Abatement, Flooring & Lighting KAFB
Awarded Award Notice Posted
- Solicitation number
- W912PP20Q0045
- Agency
- ENDIST Albuquerque US Army Corps of Engineers, Department of Defense
- Awarded
- to Altima Construction Inc.
- Set-aside
- 8(a) Sole Source
Opportunity facts
- Contract number
- W912PP20P0032 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 20676, 20752 & 20754 – Abatement, Flooring & Lighting
B20676 contractor to verify sf. listed in Table 1, below.
- Demolition
Contractor shall move wall shelving in preparation for work in room 104.- Contractor shall Remove and abate flooring in Room 104.
- Contractor shall remove flooring. As indicated in Table 1, below.
- Contractor Shall Demo/Remove four (4) humidifiers as indicated in Table 1, below.
- Construction
Contractor to provide and install new epoxy flooring in rooms indicated in Table 1, below.- Contractor shall provide and install twenty-six (26) dimmers in all rooms indicated in Table 1, below.
Contractor shall provide and Install, fifty-two (52) 2x4 and two (2) 1x4 wraps, New Fluorescent LED Ceiling Lights with compatible energy fixtures with UV Protection in locations referenced on Table 1, below.- Installation requirements must match United Facilities Criteria and all KAFB requirements.
Contractor Shall Patch/Repair/Repaint as indicated in Table 1, below.- Task performed must match United Facilities Criteria and all KAFB requirements.
- Task performed must match United Facilities Criteria and all KAFB requirements.
- Installation requirements must match United Facilities Criteria and all KAFB requirements.
- Contractor shall use new surface mounted conduit for relocation of existing electrical outlet in RM 104 as indicated in Table 1, below.
- Contractor shall reinstall shelving upon completion of work in room 104.
- Contractor shall provide and install twenty-six (26) dimmers in all rooms indicated in Table 1, below.
- Reachback Electrical: Contractor to hardwire/connect the cubicle furniture to existing pourer sources in floor/wall, qty. seven (7).
B20752 & B20754 approx. 900 sf, contractor to verify sf.
- Demolition
- Contractor shall remove existing flooring, disposing of material properly, and encapsulate asbestos, as indicated. See building plan below, indicated in red.
- B20754 – Hallway NWC
- B20752 – Laboratory Gen, Storage.
- Contractor shall remove existing flooring, disposing of material properly, and encapsulate asbestos, as indicated. See building plan below, indicated in red.
- Construction.
- Contractor to provide and install flooring. Government will provide part of new rubber flooring material, Contractor will need to provide approximately 3 rolls of 7’wide x 20’long rubber flooring material and all necessary installation materials, i.e. glue, as required.
- Contractor to provide and install flooring. Government will provide part of new rubber flooring material, Contractor will need to provide approximately 3 rolls of 7’wide x 20’long rubber flooring material and all necessary installation materials, i.e. glue, as required.
Awarded contract W912PP20P0032 to ALTIMA CONSTRUCTION INC. for 191802.04 on 2020-06-19.