SOW.docx

DOCX document 27 KB Posted

Attached to
Floor Buffers Federal contract opportunity
Solicitation number
w91yh4Th0027
Issued by
Department of the Army

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

3rd Battalion, 160th Special Operations Aviation Regiment (Airborne) Rider Floor Scrubber Compact

21 April 2017

Prepared by 1SG Steven J. Reid C Company First Sergeant 3rd Battalion, 160th Special Operations Aviation Regiment (Airborne) 1304 North Lightning Rd Hunter AAF, GA 31409

1. SCOPE

C Company, 3rd Battalion, 160th SOAR (Abn) is looking to fill the requirements of a hanger floor cleaner. The riding floor cleaner must be designed to expeditiously scrub and squeegee 49,000 square feet of hanger. It must be a minimum of battery operated, vacuum capability, with a solution tank with a 29 gallon capacity. It must be a riding floor scrubber due to the large amount of hanger space that needs to be cleaned routinely.

0. DIMENSIONS

1. 60” length x 28” wide x 50” height.

1. Weight 897 lbs.

1. 1.1.2 Standard Features

1. 1,500 RPM Scrub speed

1. 0.75 hp scrub motor

1. 0.6 hp Vacuum motor

1. 4 MPH max speed

1. 29 gallon recovery tank

1. 29 gallon solution tank

1. 28” squeegee width

1. 6V, 235Ah Battery operated

1. 69 dBA

1.1.3 Features

1. Capable of cleaning 49,280 square feet.

REQUIREMENTS

0. Core The vendor must have the equipment in stock and be able to deliver equipment in an appropriate amount of time.

PERIOD OF PERFORMANCE

The delivery of equipment needs to be within the appropriate amount of days.

Place of Performance Not Applicable.

Contractor Personnel Contracted personnel will perform the necessary operations and maintenance activities in order to meet the prescribed requirements within the SOW.

Administrative Considerations Contractor-Furnished Items and Services- Except for those items or services specifically stated as Government furnished, the contractor shall furnish everything needed to perform this contract according to all its terms.

Environmental and Hazardous Materials Handling The contractor shall perform the requirements of this SOW in an environmentally acceptable manner consistent with Army, federal, state, and local environmental laws and regulations.

The contractor shall follow established policies and procedures that minimize the risk of environmental pollution.

The contractor shall follow Army, MACOM and restricted area regulations/instructions and local plans and procedures concerning the handling of potentially hazardous/toxic materials.

The contractor shall cooperate with airfield officials in conducting inspections, resolving incidents, and take corrective action to prevent recurrence, where the release of hazardous/toxic materials occurs within the contractor’s area of responsibility as defined in this Statement of Work.

The contractor shall follow established programs to safely and properly use, manage, store, control, and dispose of combustible, flammable, and hazardous materials.

Revision: Revisions to the plan to assure contractor compliance to the requirements of the SOW and contract/task may be required at any time during performance of the contract. The contractor shall make appropriate revisions and obtain acceptance of the revised plan from the PCO.

File details come from the government source that posted it.