Anark Core Server and Start Parts
Awarded Award Notice Posted
- Solicitation number
- N00421-18-Q-0484
- Agency
- Naval Air Warfare Center Naval Air Systems Command, Department of Defense
- Awarded
- to Anark Corporation
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- N0042118P0612 Federal contract award
- NAICS code
- 511210 Software Publishers
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Anark Core Server and Start Parts - SOW
1 Scope
1.1 Introduction
The Naval Air Warfare Center Aircraft Division (NAWCAD) (AIR 6.8) Digital Thread Environment (DT) and Additive Manufacturing (AM) Program has been tasked to procure a set of Product Lifecycle Management (PLM) and Three Dimensional (3D) Computer-Aided Manufacturing/Engineering toolsets to support all Naval Aviation Type/Model/Series (T/M/S).
1.2 Background
This Statement of Work (SOW) defines the tasks required to support the design and deliver Start Parts for SOLIDWORKS and Inventor, 3D Portable Document Format (PDF) Technical Data Package (TDP) Templates for SOLIDWORKS and Inventor, and Project Management support to extend an installation of Anark Core that resides in the NAVAIR 7.2 data center. These services shall add several CAD-specific modules to the existing Anark Core instance (which will be re-designated as a 'non-production' or development instance) and shall also provide a full separate instance of Anark Core, which will be designated 'production'.
2 Applicable Documents
Not applicable.
3 Requirements
3.1 Design Support:
Anark shall design Start Parts, one each for SOLIDWORKS and Inventor, replicating the existing NAVAIR Lakehurst Creo Start Part for each format. These Start Parts shall generate fully functional 3D PDF TDP documents from 3D SOLIDWORKS / Inventor parts and assemblies stored within Windchill and Teamcenter PLM data sources. See Figure 1
Figure 1: Anark 3D PDF TDP Generated from Native CREO+PMI CAD Models
2
3
3.1
3.2 Project Management Support
Anark shall participate in team conference call meeting as well as other correspondence such as email.
Anark shall assist and participate in project milestone meetings as required and requested by NAVAIR and the project team.
Anark shall provide monthly project status reports and a final report.
.
Update #1 ·
Added: Jun 22, 2018 2:12 pm
Anark Core Server and Start Parts – SOW
The Naval Air Warfare Center Aircraft Division (NAWCAD) (AIR 6.8) Digital Thread Environment (DT) and Additive Manufacturing (AM) Program has been tasked to procure a set of Product Lifecycle Management (PLM) and Three Dimensional (3D) Computer-Aided Manufacturing/Engineering toolsets to support all Naval Aviation Type/Model/Series (T/M/S).
This Statement of Work (SOW) defines the tasks required to support the design and deliver Start Parts for SOLIDWORKS and Inventor, 3D Portable Document Format (PDF) Technical Data Package (TDP) Templates for SOLIDWORKS and Inventor, and Project Management support to extend an installation of Anark Core that resides in the NAVAIR 7.2 data center. These services shall add several CAD-specific modules to the existing Anark Core instance (which will be re-designated as a 'non-production' or development instance) and shall also provide a full separate instance of Anark Core, which will be designated 'production'.
2 Applicable Documents
Not applicable.
3 Requirements
3.1 Design Support:
Anark shall design Start Parts, one each for SOLIDWORKS and Inventor, replicating the existing NAVAIR Lakehurst Creo Start Part for each format. These Start Parts shall generate fully functional 3D PDF TDP documents from 3D SOLIDWORKS / Inventor parts and assemblies stored within Windchill and Teamcenter PLM data sources. See Figure 1
Figure 1: Anark 3D PDF TDP Generated from Native CREO+PMI CAD Models
2
3
3.1
3.2 Project Management Support
Anark shall participate in team conference call meeting as well as other correspondence such as email.
Anark shall assist and participate in project milestone meetings as required and requested by NAVAIR and the project team.
Anark shall provide monthly project status reports and a final report.
Attachments
| File | Type | Posted |
|---|---|---|
| N00421-18-Q-0484.docx | DOCX document |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity