ADV Operator Interface Controls Upgrade
Closed Pre-Solicitation Posted
- Solicitation number
- P20-004
- Agency
- Air Force Sustainment Center Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333999 All Other Miscellaneous General Purpose Machinery Manufacturing
- PSC
- 7030 Information Technology Software
- Place of performance
- Tinker AFB, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The Air Force intends to solicit and award a firm fixed price, sole source purchase order to Progressive Surface, Inc (CAGE 06EH8) under the authority of FAR 13.106-1(b)(1), for the purchase of ADV Opertator Interface Controls Upgrade for the Oklahoma City-Air Logistics Complex (OC-ALC).
Contractor registration in the System for Award Management (SAM) is required prior to receiving any contracts or orders from the Government. Contractors can register electronically at https://www.sam.gov/portal/public/SAM/ . The NAICS code for this requirement is 333999 with a size standard of 500 employees.
Interested persons may identify their interest and capability to respond to the requirement by submitting a quote and information. Electronic procedures will be used for this solicitation through bettaSam at https://beta.sam.gov/. No telephone requests. Authority is 10 USC 2304(c)(1).
Each machine will require the following upgrades from the Contractor:
a. Updated PRIMS Pro software to run in Windows 10 Operating System
b. New 64-bit PC, with Windows 10, interface & controller to operate new PRIMS Pro software
c. PC/controller must be configured to work with the existing shot peen equipment.
d. Each machine must receive a 19 inch touchscreen interface monitor rated for the industrial environment and be compatible with PC/controller
e. FAST Ethernet with be added to the CNC controller by the Contractor
f. Updated machine drawings, service manuals, and operation descriptions shall be provided by the Contractor.
Update #1 ·
Each machine will require the following upgrades from the Contractor:
a. Updated PRIMS Pro software to run in Windows 10 Operating System
b. New 64-bit PC, with Windows 10, interface & controller to operate new PRIMS Pro software
c. PC/controller must be configured to work with the existing shot peen equipment.
d. Each machine must receive a 19 inch touchscreen interface monitor rated for the industrial environment and be compatible with PC/controller
e. FAST Ethernet with be added to the CNC controller by the Contractor
f. Updated machine drawings, service manuals, and operation descriptions shall be provided by the Contractor.
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity