WI_0303_A_Generator Bearing Inspection.doc_.doc

DOC document 66 KB Posted

Attached to
Notice of Intent to Sole Source Federal contract opportunity
Solicitation number
N4044323Q0060
Issued by
Department of the Navy Military Sealift Command

About this file

This document outlines a federal contract opportunity for generator bearing inspections on a naval vessel. The contract calls for inspection of the drive end and non-drive end bearings on two ship service diesel generators by October 2023. A manufacturer's technical representative will supervise opening, cleaning, and inspecting the bearing assemblies. The representative will check in with the chief engineer upon arriving and departing the vessel. The contractor must submit condition reports and inspection results, and perform an operational test witnessed by the chief engineer. The opportunity is issued by the Department of the Navy Military Sealift Command under solicitation number N4044323Q0060.

View the file

Other files for this federal contract opportunity

Other files attached to Notice of Intent to Sole Source, newest first.
File Type Posted
N4044323Q0060_SSJ__Redacted.pdf PDF
Clauses and Provisions.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS HARVEY MILK

( TAO 206 )

ELECTRICAL
CONTRACT NO. N32205XXXXXXX
ITEM NO. 0303
CATEGORY "A"
2023-08-10
GENERATOR BEARING INSPECTION
Kelly, Moira

1.0 ABSTRACT:

1.1 This item describes the bearing inspections on the Ship Service Diesel (SSDG) Generators.

2.0 REFERENCE/ENCLOSURES:

2.1 References

2.1.1 NAVSEA Tech Manual T9311-CL-MMC-090_0_0, Generator, Ship Service Diesel, Chapter “Alternator”

2.2 Enclosure

2.2.1 None

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity

3.1.1 General Dynamics NASSCO; San Diego, CA

3.1.2 3rd Deck, Engine Room /Two (2) SSDG Generators

3.2 Period of Performance:

3.2.1 18 – 31 August 2023

3.3 Description

3.3.1 SSDG Engine

Unit

Qty SSDG (Generator) (2)

Manufacturer
Bergen
Model
B32:40L8A
Type
Diesel
Speed (max)
720 rpm

3.3.2 SSDG Generator

Unit

Qty SSDG (Generator) (2)

Manufacturer
Stamford AvK
Model
AVK DIG 156 p/10 W
Type
Synchronous
Rated Power
4656 kVA
V, Freq., Ph
6600 V, 60 Hertz, 3 phase
Speed (max)
720 rpm
Power Factor
0.8 lagging
Insulation
Class ‘F’

3.3.3 SSDG Generator Bearings

Unit

Qty SSDG (Generator) (2) SSDG (Generator) (2)

Manufacturer
Zollern
Zollern
Location
Drive End
Non Drive End
Model
ZFNLK 28-250
ZFNLQ 22-225
Type
Sleeve
Sleeve

4.0 GOVERNMENT FURNISHED MATERIAL:

4.1 None

5.0 NOTES:

5.1 The contractor and subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and subcontractor regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 24, 28, and 29.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract, including but not limited to Work items 009, 010,015, 020, and 021 to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide the services of an OEM Bergen/Stamford AvK/Zollern Bearing Technical Service Representative to supervise the opening, cleaning, and inspection of the generator bearing assemblies. Refer to paragraph 7.8.2 on source.

7.2 Isolate and tag out systems with Ship’s Force assistance.

7.3 Rigging and interference removal may be required for this inspection.

7.4 Open, clean, and inspect the SSDG Generator drive end (DE) and non-drive (NDE) end bearing assemblies, condition and clearances. (4 total bearing assemblies).

7.5 After inspection by the Manufacturer’s Technical Representative and the Chief Engineer. Submit an “As Found” Condition Report to the MSCREP.

7.6 Fill all housings with clean lube oil. (ships force supplied GFM)

7.7 Perform operational test, 8 hours maximum, Chief Engineer or MSCREP to witness.

7.8 Submit final technical report of inspections and test completed along with future recommendations if any.

7.9 Manufactures Representative:

7.9.1 Manufactures representative shall check in with the Chief Engineer upon arrival and final departure of the vessel

8.0 GENERAL REQUIREMENTS:

8.1 None additional.

0303 - 1