ADA Compliant Path and Trail
Awarded Award Notice Posted
- Solicitation number
- 140P4318Q0053
- Agency
- National Park Service Department of the Interior
- Awarded
- to Classic Site Solutions Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 140P4318C0040 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Added: Jun 06, 2018 3:39 pm Modified: Aug 08, 2018 2:19 pmTrack Changes Award of Marconi Station Site ADA Compliant Path at the Cape Cod National Seashore (CACO), Wellfleet, MA.
Update #4 ·
Added: Jun 06, 2018 3:39 pm
Modified: Jul 19, 2018 9:44 amTrack Changes
*** Acknowledge this amendment when submitting your quote. ***
The purpose of this amendment is to:
1) Answer a prospective quoter's question:
Q7. Solicitation special provision#01 require to submit detailed project design with the quote, please advise how or who will compensate contractor for associated design cost?
A7a. Special Provision #01: Submit with Quote: is changed to read - - - The contractor's quote shall include time allotted for detailed project design of the ramp and layout of the path, along with a projected schedule. The schedule shall be based on the number of days after award.
A7b. Statement of Work section Submittals is change to read - - - The contractor's quote shall include time allotted for detailed project design of the ramp and layout of the path, along with a projected schedule. The schedule shall be based on the number of days after award. After the award the contractor shall submit one PC compatible CD-ROM and 2 paper copies of the design. Any deviation from project drawings will be documented via as-built drawing mark-ups.
A7c. Refer to clause "Expenses Related to Offers" found in Section H, Special Contract Requirements, of the RFQ.
2) The Quote due date and time remain unchanged: 2pm ET on Wednesday, July 25, 2018.
(End of amendment)
Update #3 ·
Added: Jun 06, 2018 3:39 pm
Modified: Jul 17, 2018 4:11 pmTrack Changes
*** Acknowledge this amendment when submitting your quote. ***
The purpose of this amendment is to:
1) Answer prospective quoters' questions:
Q1. The Statement of work states "Installation of the southern route directly to the parking lot will comply with ADA access standards." Although railings are required for the recycle lumber boardwalk ramp, the SOW does not address the need for handrails along the asphalt pathway to the parking lot. Should the asphalt path have handrails to comply with ADA. Is so, please provide a details or desired materials for handrail construction.
A1. Answer: Railings not needed until slope exceeds 5%.; that is why they are only specified for the boardwalk ramp. Contractors may engage engineers to review plans for accessibility compliance before proceeding.
Q2. The Statement of Work states that Asphalt and carpentry treatments will be standard. Please provide a typical paving section showing the desired thickness of asphalt and subbase material required.
A2. See Attachment A0101 for typical paving section.
Q3. The Statement of Work (Permits and Approvals) states in part "All work performed under this contract shall be done in accordance with applicable local, State and Federal codes, bylaws and regulations in effect at the time of this work." Considering the location of the work, the cutting of vegetation and manipulation of the dune, are any permits required for this work? If so, are they the responsibility of the contractor?
A3. The NPS completed both the National Environmental Policy Act (NEPA) and the National Historic Preservation Act (NHPA) compliance reviews for the project and no permits are required.
Q4. With a performance period of 30 days after Notice to Proceed (NTP), when does the Government plan to issue NTP?
A4. We plan to issue in a timely fashion once required submittals have been received, found acceptable, and Pre-construction conference is conducted.
Q5. The grading on the conceptual site plan provided with the Statement of Work shows multiple runs between landings at 5 percent between 100 and 150 ft long. It is my understanding that in order to comply with ADA, you cannot have a rise of more than 30" in any single run (between level landings). As drawn, the rise of the runs between level landings will be from 60 - 90 inches, far above the maximum allowed by ADA. Please advise if this grading plan provided with the SOW should be used as a basis of pricing for this project.
A5. Landings are not needed until grade exceeds 5% slope. Contractors may engage engineers to review plans for accessibility compliance before proceeding.
Q6. The scope of work requests Polyforce or equal structural recycled lumber. The nearest Polyforce distributor is in NJ. For the small quantities needed it may not be economical to ship these materials. In addition, if sizes needed are not in stock, lead time is 3-4 weeks. With a 30 day performance period, would a pressure treated structural frame with composite decking/railings be acceptable as an alternative.
A6. A pressure treated structural frame with composite decking/railings is an acceptable alternative; please specify if this is the material selection. Under Federal Acquisition Regulation (FAR) clause, as included in this RFQ, 52.249-10, Default (Fixed-Price Construction), the contractor may request that Contracting Officer extend the period of performance for several reasons including: Delays of subcontractors or suppliers at any tier arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and the subcontractors or suppliers.
2) Extend the Responses due Day until 2pm ET on Wednesday, July 25, 2018.
3) AutoCAD Drawings are attached as Attachment A0102 through A0111.
4) Update applicable Wage Rate Requirements (Construction) Wage Determination to MA180020 Rev. 3 dated 07/06/2018 [See attached].
(End of amendment)
Update #2 ·
Added: Jun 06, 2018 3:39 pm
Modified: Jun 21, 2018 10:06 amTrack Changes
This Request for Quote (RFQ) is made using the procedures of Federal Acquisition Regulation (FAR) Part 13, Simplified Acquisition Procedures. BASIS FOR AWARD: The Government intends to award a contract to the responsible quoter whose quote, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.
Note: Prospective contractors shall be registered in the System for Award Management (SAM) database prior to award of a contract. Initiate/Update SAM registrations at https://www.sam.gov.
Requests for the Statement of Work and RFQ are directed to view the entire RFQ on the Governmentwide point of entry available via the Internet at https://www.fbo.gov/ using Keyword / Solicitation #: 140P4318Q0053.
This RFQ is restricted to small businesses in accordance Federal Acquisition Regulation (FAR) 6.203 -- Full and Open Competition After Exclusion of Sources, Set-Asides for Small Business Concerns. The RFQ will be set-aside for 100% for Small Businesses under NAICS Code: 237310, Highway, Street, and Bridge Construction, (SBA size standard $36.5 Million).
The order of magnitude for this project is estimated to be between $25,000 and $100,000.
Location of Work: The location of this work is at the Cape Cod National Seashore, Marconi Site Road, Wellfleet, MA, 02667-8142.
Period of Performance is 30 days after Notice to Proceed.
The scope of this consists of installation of an accessible asphalt trail from the parking lot to an ocean overlook platform, the removal an old boardwalk, and installation of a new asphalt path from the boardwalk towards the historic site.
Dept. of Labor, Construction Wage Rate General Decision Numbers: MA180020 shall apply.
Interested parties are strongly encouraged to inspect site prior to proposing. For Site-visit information See clause 52.236-27, found in the RFQ, for the time and location of the site-visit along with the Point of Contact information.
Any questions regarding this solicitation shall be submitted in writing to the Contract Specialist, David Barceleau, at david_barceleau@nps.gov. Questions should be submitted no later than two business days prior to the due date.
Update #1 ·
Added: Jun 06, 2018 3:39 pm
The contemplated Request for Quote (RFQ), 140P4318Q0053, will consist of installation of an ADA compliant accessible asphalt trail from the parking lot to an ocean overlook platform, the removal an old boardwalk, and installation of a new asphalt ADA complaint path from the boardwalk towards the historic site.
Location of Work: The location of this work is at the CAPE COD NATIONAL SEASHORE, Marconi Site Road, Wellfleet, MA, 02667-8142.
The order of magnitude for this project is estimated to be, including options, between $25,000 and $100,000.
Tentative date for issuing the RFQ is on or about June 21, 2018.
Tentative closing date of the RFQ is on or about July 10, 2018.
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the Notice to Proceed is issued by the Government. The time stated for completion shall include final cleanup of the premises.
Plans will be available for inspection without charge as attachments to the RFQ.
Requests for the RFQ shall be directed to view the entire RFQ on the Governmentwide point of entry available via the Internet at https://www.fbo.gov/ using Keyword / Solicitation #: 140P4318Q0053.
Award is restricted to small businesses in accordance Federal Acquisition Regulation (FAR) 6.203 -- Full and Open Competition After Exclusion of Sources, Set-Asides for Small Business Concerns. The RFQ will be set-aside for 100% for Small Businesses under NAICS Code: 237310, Highway, Street, and Bridge Construction, (SBA size standard $36.5 Million).
The contemplated RFQ will utilize FAR Part 13, Simplified Acquisition Procedures.
Dept. of Labor, Construction Wage Rate General Decision Numbers: MA180020 shall apply.
Solicitation documents, including technical data, will be available free of charge through the Governmentwide point of entry available via the Internet at http://www.fedbizopps.gov.
All responsible sources may submit a quote which shall be considered by the agency.
Attachments
| File | Type | Posted |
|---|---|---|
| FedConnect File | — |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity