A-10 Inboard Flap Track Assembly

Closed Solicitation Posted

Solicitation number
FA821221Q0803
Agency
Air Force Sustainment Center Air Force Materiel Command, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC
1560 Airframe Structural Components

Notice details come from SAM.gov. Updated .

Notice text

THIS IS A FULL SMALL BUSINESS SET ASIDE

VENDORS MUST BE PREQUALIFIED TO PROVIDE A BID. QUALIFICATION REQUIRMENTS ARE ATTACHED.

TO ACCESS BIDSET PLEASE REQUEST THROUGH THIS SITE AND SEND A COPY OF CURRENT DD2345 FORM TO RICHARD.MAYNARD.5@US.AF.MIL AND REQUEST DATA RELEASE.

There are significant technical requirements to ensure that the configuration baseline for the A-10 Inboard Flap Track Assembly is met. Vendors will have to pass government First Article testing which includes an audit of all material and processing certifications (including but not limited to heat treatment, shot peen, etc.), non-destructive inspections (including but not limited to ultrasonic, penetrant, and magnetic particle), corrosion inhibiting applications. Dimensional requirements must meet Form-Fit-Function needs that ensure approved manufacturing processes have been followed and correct materials were used.

This item is a Critical Safety Item (CSI) that requires an AS9100 level of contract quality inspection. The requirements for the Flap Track Assembly are unique to the military and cannot be acquired in the commercial sector.

Performance Requirements:

Vendors must demonstrate knowledge/experience on items of similar scope and complexity in regards to the following items in order to be considered capable of performing to the requirements of this contract:

• Show knowledge/experience of design and manufacture of wedge assemblies

• Show that manufacturing capabilities exist to provide this part

• Vendor should have capability to create necessary tooling required in the manufacture of the trailing edge wedge assembly

• Show capability to perform acceptance testing of the trailing edge wedge assembly

• Vendor should have past experience/knowledge with military flight worthiness requirements

The flap track assembly has to pass First Article testing. This includes an audit of all certificates to ensure that appropriate procedures have been followed and that correct materials were used. As part of the first Article testing a dimensional inspection will be performed

Attachments

Files attached to this notice, newest first
File Type Posted
SECTIONC6480FJ.pdf PDF
IUID1116FJ.pdf PDF
462ATTACHMENTA6480FJ.pdf PDF
ENGINEERINGDATALIST1116FJ.pdf PDF
PACKAGINGREQUIRMENTS.pdf PDF
SECTIONC1116FJ.pdf PDF
ITEMDESCRIPTION6480FJ.pdf PDF
260FIRSTARTICLE6480FJ.pdf PDF
ENGINEERINGDATALIST6480FJ.pdf PDF
SPECIALPACKAGINGINSTRUCTION1116FJ.pdf PDF
STATEMENTOFWORK.pdf PDF
IUID6480FJ.pdf PDF
FA821221Q0803.pdf PDF
SPECIALPACKAGINGINSTRUCTION6480FJ.pdf PDF
ITEMDESCRIPTION1116FJ.pdf PDF
260FIRSTARTICLE1116FJ.pdf PDF
Show all 16

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity