAR Part 13.

The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-95

100% Small Business, NAICS 237310 small business size standard $36.50 Million.
Project Magnitude: Under $10,000.

Furnish all labor, equipment and materials to complete the following work:

Visitor Parking Lot Overlay:
The parking lot (332 SY) will be marked for overlay by the Forest Service. The existing parking lot surface shall be free of loose material, dirt, or other deleterious material by approved methods.
Any pot holes or significant depressions shall be filled with asphalt and compacted before overlay begins. Headers with existing asphalt pavement or concrete shall be milled before overlay to match elevation. Tack coat oil shall be applied as specified. Provide a minimum of 2" compacted depth overlay of approved hot asphalt mix. Provide three 411 wide white pavement markings 20 foot in length as located by the COR. 48 hour notice must be given before construction begins.
Contractor shall provide all traffic control to perform project. Care shall be taken not to damage existing roadway.

Warehouse Road Overlay:
The road (304 SY) will be marked for overlay by the Forest Service. The existing road surface shall be free of loose material, dirt or other deleterious material by approved methods. Any pot holes or significant depressions shall be filled with asphalt and compacted before overlay begins.
Headers with existing asphalt pavement or concrete shall be milled before overlay to match elevation. Tack coat oil shall be applied as specified. Provide 2" compacted depth overlay of approved hot asphalt mix. 48 hour notice must be given before construction begins. Contractor shall provide all traffic control to perform project. Care shall be taken not to damage existing roadway.

Site Visit: A contractor evaluation of site is recommended. A pre-bid visit with Darren Morris; Transportation Engineer, can be scheduled.

FAR 52.212-1; 52.212-2; 52.212-3; 52.212-4, 52.212-5 apply to this acquisition.

Quotes are due 5/17/17.

eMail submissions to dceaster@fs.fed.us

Attachments

Files attached to this notice, newest first
File Type Posted
AG-64R4-S-17-0022_SOLICITATION_R9_ORB.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity