Work_Statement.docx
DOCX document 49 KB Posted
- Attached to
- 2023 USFO HERBICIDE APPLICATION Federal contract opportunity
- Solicitation number
- 140L2623Q0023
About this file
This work statement describes a federal contract opportunity for herbicide application services on multiple sites in Idaho. The contractor will be required to treat approximately 15,331 acres across five sites located in Jefferson, Butte, Blaine, Power, and Twin Falls counties. Services will include supplying herbicides, adjuvants, labor, equipment, and applying 2,4-D, picloram, imazapic, aminopyralid, and metsulfuron methyl herbicides at specified rates. The contractor must utilize a differentially corrected GPS system to navigate treatment areas and record application data. Work must be completed within allotted timeframes between March and June 2023. The contractor will be evaluated on uniform herbicide coverage and rate of application.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Horse_Butte_Herbicide_Treatment_Area_Map.pdf | ||
| Jefferson_Herbicide_Treatment_Area_Map.pdf | ||
| 2023_USFO_Herbicide_Treatment_Location_Map.pdf | ||
| Attachment_1_BLM_Approved_Herbicide.xls | XLS spreadsheet | |
| Bid_Schedule.docx | DOCX document | |
| Attachment_2_BLM_Approved_Adjuvant.xlsx | XLSX spreadsheet | |
| Big_Butte_Herbicide_Treatment_Area_Map.pdf | ||
| Wage_Determ.pdf | ||
| Sol_140L2623Q0023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
DETAILED SPECIFICATIONS
(HERBICIDE APPLICATION)
Item(s) # 0001A-E: Jefferson 2,4-D & Picloram Herbicide Application
1. Approximate Acreage: 586 acres
2. Location of Work Site as Shown on Work Location Map: The Jefferson project area is located in Jefferson County approximately 11 miles south of Terreton, Idaho (see Location Map). The treatment will be implemented within 23, 140-ft wide linear strips located on federal land administered by the Bureau of Land Management’s (BLM) Idaho Falls District (IFD), Upper Snake Field Office (USFO) (see Area Map). The topography of the project area consists of gently rolling lava plains with associated basalt bluffs and desert playas. Elevations range from 4,900 feet to over 5,200 feet above sea level.
3. Performance Times Allowed:
Base Line Item – 1 Day(s) of Actual Spraying Detailed Specifications for Herbicide Application
4. Requirements of Equipment to be supplied by the Contractor: Sufficient to meet specifications of the contract. Contractor will be required to treat only the 140-ft wide linear strips that traverse the 1,634-acre project area.
5. Loading Facilities: Use of any loading area, federal, state, or private land, shall be arranged by and at the discretion and risk of the contractor.
6. Work Crew Requirements: Work crew for handling, mixing, and applying herbicide shall be furnished by the Contractor.
7. Herbicides and Adjuvants to be furnished by the Contractor: The Contractor shall be responsible for purchasing, securing, and providing all herbicides and adjuvants for this contract, excluding the MSO. The herbicides and adjuvants to be used include 2,4-D LV6, Metsulfuron methyl, and Picloram. All herbicides and adjuvants shall be purchased in 1.0- or 2.5-gallon jugs, or in 250- or 330-gallon intermediate bulk containers (IBC). Government will pay the Contractor for herbicides and adjuvants once an invoice is provided to the Government.
8. Kind of Herbicides and Adjuvants Requested: (See Attachment No. 1 & 2 for BLM rangeland approved Herbicides & Adjuvants)
2,4-D LV6:
· 2,4-D LV6 by Alligare, LLC or
· 2,4-D LV6 by Albaugh, LLC or
· 2,4-D LV6 by Helena Agri-Enterprises, LLC or
· Base Camp LV6 by Wilbur-Ellis Co., LLC Metsulfuron methyl:
· Escort XP by Bayer Environmental Science or
· Escort XP by DuPont Crop Protection Picloram
· Picloram 22K by Alligare, LLC or
· OutPost 22K by Corteva Agriscience
· Tordon 22K by Dow Agroscience Adjuvant:
· Methylated Seed Oil (MSO)
9. Herbicides and Adjuvants to be Furnished by Government: 19 gal. of Methylated Seed Oil
10. Location of Herbicides and Adjuvants to be furnished by the Government: 1405 Hollipark Dr., Idaho Falls, ID 83401
11. Rate of Application:
· 1 quart of 2,4-D LV6 per acre
· 3/4 ounce of Metsulfuron methyl per acre
· 1 quart of Picloram per acre
· 1 quart of MSO per 100 gallons of water
· 3 gallons of water carrier per acre
· Drift control agent (per recommended volume)
12. Remarks and Other Requirements: The intent of the application is to reduce green rabbitbrush competition prior to the fall reseeding treatment. Every effort must be made by the applicator to ensure that the herbicide is applied to the target vegetation within the linear treatment strips. The timing of the treatment will need to be kept flexible to maximize the effects of the herbicide. The herbicide solution will need to be applied through properly maintained and calibrated equipment capable of delivering the desired volume per acre. The Contractor is responsible for the proper disposal of all mixed herbicide and for the clean-up of any/all spills. Should a spill occur, the Contractor will immediately notify the COR. The Contractor is responsible for applying herbicides in accordance with the Detailed Specifications in this contract, and the Herbicide Label. Controlling drift is the responsibility of the Applicator. BLM pesticide application records need to be filled out daily within 24 hours of application and submitted to USFO at completion of project. BLM pesticide application records will be provided by the Government at the Contractor/Contracting Officer meeting. The Contractor will be required to start work within three days after being notified by the Contracting Officer Representative (COR).
Item(s) # 0002A Big Butte Imazapic & Aminopyralid Application
1. Approximate Acreage: 2,820 acres
2. Location of Work Site as Shown on Work Location Map: The Big Butte project area is located in Butte County approximately 22 miles southeast of Arco, Idaho (see Location Map). The project will be implemented on 2,820 acres of federal land administered by the BLM’s IFD, USFO (see Area Map). The topography of the project area consists of steep, uneven slopes with deep draws. Elevations at the treatment site range from 5,120 to 7,560 feet above sea level at the top of Big Southern Butte.
**Site conditions at the treatment area may restrict the use of certain types of equipment. It is the responsibility of the contractor to determine the appropriate application mechanism.
3. Performance Times Allowed:
Base Line Item – 2 Day(s) of Actual Spraying
Item(s) # 0003A Horse Butte Imazapic & Aminopyralid Application
1. Approximate Acreage: 10,925 acres
2. Location of Work Site as Shown on Work Location Map: The Horse Butte project area is located in Blaine and Power Counties approximately 20 miles northwest of Aberdeen, Idaho (see Location Map). The project will be implemented on 9,660 acres of federal land administered by the BLM’s IFD, USFO, 625 acres of federal land administered by the BLM’s Twin Falls District (TFD), Shoshone Field Office (SFO), and 640 acres of Idaho Department of Lands (IDL) (see Area Map). The topography of the project area consists of gently rolling lava plains with associated basalt bluffs and desert playas. Elevations at the treatment site range from 4,800 to 5,100 feet above sea level.
3. Performance Times Allowed:
Base Line Item – 3 Day(s) of Actual Spraying
Item(s) # 0002B-D & 0003B-D: Detailed Specifications Common to the Big Butte & Horse Butte Imazapic & Aminopyralid Treatments
4. Requirements of Equipment to be supplied by the Contractor: Sufficient to meet specifications of the contract.
5. Loading Facilities: Use of any loading area, federal, state, or private land, shall be arranged by and at the discretion and risk of the contractor.
6. Work Crew Requirements: Work crew for handling, mixing, and applying herbicide shall be furnished by the Contractor.
7. Herbicides and Adjuvant to be furnished by the Contractor: The Contractor shall be responsible for purchasing, securing, and providing all herbicides and adjuvants for this contract, excluding the MSO. The herbicides and adjuvants to be used include Imazapic, and Aminopyralid. All herbicides and adjuvants shall be purchased in 1.0- or 2.5-gallon jugs, or in 250- or 330-gallon intermediate bulk containers (IBC). Government will pay the Contractor for herbicides and adjuvants once an invoice is provided to the Government.
8. Kind of Herbicides and Adjuvants Requested: (See Attachments No. 1 & 2 for BLM rangeland approved Herbicides & Adjuvants) Imazapic:
· Panoramic 2SL by Alligare, LLC or
· Plateau® by BASF or
· Imazapic 2SL by Nufarm Aminopyralid:
· Milestone® by Corteva Adjuvant:
· Methylated Seed Oil (MSO)
9. Herbicides and Adjuvants to be Furnished by Government: 104 gal. of Methylated Seed Oil
10. Location of Herbicides and Adjuvants to be furnished By the Government: 1405 Hollipark Dr., Idaho Falls, ID 83401
11. Rate of Application:
· 8 ounces of Imazapic per acre
· 5 ounces of Aminopyralid per acre
· 1 quart of MSO per 100 gallons of water
· 3 gallons of water carrier per acre
· Drift control agent (per recommended volume) Remarks and Other Requirements: The timing of the treatment will need to be kept flexible in order to maximize the effects of the herbicide. Apply the spray solution in properly maintained and calibrated equipment capable of delivering the desired volume. Controlling drift is the responsibility of the Applicator. The contractor will be required to start work within three days after being notified by the Contracting Officer Representative (COR).
1.0 GENERAL
1.1 The purpose of this contract is to secure services for herbicide application. There are ten (10) line items for this contract. Three (3) for herbicide application and seven (7) for herbicides to be supplied. The line items identified as herbicides will be supplied by the Contractor. If not all the herbicide is applied, the unused herbicide will become the property of the Government. The Contractor shall furnish all herbicides (see Detailed Specifications item #5, Kind of Herbicide and Adjuvant Requested), labor, equipment, tools, materials, supervision, supplies, and incidentals; and perform all work necessary to complete applications, in accordance with these specifications, the Detailed Specifications in this contract, and the Herbicide Label(s).
1.2 The Contractor’s applicators shall hold a current Idaho Professional Applicator License in the Agricultural Pesticide Category. The Government will inspect each applicator for their current Idaho Professional Applicator’s License in the Agricultural Pesticide Category before work on this contract.
1.3 Contractor should plan accordingly for labor, equipment, tools, materials, supervision, supplies, and incidentals; and perform all work necessary to complete application.
1.4 The Contractor shall stop operation if inclement weather conditions (wind or rain) occur during the spraying operation. (See section 5.0 Execution of Work)
1.5 Applicator Logs
1.5.1 The Contractor shall maintain a daily written log or 'Daily Herbicide Application Record', which will be provided by the Government.
1.5.2 This log or record shall be signed by applicator and turned into the Project Inspector (PI).
1.6 The Government will pay for treatment spraying by the acre upon submission of proper invoices, after acreage is determined to have been sprayed by using the computer-generated shapefile from a GPS Differential Guidance System, and a flow control report is given to the Government for verification of the correct carrier rate was applied.
1.7 The Contractor shall conduct herbicide spraying procedures safely and in accordance with the Label restrictions of the herbicide and the herbicide application restrictions of the State of Idaho. (See Section 7.0 - Safety).
1.8 The Contractor shall follow Environmental Protection Agency (EPA) guidelines for application of herbicides (if applicable).
1.9 The Contractor shall strictly adhere to the herbicide label instructions.
1.10 The Government will have the option to inspect the Contractor's equipment and work before, during, and after completion of this contract.
2.0 LOCATIONS
2.1 The Government will provide work location map(s) for all sites that are to be treated.
2.2 Work sites will NOT be marked by the Government with flagging.
2.3 The Government will provide GPS perimeter data of the boundaries of all sites that are to be treated.
3.0 HERBICIDES
3.1 The Contractor will supply all herbicide necessary to complete the specifications of this contract. Contractor is responsible for disposal of mixed herbicide.
3.2 The contractor shall adhere to the application rate the Government has determined for each site. The rate will be within the product label rate.
3.3 Adjuvants
3.3.1 Methylated Seed Oil surfactant will be used at manufacturer’s recommended rates. The surfactant will be supplied by the Government. Contractor is responsible for disposal of mixed surfactant.
3.3.2 Drift agents WILL be used for all liquid aerial applications. If a drift control additive is used, read and carefully observe the cautionary statements and all other information appearing on the additive label. The Contractor shall provide the drift agent. Controlling drift is the responsibility of the Contractor.
3.3.3 If the Government desires that dye be used for marking sprayed areas, it will be provided by the Government.
3.3.4 All drift agents, surfactants and dyes shall be handled as chemicals. (See Section 7.0 - Safety).
3.3.5 No additional payment will be made to the Contractor for the use of Contractor furnished drift agents or Government-Furnished surfactant and dyes. These expenses shall be included in the unit price bid per acre for herbicide spraying.
4.0 EQUIPMENT
4.1 General: The Contractor shall treat designated areas in conformance with these specifications and the Detailed Specifications. Unless otherwise specified, the Contractor shall furnish all equipment, herbicide, labor, supplies, and materials required to complete the job. The Contractor shall furnish properly equipped personnel experienced in identifying noxious weed species and herbicide mixing and application. The Contractor shall service and repair his/her equipment as necessary to maintain satisfactory progress on work. Contractor is responsible for all costs incidental to equipment move-in and move-out associated with the project.
4.2 Equipment:
4.2.1 The Contractor shall furnish sufficient equipment to satisfactorily spray the designated areas in the time specified as required in the Detailed Specifications. Equipment shall be capable of traveling at moderate speed to give proper control and distribution of herbicide. Equipment shall have communications with the Government by using radio frequencies designated by either the Contractor or COR/PI. Contract will not commence until radio communication is established.
4.2.2 Base of Operations: The Contractor shall provide such loading facilities as may be required for competent performance of contract. If loading sites are described in the Detailed Specifications or shown on the Work Location Map, the Government makes no warranty as to their availability or condition. Use of any loading area shall be arranged by and at the discretion and risk of the Contractor, and the Government shall not be held responsible for any loss, mishap, or accident due to conditions of any loading facility used. Any applicable fees for loading facilities are the responsibility of the Contractor. If Contractor wishes to use BLM land, this must be approved in advance by the COR/PI. The Contractor shall provide appropriate warning signs for traffic if roads are used as loading sites.
4.2.3 Dust Abatement: Any material used for dust abatement, other than water, shall be approved by the COR prior to use.
4.2.4 Flight Hazards: If Contractor aircraft(s) are utilized, hazards such as the presence of power lines or anemometer towers on the work site are the responsibility of the Contractor to identify. All appropriate precautions shall be taken by the Contractor. Flight hazards which have been identified by the Government in the Detailed Specifications or Work Location Maps may not be the only hazards present at the work sites and it is the Contractor's responsibility to check all work sites for flight or other hazards.
4.3 Spray Equipment:
4.3.1 Spray Tanks: Spray solutions of the product shall be mixed, stored, and applied using only stainless steel, aluminum, fiberglass, plastic, or plastic-lined steel containers.
4.3.2 Spray Nozzles: Contractor shall furnish a nozzle type that is designated for the intended application. Refer to the Label for proper nozzles to comply with Drift Management Section.
4.3.3 Booms: Contractor shall furnish non-rust booms. The distance of the outermost nozzles on the boom must not exceed 3/4 the length of the wingspan or rotor if aircraft is utilized.
4.4 Work Crew:
4.4.1 Applicators: Shall be furnished by the Contractor and shall meet certification requirements of Idaho Regulations for this type of work. Applicators must hold a current Commercial Agricultural Operating certificate.
4.4.2 Work Crew: Shall be furnished by the Contractor for treating noxious weeds and loading/unloading of equipment. The Contractor shall furnish the necessary qualified mechanics for maintenance of equipment and shall furnish all fuel, oil, and service required for operation of equipment and vehicles. All expenses relating to maintenance and operation of equipment shall be included in the unit price bid per acre for herbicide spraying.
4.5 Project Layout
4.5.1 Requirement: Contractor shall be required to utilize a Differentially Corrected Global Positioning System (DGPS) for electronic Navigation. System must be capable of utilizing ArcMap or ARC-INFO shapefiles created by the government and given to the Contractor on a USB Thumb Drive or by email.
4.5.2 Ground flaggers and an auto-flagger system (if aircraft is utilized) can supplement the DGPS system, but not substitute for it.
4.6 Differentially Corrected Global Positioning System
4.6.1 Tracking/Guidance: DGPS is required for tracking, and data collection. The Contractor shall provide all guidance equipment, materials, computers, printers, personnel, and services required for the system to be used. The system shall be sufficiently sensitive to provide immediate deviation indications (real-time).
The DGPS system must be capable of determining a differentially corrected location with an error of no more than one to two meters in the horizontal plane. The guidance system shall be capable of updating current position at a rate of a minimum of one time per second. Differential correction must cover the complete operational area. During operation, differentially corrected signal must be accurately recorded at least 90% of the operational time. Differential correction may be, provided by a portable differential station, FM radio fixed towers, or satellite.
Software provided with DGPS must be designed for parallel offset in increments equal to the assigned swath width of the application equipment.
4.7 Equipment Requirements:
4.7.1 Software: Software provided with DGPS must be designed for parallel offset in increments equal to the assigned swath width of the application equipment.
4.7.2 Project Log: Must be capable of a minimum rate of one-second logging intervals. Full record includes position, time altitude, speed, track, application system on/off, job name/number, and differential correction status. The computer program must be capable of calculating and show total acres treated during the flight, and capable of downloading to a computer for analysis and review. The project log must show and differentiate between spray-on and spray-off when viewed on a computer monitor or printer. Export files of each project log shall be provided on a USB Thumb Drive and must be compatible with Esri’s ArcMap program. The Contractor shall provide software that is compatible and will enable the project log files to be converted into an ArcMap readable format.
| The contractor must, upon request by the COR or PI, be able to supply project log data on a USB Thumb Drive for review at any time during the contract. The Contract will not be considered complete until the data has been reviewed and deemed complete with no skips in the treated areas. The Contractor shall provide a map with project log data at the end of each day’s application. |
| The DGPS system must be capable of zooming in on any portion of the treatment to view a specific area with greater detail. |
4.7.3 Hardware:
i Visual Display Monitor and Control Keypad: (1) Capable of displaying swath width over project path: (2) mounted in a location that will allow the applicator to view the screen; (3) have a method to display nested polygons to indicate sensitive or no-spray areas within or adjacent to treatment blocks: (4) have a feature that allows the applicator to return to the exact location of application shutdown and complete application without omitted or doubled treated areas: (5) be able to input reference waypoints (A-B line): (6) have a feature which alerts applicator when they are about to enter or exit a specific treatment block or an exclusion area within a block.
ii Course Deviation Indicator (CDI): The course deviation indicator or course deviation light must have the capability to display both cross-track error and intercept angle to desired heading. Cross-track error shall be adjustable down to one (1) foot.
iii Memory: Must be capable of storing up to eight (8) hours of continuous project log data.
5.0 EXECUTION OF WORK
5.1 Pre-Work Conference: Prior to commencement of work, a meeting may be requested by the Contracting Officer (CO) to be attended by the Contractor, the COR, and PI. The meeting will be held at the Upper Snake Field Office or agreed upon location near the project at a time mutually agreeable to the Contractor and the CO to discuss the work schedule and to familiarize both parties with the responsibilities of each under this contract. At this time a work schedule showing dates, locations, equipment, and employees working on this project shall be provided by the Contractor to the CO.
5.2 Priority of Work: Will be determined prior to application start.
5.3 Progress Reports: Contractor will provide daily progress summaries, during application, to the BLM Representative (COR/PI). Regular communication between BLM Representatives and the Contractor is required to help alleviate any problems or potential delays.
5.4 Environmental Conditions
5.4.1 Work Period: Spraying operations will be permitted only during daylight hours. The Contractor will have personnel on project site prior to commencing daily application, during application, and will notify COR/PI of changing weather conditions. The COR or PI will allow Contractor to continue or stop application if weather factors dictate. The COR or PI will give the permission to start, approximately one (1) hour from notification of conditions, depending on location of project from the USFO. The Contractor will be allowed to work six days per week including Saturdays. Work will not be permitted on Sundays and holidays, unless authorized by the COR.
5.4.2 Wind: The Contractor shall follow the Label Section on Spray Drift Management - Wind. Local wind can influence wind patterns. Every applicator should be familiar with local wind patterns and how they affect drift.
5.4.3 Relative Humidity: Refer to the product label when making applications in low relative humidity conditions. Measurements can be obtained from local National Weather Service.
5.4.4 Site Conditions: No treatment spraying will be allowed if conditions do not meet the label requirements.
5.5 Herbicide Application
5.5.1 Coverage: The entire surface within the designated boundaries of the project area shall receive uniform coverage with the specified herbicide except for areas excluded by the Government. Areas excluded from the spraying operation within the designated boundaries, will not be included in the acreage computed for payment. Any areas not properly treated by the Contractor shall be either retreated or compensated by suitable contract adjustment, at the option of and at no additional cost to the Government. (See section 5.6 Field Quality Control and Section 5.9 Completion of Contract)
5.5.2 Rate of Spraying: Herbicide shall be applied at the application rate per acre according to the work data sheet. For liquid applications, the carrier (water) for the chemical will follow the label limits for ground or aerial application. The carrier (water) must be clean, free of dirt particles. Ditch water will not be considered clean. Contractor will be required to demonstrate that they can provide adequate and uniform coverage at the appropriate application rate. Contractor shall furnish mixing equipment, suitable work crew, and perform mixing operation. Application formulation shall be applied thoroughly according to the Label and distributed over entire plant or infested area. Distribution of herbicide shall not vary more than ten percent (10%) above or below the average distribution of herbicide per acre from that specified.
5.5.3 Application Paths: Shall be patterned to secure a uniform distribution of herbicide. Contractor must ensure that there will be straight and regular paths of application. The Contractor must keep applications within the perimeter of the Government provided shape file. Irregular paths or areas sprayed outside of the perimeter will result in immediate stoppage of work. Corrective action shall be taken immediately by the Contractor to insure evenly spaced, straight, and regular application paths and complete coverage of areas included in the spraying job. Avoid overlapping, and no stripping shall be allowed.
5.5.4 Swath Width: Effective swath width shall not exceed the maximum for adequate coverage of supplied application equipment.
5.5.5 Application Height: Herbicide dispenser shall be set at a height to obtain proper distribution and uniform coverage of herbicide on target species. Contractor shall follow Herbicide Label instructions on Spray Drift Management to obtain proper boom height.
5.5.6 Spray Drift Management: The interaction of many equipment and weather-related factors determines the potential for spray drift. The Contractor is responsible for considering all these factors when making application decisions. Avoiding herbicide application drift is the responsibility of the Contractor.
5.6 Sprayer Clean-up: Shall be conducted according to the label instructions. Avoiding contamination of the work site is the responsibility of the Contractor.
5.7 Field Quality Control:
5.7.1 Tests for Uniformity: The Government representative (COR/PI) will utilize field data to determine uniformity of herbicide application. Randomly spaced water sensitive cards or collection trays will be utilized.
5.7.2 Tests for Rate of Application: Rate of application will be determined from test applications and strip tests made prior to commencement and/or during application operations to establish and maintain the desired application setting of the distribution mechanism. Should the Contractor wish to object in any way to the weight recording and/or ground recovery sampling done at any particular time by the Government, the Contractor shall be present in person or by authorized representative to voice said objections when weight recording and/or ground recovery samplings are done, and to agree upon new records and/or samples at the time, where after the weight recording and ground recovery sampling done by the Government shall be final and binding in the settlement of the contract.
5.8 Work stoppages: The Contractor agrees to work diligently to complete the application of the herbicide. The Government reserves the right to stop spraying operations at any time when conditions are considered sufficiently unfavorable to warrant stoppage. Stoppage shall continue until spraying operations are again authorized by the Government. Because of the nature of the work, any time for which work is suspended by the Government because of unsuitable spraying conditions will not be counted against the contract completion time. However, no monetary compensation will be given to the Contractor by reason of such work suspension.
5.9 Termination for convenience of the Government: Because of the nature of the work, the Contracting Officer may, by written notice to the Contractor, terminate this contract, in whole or in part, when it is in the best interest of the Government. To the extent that this contract is so terminated, the Government shall be liable only for payment in accordance with the payment provisions of this contract for work satisfactorily completed prior to the effective date of termination.
5.10 Completion of contract: The Contract will be considered completed and payment due when all areas furnished to the Contractor by the Government have been sprayed to the standards specified above. Tests for uniformity will be made at the time of spraying, and final completion of the contract will be determined by these tests.
5.11 Risk and Damages: The Contractor shall assume all risks in connection with performance of the contract and shall be liable for and save Government harmless on account of any damages to persons or property in connection with the prosecution of the work, including the applicator or other employees of the Contractor.
6.0 MEASUREMENT AND PAYMENT
6.1 Method of Measurement
6.1.1 Units: Application of herbicide solution will be measured and paid for by the number of acres sprayed to the nearest whole acre.
6.1.2 Measurement: Measurement for payment for spraying will be the actual area, in acres, within the designated boundaries satisfactorily sprayed in conformance with these specifications. Measurement will be made from either physical surveys of the areas or a computer-generated shapefile created in a GPS Differential Guidance System at the option of Government. The shape file will be used in ArcView for final acreage measurement. Acreages will be computed from horizontal distances as shown on maps at the option of Government.
6.1.3 Remeasurement: Remeasurement of the acreage under this contract will be made upon the written request of the Contractor. The request for remeasurement must be made in writing within 10 calendar days after completion of the work. If remeasurement indicates a difference of not more than 5% from the original measurement, the Contractor shall pay the actual cost of the remeasurement. Payments will be based on the second measurement where the difference between measurements is more than 5%. Where the difference is less than 5%, the results of the first measurement will be used.
6.2 Basis of Payment:
6.2.1 Payment: Payment will be made at the unit price per treated acre specified in the Bid Schedule which is made a part hereof and shall include the cost of all work described in this paragraph and the Detailed Specifications, including any respraying, if such work is required.
7.0 SAFETY
7.1 Transportation of herbicides: The Contractor shall be responsible for the transport of herbicides used to fulfill the specifications of this contract. The Contractor shall secure herbicide containers in mixing area to prevent spillage. Contractor shall be responsible for the herbicide’s protection from loss or damage due to weather, rodents, insects, theft, or any other hazard. Any herbicide damaged or lost while in the custody of the Contractor will be replaced by the Contractor at the Contractors expense.
7.2 Protective Clothing and Equipment for Contract Employees Exposed to Herbicides: The Contractor shall supply protective clothing and equipment to contract workers that guarantee minimal exposure throughout the herbicide application process. The Contractor shall follow all advice on protective clothing and equipment which appears on the herbicide label and/or MSDS documentation. The Contractor shall make available clean-up facilities to contract employees exposed to herbicides or herbicide-contaminated equipment.
7.3 Storage of herbicides: Contractor is required to have locked storage for herbicide and keep herbicide locked-up while unattended.
7.4 Mixing and application of herbicides:
7.4.1 The Contractor shall mix herbicides in accordance with the proportions listed on the product labels. The Contractor shall provide adequate protective clothing and equipment for contract employees who mix the herbicides.
7.4.2 By law, the application of an herbicide, either directly or through drift, must not expose workers or other people. The Contractor shall be very aware and cautious of any environmental hazard present during herbicide application. Upon completion of herbicide application, the Contractor shall thoroughly clean equipment and dispose of waters, residues, rinses, and unused herbicides only according to EPA and Idaho State regulations. All empty herbicide containers will be tripled rinsed, labels removed, and punctured by the Contractor after mixing. The Contractor shall be responsible for disposal of the empty boxes, labels, and lids. The Contractor will be responsible for disposal and recycling of the empty containers.
7.5 Spills and accidents: The Contractor shall be responsible if accidents and chemical spills occur. The Contractor shall report immediately spills and accidents to the BLM authorized officers and appropriate local authorities. The Contractor shall provide immediate treatment of contaminated or injured persons and seek professional medical attention when necessary. The Contractor shall control chemical spills quickly and shall secure additional help when the Contractor cannot effectively or safely handle the spill clean-up. Spills will be the responsibility of the Contractor and shall be cleaned up to the satisfaction of the local authorities.
GLOSSARY
ACTIVE INGREDIENT: The chemicals in an herbicide which control the targeted brush species.
ADJUVANT: An inert material added to an herbicide formulation or tank mix to increase the effectiveness of the active ingredient.
DRIFT: The movement of airborne particles by air motion or wind away from the intended target area.
EMERGENCE: The act of a germinating seedling breaking through the soil surface.
ENDANGERED SPECIES: Plant or animal species that are in danger of extinction through all or a significant part of their range.
LABEL: All written, printed, or graphic matter on or attached to pesticide containers as required by law.
RATE: The amount of active ingredient or acid equivalent applied per unit area or other treatment unit.
THREATENED SPECIES: Plant or animal species that are not in danger of extinction but are likely to be classified as Endangered within the foreseeable future.
SENSITIVE SPECIES: Plant or animal species (as designated by the Idaho BLM State Director) that are managed by the BLM to ensure that agency actions do not contribute to the need to list any species as Threatened or Endangered in the future.