Statement_of_Work.docx

DOCX document 29 KB Posted

Attached to
C4I NTOC Equipment Federal contract opportunity
Solicitation number
w91YH4th0021
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to C4I NTOC Equipment, newest first.
File Type Posted
JOFOC.pdf PDF
JOFOC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

3rd Battalion, 160th Special Operations Aviation Regiment (Airborne) Nano TOC Equipment (First SOW)

30 August 2016

Prepared by SFC Jason Reichart Battalion Assistant S-3 NCOIC 3rd Battalion, 160th Special Operations Aviation Regiment (Airborne) 1304 North Lightening Rd Hunter AAF, GA 31409

OPERATIONAL EQUIPMENT FOR 3D BATTALION 160TH S-3 SECTION

SCOPE

3rd Battalion, 160th Special Operations Aviation Regiment (Airborne) requires vendor to provide operational equipment for the 160th SOAR(A) in order to field a highly mobile and effective TOC environment to include tactical screen sets, projectors, and cases. Systems will reduce the overall space and weight requirements for the TOC to be deployed, enabling a more rapid and deployable capability. Additionally the PTOC L20.14.2 will be specifically used to facilitate efficient and accurate Pre-Deployment Site Survey’s (PDSS) in support of global operations.

EQUIPMENT REQUIRED

1.1.1 nRTOC-FR60:

The 3rd Battalion, 160th SOAR(A) S-3 Section requires two (2) nano Rapid Tactical Operations Center (nRTOC) – Rapid setup/strike, single display projection system consisting of a lightweight, aluminum frameset, 60 in. diagonal screen and one 1024x768 (XGA) DLP projector. System features both front and rear, below screen projection. System includes one 25 ft. VGA cable. All components pack inside the smallest, rugged, aluminum case available.

1.1.2 PTOC L20.14.2:

The 3rd Battalion, 160th SOAR(A) S-3 Section requires four (4) PTOC L20.14.2. A soft-sided travel case containing portable C2 systems. Case features wheels and telescoping handle. System includes six locator beacons, wrist wearable GPS tracker, Nikon Forestry ProLaser Rangefinder, laser pointer, logitech pro webcam C920, 3.5MM 5'cable, portable speaker and pico projector with tri-pod and fast fold mini screen. Foam insert supporting electronics for transit protection laser cut.

1.1.3 mRTOC2600:

The 3rd Battalion, 160th SOAR(A) S-3 Section requires two (2) Mini Rapid Tactical Operation Center with two projectors and one screen packed into one transit case.

REQUIREMENTS

0. Core The vendor must have the equipment in stock and be able to deliver equipment in an appropriate amount of time.

PERIOD OF PERFORMANCE

The delivery of equipment needs to be within the appropriate amount of days.

Place of Performance Not Applicable.

Contractor Personnel Contracted personnel will perform the necessary operations and maintenance activities in order to meet the prescribed requirements within the SOW.

Administrative Considerations Contractor-Furnished Items and Services- Except for those items or services specifically stated as Government furnished, the contractor shall furnish everything needed to perform this contract according to all its terms.

Environmental and Hazardous Materials Handling The contractor shall perform the requirements of this SOW in an environmentally acceptable manner consistent with Army, federal, state, and local environmental laws and regulations.

The contractor shall follow established policies and procedures that minimize the risk of environmental pollution.

The contractor shall follow Army, MACOM and restricted area regulations/instructions and local plans and procedures concerning the handling of potentially hazardous/toxic materials.

The contractor shall cooperate with airfield officials in conducting inspections, resolving incidents, and take corrective action to prevent recurrence, where the release of hazardous/toxic materials occurs within the contractor’s area of responsibility as defined in this Statement of Work.

The contractor shall follow established programs to safely and properly use, manage, store, control, and dispose of combustible, flammable, and hazardous materials.

Revision: Revisions to the plan to assure contractor compliance to the requirements of the SOW and contract/task may be required at any time during performance of the contract. The contractor shall make appropriate revisions and obtain acceptance of the revised plan from the PCO.