Market Stats Related Contracts


Top Vendors

No Top Vendors Stats

Top Categories

No Top Categories Stats

Top Vehicles

No Top Vehicles Stats

Open Projects Related Projects


One Sec...
Solicitation
Due 6/23/17

"THIS IS A NON-WORK PLAN TASK ORDER FOR THE FOLLOWING MATOC CONTRACTORS ONLY" ONLY Proposals for this requirement are being solicited from the MATOC contractors for the following MATOC contracts issued by 411th Contracting Support Brigade (CSB). Proposals from offerors other than these MATOC contrac... read more

Jib Cranes at Suwon AB Last updated 1 week ago / Department of the Army
Solicitation
Due 6/7/17

Jib Cranes IAW specifications, delivery, installation and testing the units at Suwon ROK Airbase, Korea. Standard equipment warranty will apply. read more

Replace Gas door & seals, Bldg 940, Osan AFB (MATOC only) Last updated 1 week ago / Department of the Army
Solicitation
Due 6/1/17

"THIS IS A NON-WORK PLAN TASK ORDER FOR THE FOLLOWING MATOC CONTRACTORS ONLY" ONLY Proposals for this requirement are being solicited from the MATOC contractors for the following MATOC contracts issued by 411th Contracting Support Brigade (CSB). Proposals from offerors other than these MATOC contrac... read more

Medical Compress Gas Last updated 2 weeks ago / Department of the Army
Solicitation
Due 6/13/17

Medical Compress Gas Refill and Hydrostatic Test at Osan Air Base, Korea read more

SMYU17-1061 - CDC Construction and Repair Last updated 4 weeks ago / Department of the Army
Solicitation
Due 5/27/17

The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications. All work shall be completed IAW drawings and specifications. THIS IS A NON-WORK PLAN TASK ORDER... read more

Replace Warehouse Lighting in Bldg#824, Osan AB (MATOC ONLY) Last updated 1 month ago / Department of the Army
Solicitation
Due 5/26/17

Electrical Works Replace existing ceiling hanger lighting fixtures and pendant conduits on the high bay with LED lighting fixtures. Replace existing fluorescent lighting fixtures on the low level rack with new LED lighting. Replace existing fluorescent lighting fixtures on the high level rack with... read more