A07.23_W913E5-16-R-0005.pdf

PDF 1 MB Posted

Attached to
Safety and Fire Alarm Services Federal contract opportunity
Solicitation number
W913E5-16-C-0005
Issued by
Department of the Army Corps of Engineers Engineer Research and Development Center

About this file

RFP

View the file

Other files for this federal contract opportunity

Other files attached to Safety and Fire Alarm Services, newest first.
File Type Posted
A02.01_Attachment_1_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W913E5-16-R-0005 01-Aug-2016

b. TELEPHONE NUMBER

603-646-4119

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 22 Aug 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W913E59. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

WILLIAM A MCFARLAND

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81EWF61103985

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ERDC CONTRACTING OFFICE

HANOVER OFFICE

72 LYME ROAD

HANOVER NH 03755-1290

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W14GQK 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

PR W2R2 COLD RGNS RSCH ENG LAB

DEPARTMENT OF PUBLIC WORKS

SUPPLY SECTION

72 LYME ROAD

HANOVER NH 03755-1290

TEL: 603-646-4175 FAX:

(603) 646-4486FAX:

TEL: (603) 646-4280

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$20,500,000

NAICS:

561621

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF83

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 4 Each Annual Requirements - BY

FFP

Contractor shall perform annual requirements IAW Section C, PWS. Annual requirements includes the following services: fire alarm annual inspections, cold room panic alarm inspections, smoke detector cleaning, and supervisory alarm tests.

FOB: Destination

MILSTRIP: W81EWF61103985

PURCHASE REQUEST NUMBER: W81EWF61103985

NET AMT

0002 2 Each Semi-Annual Gate Inspections - BY

FFP

Contractor shall perform gate inspections semi-annually IAW Section C, PWS.

FOB: Destination

0003 12 Each Monthly Fire Panel Check - BY

FFP

Contractor shall perform monthly fire panel checks IAW Section C, PWS.

0004 4 Each HFD Panel Signal Tests - BY

FFP

Contractor shall perform Hanover Fire Deparment Panel Signal tests IAW Section

C, PWS.

0005 420 Hours Routine Service Calls - BY

FFP

Contractor shall perform routine service calls IAW Section C, PWS.

0006 10 Hours Emergency Service Calls - BY

FFP

Contractor shall perform emergency service calls IAW Section C, PWS.

0007 400 Hours Unplanned Work Labor - BY

FFP

Contractor shall perform unplanned work IAW Section C, PWS.

0008 16,000 Dollars, U.S.

Material - BY

FFP

Contractor shall provide material (repair/replacement parts) at the prices delineated in Section B, List of Materials. Material costs are estimated not to exceed $16,000 per year

0009 10,000 Dollars, Unplanned Material - BY

Contractor shall provide unplanned materiial IAW Section G, Contract

Administration Info and Section C, PWS. Unplanned Material costs are estimated not to exceed $10,000 per year

0010 1 Each ITM Program

FFP

Contractor shall provide an ITM program IAW Section C, PWS.

0011 1 Each Quality Control Program

FFP

Contractor shall provide a Quality Control Program IAW Section C, PWS.

1001 4 Each OPTION Annual Requirements - OY1

FFP

Contractor shall perform annual requirements IAW Section C, PWS. Annual requirements includes the following services: fire alarm annual inspections, cold room panic alarm inspections, smoke detector cleaning, and supervisory alarm tests.

1002 2 Each OPTION Semi-Annual Gate Inspections - OY1

FFP

Contractor shall perform gate inspections semi-annually IAW Section C, PWS.

1003 12 Each OPTION Monthly Fire Panel Check - OY1

FFP

Contractor shall perform monthly fire panel checks IAW Section C, PWS.

1004 4 Each OPTION HFD Panel Signal Test - OY1

FFP

Contractor shall perform Hanover Fire Deparment Panel Signal tests IAW Section

C, PWS.

1005 420 Hours OPTION Routine Service Calls - OY1

FFP

Contractor shall perform routine service calls IAW Section C, PWS.

1006 10 Hours OPTION Emergency Service Calls - OY1

FFP

Contractor shall perform emergency service calls IAW Section C, PWS.

1007 400 Hours OPTION Unplanned Work Labor - OY1

FFP

Contractor shall perform unplanned work IAW Section C, PWS.

1008 16,000 Dollars, OPTION Material - OY1

Contractor shall provide material (repair/replacement parts) at the prices delineated in Section B, List of Materials. Material costs are estimated not to exceed $16,000 per year

1009 10,000 Dollars, OPTION Unplanned Material - OY1

Contractor shall provide unplanned materiial IAW Section G, Contract

Administration Info and Section C, PWS. Unplanned Material costs are estimated not to exceed $10,000 per year

2001 4 Each OPTION Annual Requirements - OY2

FFP

Contractor shall perform annual requirements IAW Section C, PWS. Annual requirements includes the following services: fire alarm annual inspections, cold room panic alarm inspections, smoke detector cleaning, and supervisory alarm tests.

2002 2 Each OPTION Semi-Annual Gate Inspections - OY2

FFP

Contractor shall perform gate inspections semi-annually IAW Section C, PWS.

2003 12 Each OPTION Monthly Fire Panel Check - OY2

FFP

Contractor shall perform monthly fire panel checks IAW Section C, PWS.

2004 4 Each OPTION HFD Panel Signal Test - OY2

FFP

Contractor shall perform Hanover Fire Deparment Panel Signal tests IAW Section

C, PWS.

2005 420 Hours OPTION Routine Service Calls - OY2

FFP

Contractor shall perform routine service calls IAW Section C, PWS.

2006 10 Hours OPTION Emergency Service Calls - OY2

FFP

Contractor shall perform emergency service calls IAW Section C, PWS.

2007 400 Hours OPTION Unplanned Work Labor - OY2

FFP

Contractor shall perform unplanned work IAW Section C, PWS.

2008 16,000 Dollars, OPTION Material - OY2

Contractor shall provide material (repair/replacement parts) at the prices delineated in Section B, List of Materials. Material costs are estimated not to exceed $16,000 per year

2009 10,000 Dollars, OPTION Unplanned Material - OY2

Contractor shall provide unplanned materiial IAW Section G, Contract

Administration Info and Section C, PWS. Unplanned Material costs are estimated not to exceed $10,000 per year

3001 4 Each OPTION Annual Requirements - OY3

FFP

Contractor shall perform annual requirements IAW Section C, PWS. Annual requirements includes the following services: fire alarm annual inspections, cold room panic alarm inspections, smoke detector cleaning, and supervisory alarm tests.

3002 2 Each OPTION Semi-Annual Gate Inspections - OY3

FFP

Contractor shall perform gate inspections semi-annually IAW Section C, PWS.

3003 12 Each OPTION Monthly Fire Panel Check - OY3

FFP

Contractor shall perform monthly fire panel checks IAW Section C, PWS.

3004 4 Each OPTION HFD Panel Signal Test - OY3

FFP

Contractor shall perform Hanover Fire Deparment Panel Signal tests IAW Section

C, PWS.

3005 420 Hours OPTION Routine Service Calls - OY3

FFP

Contractor shall perform routine service calls IAW Section C, PWS.

3006 10 Hours OPTION Emergency Service Calls - OY3

FFP

Contractor shall perform emergency service calls IAW Section C, PWS.

3007 400 Hours OPTION Unplanned Work Labor - OY3

FFP

Contractor shall perform unplanned work IAW Section C, PWS.

3008 16,000 Dollars, OPTION Material - OY3

Contractor shall provide material (repair/replacement parts) at the prices delineated in Section B, List of Materials. Material costs are estimated not to exceed $16,000 per year.

3009 10,000 Dollars per

Hours

OPTION Unplanned Material - OY3

Contractor shall provide unplanned materiial IAW Section G, Contract

Administration Info and Section C, PWS. Unplanned Material costs are estimated not to exceed $10,000 per year

4001 4 Each OPTION Annual Requirements - OY4

FFP

Contractor shall perform annual requirements IAW Section C, PWS. Annual requirements includes the following services: fire alarm annual inspections, cold room panic alarm inspections, smoke detector cleaning, and supervisory alarm tests.

4002 2 Each OPTION Semi-Annual Gate Inspections - OY4

FFP

Contractor shall perform gate inspections semi-annually IAW Section C, PWS.

4003 12 Each OPTION Monthly Fire Panel Check - OY4

FFP

Contractor shall perform monthly fire panel checks IAW Section C, PWS.

4004 4 Each OPTION HFD Panel Signal - OY4

FFP

Contractor shall perform Hanover Fire Deparment Panel Signal tests IAW Section

C, PWS.

4005 420 Hours OPTION Routine Service Calls - OY4

FFP

Contractor shall perform routine service calls IAW Section C, PWS.

4006 10 Hours OPTION Emergency Service Calls - OY4

FFP

Contractor shall perform emergency service calls IAW Section C, PWS.

4007 400 Hours OPTION Unplanned Work Labor - OY4

FFP

Contractor shall perform unplanned work IAW Section C, PWS.

4008 16,000 Dollars, OPTION Material - OY4

Contractor shall provide material (repair/replacement parts) at the prices delineated in Section B, List of Materials. Material costs are estimated not to exceed $16,000 per year

4009 10,000 Dollars, OPTION Unplanned Material - OY4

Contractor shall provide unplanned materiial IAW Section G, Contract

Administration Info and Section C, PWS. Unplanned Material costs are estimated not to exceed $10,000 per year

UNPLANNED WORK LABOR PRICING

Unplanned Work Labor Pricing:

Insert a proposed firm fixed price (FFP) fully burdened hourly labor rate in each box for the unplanned work labor associated with each year of contract performance. Requests for Quote (RFQs) will be issued for unplanned work requirements, and the resulting quotes will be priced from the below pricing schedule. Labor hours and material for each unplanned work requirement will be determined via

Contractor site visit. Individual unplanned work requirements will be issued and funded by task orders.

Labor Type

Unit of

Measure

Base Year

Option 1

Option 2

Option 3

Option 4

Unplanned Work Labor

Labor Rate

*See Section L and M for instructions and evaluation criteria, which delineates how these prices will be evaluated

List of Materials Pricing:

Insert a proposed FFP for each material item listed in the below table. The FFP shall be per applicable unit of issue. During the performance of any work under this contract, the Contractor shall provide material not listed in this List of Materials that has a unit cost of less than $25.00 at no additional cost to the Government. If a material item is not listed in the Section B List of Materials and has a unit cost of

$25.00 or more, then a Request for Quote for the material may be issued by the Contracting Office and a resulting task order will be issued. The Government reserves the right to provide, at its discretion, a material item(s) to the Contractor for repair or installation.

Category Material Unit of Issue

Firm Fixed-Price

Smoke Detectors:

Addressable smoke detector Each $

Hard Wire System smoke detector Each $

Smoke Detector Base Each $

Horns and Strobes:

ADA Horn Fixture Each $

ADA Strobe Fixture Each $

ADA Horn and Strobe Fixture Each $

Heat Detectors:

Addressable heat detector Each $

Hard Wire System heat detector Each $

Heat Detector Base Each $

Power Packs:

NAC PAK Control Box Each $

NAC Battery Each $

Power Supply Each $

Wiring:

Reels UL Fire Alarm MC cable 14/2 and 4 Linear Foot $

Reels UL Fire Alarm MC cable 16/2 and 4 Linear Foot $

Reels UL Fire Alarm MC cable 18/2 and 4 Linear Foot $

FPLR UL Jacketed Fire System Cable 14/2 and

Linear Foot $

FPLR UL Jacketed Fire System Cable 16/2 and

Linear Foot $

FPLR UL Jacketed Fire System Cable 18/2 and

Linear Foot $

Conduit, Rigid Linear Foot $

Conduit, EMT Linear Foot $

Fire Alarm Batteries:

7 amp hour Each $

8 amp hour Each $

10 amp hour Each $

12 amp hour Each $

18 amp hour Each $

34 amp hour Each $

55 amp hour Each $

Miscellaneous:

Glass Rod for Pull Station Each $

Weatherproof Pull Box Each $

Weatherproof Box Each $

Addressable pull station Each $

Hard wire Pull Station Each $

Addressable Input Module Each $

Addressable Relay Module Each $

Mini Relay Each $

Fire Panel Motherboard Each $

Fire Panel Relay Board Each $

Fire Control Panel Each $

Gate Loop Detection Wire Linear Foot $

FCI Zone Module Each $

Printer Each $

Printer Ribbon Each $

Xetron Voice Board Each $

Magnetic Door Holder Each $

Sprinkler Tamper Switch Each $

Elevator Control Relay Each $

Temperature Sensor Each $

Temperature Monitor Panel Each $

Emergency Push Button Each $

Carbon Monoxide System Detector Each $

Master Box Each $

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

FOR

CRREL SAFETY, FIRE ALARM, AND SUPERVISORY SYSTEMS SERVICE AND MAINTENANCE

1. GENERAL. The Contractor shall furnish all labor, supervision, tools, materials, equipment, incidental engineering, transportation, and any other items and services necessary to perform inspection, testing and maintenance, services and repair, of the fire alarm, safety and security, and monitoring systems at the Cold Regions

Research and Engineering Laboratory (CRREL), located at 72 Lyme Road, Hanover, New Hampshire. The work shall include corrective and preventive maintenance, minor maintenance and repair, report preparation, programming and other services as specified. All services shall be performed in accordance with the following requirements and

Appendices A through F.

A. Contractor Requirements: The Contractor shall plan, program, administer, manage, execute and complete the work necessary to provide the specified services. The Contractor shall perform all administrative services, such as material procurement, quality control, financial control, and correspondence, and maintain accurate and complete records and files.

(1) Contractor Primary Point of Contact (POC). The Contractor shall designate a primary POC for work being performed during the execution of the contract. The Contractor primary POC shall keep the Contracting

Officer’s Representative (COR) informed of the work progress and be available to the COR in the event of a change in the schedule or if any problems arise. The primary POC is required to be present at an initial Pre-Work

Conference after award of this contract. See Section 1.A. (4) Pre-Work Conference.

(2) Licenses and Permits. The Contractor shall meet all fire protection system licensing and qualification requirements of the State of New Hampshire. Personnel specifically trained and qualified to work on fire protection systems and equipment shall perform all work according to manufacturer's instructions. Evidence of all required licenses, as well as documentation of the qualifications of contractor personnel who will be working at the CRREL site, shall be submitted to the Contracting Officer with the Contractor’s proposal. The Contractor shall also provide documentation of the qualifications of any contractor personnel added subsequent to contract award. Contractor shall, without additional expense to the Government, be responsible for obtaining and maintaining all necessary licenses and required permits for performance of the work.

(3) Standards and Procedures. All workmanship shall meet the approved and accepted standards of the industry; equipment manufacturers; all applicable activity, local, state, and federal standards and regulations; and all applicable building and safety codes, to include but not limited to the National Fire Protection Association (NFPA), National Electric Code (NEC), and the Underwriters Laboratory.

i. NFPA 72. The Contractor shall provide a copy of training certificates for the current NFPA 72, Fire

Alarm and Signaling Codes. The certificate shall be a certificate of educational achievement passing the 2016 training. Certificates shall be provided to the COR prior to any work beginning on the fire alarm system.

ii. Lock-Out Tag-Out (LOTO) Procedures. The Contractor shall follow all CRREL LOTO procedures when performing electrical work. The LOTO procedures are available for the Contractor’s review.

iii. Manufacturer’s Certification. The Contractor shall provide verification of training certificates for

Mammoth Authorized Programmer (MAP) for Mircom Control Systems to the COR prior to any work beginning on such systems.

iv. Experience. The Contractor shall provide proof of past experience programming, maintaining, and installing Fire Control Instruments (FCI) panels and systems.

(4) Hanover Fire Department. The Contractor shall be the primary Point of Contact (POC) with the

Hanover Fire Department (HFD) when Fire Alarm systems are turned off for repairs, failures, testing or upgrades.

The Contractor will inform HFD Dispatch of any zone being off-line, and the expected time frame for bringing back on-line.

(5) Pre-Work Conference. Prior to beginning any work under this contract, the Contractor shall meet formally with the Contracting Officer and COR at a time, date, and location established by the COR for the purpose of coordinating the initiation of work. The Contractor’s designated primary POC shall be present at this meeting.

B. Specific Services and Tasks: The Contractor shall inspect, test, maintain, program, service, and repair the fire alarm, safety and security, and monitoring systems listed in this section. The Contractor shall also provide support for systems tied into the fire and supervisory systems. All workmanship shall meet the approved and accepted standards of the industry; equipment manufacturers; all applicable activity, local, state, and federal standards; and all applicable building and safety codes, to include but not limited to the National Fire Protection Association, National

Electric Code, and Underwriters Laboratory. The Contractor shall be on-call 24 hours per day, seven days a week, including weekends and holidays. The Contractor shall follow the guidelines in paragraph 1.C. for tasks that require inspection, testing, and maintenance.

(1) Fire Alarm Systems. There are a total of 19 buildings at CRREL that have fire alarm systems. All of these buildings are equipped with manual pull stations and audible alarm devices with several having visual alarm devices. Initiating devices include smoke detectors, duct smoke detectors, and heat detectors. Fire Alarm Systems are listed in Appendix A.

i. Annual Fire Alarm System Inspection, Testing and Maintenance. The Contractor shall perform an annual inspection of the Fire Alarm Systems. Contractor shall follow guidelines spelled out in paragraph 1.C. The

Contractor shall provide the COR with a separate invoice for this inspection. See Appendix B for the minimum

NFPA 72 inspection and testing requirements.

ii. Monthly Fire Panel Check. The Contractor shall perform a monthly operational check of all fire control panels to verify the panels are operating correctly and no trouble or alarms are indicating. Contractor at this time shall verify the system printer is operating correctly and hard copies of alarms are being correctly documented.

iii. Smoke Detector Cleaning. The Contractor shall clean all smoke detectors biennially (twice per year).

The cleaning shall be on a cycle that schedules half of the detectors to be cleaned one year and the second half of the detectors the following year. November 2015 all Main Lab Building detectors were cleaned, November 2016 all other buildings detectors are due.

iv. Securing Zones. The Contractor shall secure zones as needed.

v. Programming. When fixtures are updated, changed, or added to the building addressable systems, the

Contractor shall reprogram and test the equipment for proper operation.

(2) Safety and Security Systems. The Safety and Security Systems are critical areas that are required for personnel safety and building security.

i. Perimeter Gate Operators. There are three perimeter security gates that are integrated into the fire alarm system for operation after hours. The Contractor shall perform semi-annual gate inspections to verify gates safety systems are operational. The Contractor will perform troubleshooting and programming of gate operator systems and ensure the system operates in conjunction with the Computer Access Control (CAC) system. Gate operators are

Hy-Security slide gate. See Appendix C for Semi-Annual Gate Inspection Form.

ii. Cold Room Panic Alarms. There are 26 Cold Rooms that have panic alarms installed for an emergency call in to the Hanover Fire Department. The Contractor shall perform annual testing of the panic alarms and quarterly testing of the panel signal to the Hanover Fire Department dispatch. See Appendix D for Cold Room Panic

Alarm Test Record.

iii. Ammonia Detectors. The Ice Engineering Facility has seventeen (17) gas detectors that are integrated into the supervisory alarm system. The Contractor shall provide installation and maintenance of the detectors and power supplies and programming as necessary.

iv. Carbon Monoxide (CO) Detectors. The Child Development Center (CDC) has two (2) CO detectors to monitor both floors in the event of a boiler malfunction.

v. Security Door Locks. The facility has a total of three (3) buildings with secure access. The outside doors on these buildings are wired to open in the event of a fire alarm.

vi. Security Controls. Tie-ins for remote locking/unlocking of access points.

vii. Sprinkler System. Tie-ins from sprinkler system switches for low pressure, tamper, or system initiated alarms.

viii. Environmental Panel. Maintain and program the CDC-installed Winland panel that monitors the building and the refrigerator and freezer temperatures.

ix. Hazardous Area Alarm. Maintain and program the Mircom panel for the machine room door alarms located at the Ice Engineering Facility. It supports the audio-visual appliances for warning personnel of a hazardous ammonia condition in the machine room.

x. Perimeter Gate Security Arms. Maintain tie-ins from security swing arms to the gate operators. The

Contractor will perform troubleshooting of swing arms and ensure the system operates in conjunction with the

Computer Access Control (CAC) system.

(3) Facility Monitoring Systems. Many of the facilities have critical equipment that must be monitored for early failure detection. These include, but are not limited to, temperature sensors, equipment failure sensors, low level alarms, and low pressure alarms. Contractor shall install, service, repair, and maintain this equipment.

(4) Alarm Notification Systems. Fire, Safety, Security, and Facility alarms are wired into Supervisory and

Radio Annunciator Panels to notify personnel when facility conditions have changed from normal. The Contractor shall service and repair these systems to maintain a safe condition for site personnel.

i. Supervisory Alarm Panels. There are a total of eleven (11) buildings that have been wired for supervisory alarms. These include safety, security, and facility monitoring alarm signals. The Contractor shall annually inspect each supervisory panel and replace batteries as necessary. A printer is integrated with the supervisory system to produce a hard copy list of the alarms. See Appendix E for Supervisory Alarm List.

ii. Supervisory Alarm System Testing. The Contractor shall annually test all supervisory alarms and ensure all zones and annunciators are operational.

iii. Radio Annunciator Panels. The Fire and Supervisory Alarm Systems are relayed to two (2) radio annunciator panels for broadcast over Security and DPW Operations personnel radios. Contractor shall be capable of programming the Zetron voice modules and ensuring all new alarms have a unique channel and designation.

(5) Fire Safety System Support Services. The Contractor shall provide on-site support during maintenance, repair, inspection and testing of systems that utilize alarms tied to the fire safety systems. This support shall include, but not be limited to, disabling zones, notifying the Hanover Fire Department of system testing, and verifying horns, strobes and alarms are operational.

i. Elevators. The Contractor shall be available during elevator maintenance and inspections to secure and/or test any fire related relays, detectors, and alarms.

ii. Sprinklers. The Contractor shall be available during sprinkler maintenance and inspections.

iii. Fire Drills. The Contractor shall be available during the annual fire drills performed by the Safety

Office.

iv. Fire Suppression Systems. The Contractor shall be available during the suppression system maintenance and inspection for the CDC kitchen hood and the Hazardous Waste storage area suppression systems.

v. Hanover Fire Department (HFD) Support. The Contractor shall be available for technical support when the HFD requires a site test or inspection, for example during annual master box testing.

C. Inspection, Testing, and Maintenance (ITM) Program: The Contractor shall prepare and submit a site-specific

ITM program within 30 days of contract award. The program shall be based on Contractor expertise, general engineering judgments and in accordance with the latest versions of NFPA 72, NFPA 96 and NFPA 2001. The submitted plan shall include the components to be inspected, tested, and maintained, along with procedures, frequencies, and reporting methodology.

(1) Inspection Reports. The Contractor shall submit a summary of the inspection to the COR no later than two (2) weeks after the ITM is completed.

(2) Batteries and Initiating Devices. The Contractor shall replace all dead or weak batteries and inoperable initiating devices found during ITM.

(3) Deficiencies. Equipment deficiencies are problems that prevent the proper operation of the alarm systems.

i. Minor Deficiencies. The Contractor shall repair all minor deficiencies identified during inspections prior to departure from the job site. Minor deficiencies consist of lubrication, adjustment, calibration and small replacement parts such as fuses, indicator lamps, failed detectors, inoperable initiating devices etc.

ii. Major Deficiencies. Repairs that exceed that of a minor deficiency shall be reported to the COR prior to departure from the job site. Major repairs will be funded via a separate task order. See paragraph E.

D. Service Calls: Service calls are repair work requirements that arise due to faulty or activated alarm systems, or are discovered during ITM, or during the performance of other work. The Contractor shall respond in accordance with the timeframes identified below to all service calls generated by the COR. The Contractor shall perform service call work as necessary to determine the cause of system and equipment malfunctions, eliminate the cause(s), and restore the system or equipment to satisfactory working conditions. The Contractor shall provide the COR with separate invoices for routine service calls and emergency service calls.

(1) Service Call Classification.

i. Routine Service Calls. Routine service calls consist of correcting failures that do not immediately threaten personnel, or property.

ii. Emergency Service Calls. Emergency calls consist of correcting failures that constitute an immediate danger to personnel, threaten to damage property, or threaten to disrupt operations.

(2) Responding to Service Calls. The Contractor shall have procedures for receiving and responding to service calls twenty-four (24) hours per day, seven (7) days a week, including weekends and holidays. A single telephone number shall be provided by the Contractor for receipt of all service calls. An individual fully familiar with the Contractor's work control procedures and the terms and conditions of this contract shall answer all telephone calls. Service calls shall be considered received by the Contractor at the time and date the telephone call is placed by the COR.

i. Response Time for Routine Service Calls. The Contractor shall respond to a routine service call by contacting the COR by 1200 Noon the following business day. The scheduling of the on-site work shall be coordinated with the COR.

ii. Response Time for Emergency Service Calls. The Contractor shall be on the job site and working within one (1) hour after receipt of an emergency service call.

E. Optional Service, Repair, Installation and Support: Work that directly ties into the systems identified in paragraphs 1.A thru 1.D, but is required as necessary for the facility to maintain a safe environment is considered optional services. These services are periodically needed during the contract year, but may not be identified at the time of contract award. All services that cannot be priced at the time of initial contract award will be funded via separate task orders.

(1) Examples of Unplanned Work. Installation of a new alarm panel, facility renovations requiring upgrades to bring system up to current codes and standards, a new building installation, gate loop replacement, or wiring up an additional supervisory alarm to increase safety surveillance.

(2) Quotes for Unplanned Work. The Contractor shall provide a quote based upon a performance work statement furnished by the Contracting office. Quotes shall include estimated labor hours, a labor rate that is not to exceed the fully burdened labor rate established at the time of award, and the cost of materials with a unit cost of

$25.00 or greater. Provided the Government determines that the quote is fair and reasonable, the Contracting Officer will execute a separate task order to fund the work.

3. MATERIAL COSTS. During the performance of any work under this contract, the Contractor shall provide material with a unit cost of less than $25.00 at no additional cost to the Government. Material with a unit cost of

$25.00 or more shall be provided at the prices delineated in the material list in Section B of the contract. Invoices including material costs shall include a breakdown of material items and prices; invoices with pricing that exceeds the section B pricing will be rejected. If material is in neither of the above-reference categories, then a Request for

Quote for the material will be issued by the Contracting office and a resulting task order will be issued.

4. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will provide the Contractor with one radio for communication purposes when necessary. The Government will furnish electricity at existing outlets for use as may be required for the work to be performed under the contract. Storage of equipment will not be allowed on site without prior approval of the COR.

5. GENERAL INFORMATION.

A. Quality Control: The Contractor shall develop, and submit to the COR for approval, a quality program to ensure fire, safety and security services are performed in accordance with established standards, within 30 days of contract award. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the Contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Performance Requirements Summary (PRS).

B. Quality Assurance: The government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan and PRS.

C. Hours of Operation: Normal working hours are 7:00 a.m. to 4:00 p.m., weekdays, excluding holidays unless otherwise authorized in advance by the COR. Emergency service and repair calls may require work outside of the specified normal work hours.

D. Contractor Liability: Government-owned or privately-owned property damaged by the Contractor's operations under this contract shall be replaced or repaired to original condition by the Contractor at no additional cost to the

Government.

E. Security Requirements:

(1) U.S. Citizens. Contractor personnel must be U. S. citizens. All Contractor personnel are required to sign in with Security to obtain and wear security identification badges. A picture ID is required. Contractor personnel shall follow all sign-in and security regulations as directed by the CRREL Security Office and the COR.

(2) No Weapons Allowed. All persons and vehicles entering a US Government facility are subject to inspection for firearms, explosives and dangerous weapons, per RA 190-22.

(3) Subcontractor Access/Deliveries. The Contractor shall notify the COR the day before or as soon as possible when subcontractors are to arrive or deliveries of equipment and supplies are to occur. This will facilitate access on to the installation and prevent delays at the security gates.

(4) General Protection/Security Policy and Procedures. The Contractor and all associated subcontractor employees shall comply with applicable installation, access and local security policies and procedures. Policies and procedures will be provided by the local Security Office. The Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and local policies. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

(5) iWATCH Training. The Contractor and all associated subcontractors shall brief all employees on the

USACE iWATCH program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 45 calendar days of contract award and within 45 days of new employees commencing performance on the contract. The contractor shall provide certification of completion to the COR within 10 days of training completion. Training documents will be provided by the Security Office.

(6) Personnel Security Screening. The Contractor shall conduct a security screening on every employee prior to their performance under this contract. The security screening shall cover the most recent five (5) years or since age 18, whichever is shorter, providing it includes the most recent two (2) years of the applicant's life. The security screening shall include, as a minimum, checks with former employers, former supervisors and personal references, along with a local record check with police departments. The Contractor shall furnish the Contracting

Officer with a record of the results of each employee's security screening prior to entry on duty.

F. Safety and Environmental Requirements:

(1) Safety Regulations. Safety shall be in accordance with applicable provisions of U.S. Army Corps of

Engineers Safety and Health Requirements Manual, EM 385-1-1, available at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf for review, and OSHA 29 CFR 1910 regulations, which covers personal protective equipment. All applicable state and federal safety regulations relating to protection of eyes, other extremities, and hearing protection shall be followed. Machinery and equipment shall be operated in accordance with the manufacturer’s instructions and recommendations.

(2) Environmental Protection. Any hazardous waste generated by the Contractor in the performance of this contract shall be properly disposed of in accordance with all federal, state and local regulations by the Contractor

(3) Accident Prevention Plan (APP). Contractor shall prepare and submit an APP to the COR for approval prior to start of on-site work. It shall be site specific and apply to the work being performed. The minimum basic outline for an APP is spelled out in EM 385-1-1. See Appendix F for an example of an Accident Prevention Plan.

(4) Employee Safety Awareness. In order to help promote safety awareness, the Contractor shall insure that each employee reviews the Accident Prevention Plan prior to beginning work.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

(5) Operating Vehicles. Contractor personnel shall wear seatbelts at all times when driving on CRREL premises. Contractors shall obey speed limit of 10 mph. Contractor vehicles shall be equipped with back-up alarms.

Particular care shall be used while operating vehicles in the Child Development Center parking area where small children will be entering and exiting.

(6) Safety Data Sheets. The Contractor shall provide Safety Data Sheets (SDS’s) for any products or materials brought on the facility for use in the performance of this contract. No product may be used without the prior approval from the COR.

(7) Smoking Policy. Smoking shall comply with the CRREL Smoking Policy, which in general, prohibits smoking in any building or facility, or within 50 feet of any building entrance, except in a designated smoking area.

Designated smoking areas shall be discussed at the Pre-Work Conference.

G. VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS:

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause

52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of

Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/

Department of Veterans Affairs–VOW to Hire Heroes Act http://benefits.va.gov/vow/

Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation–Hiring Our Heroes http://www.hiringourheroes.org/

Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-

_guide_to_hiring_veterans_0.pdf

H. PERFORMANCE REQUIREMENTS SUMMARY (PRS). The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective

SOW

Para Standard

Acceptable Quality

Level (%)

Method of

Surveillance

Incentives/Remedies (if applicable)

Contractor is the CRREL

POC with the HFD

1.A.(4) Inform HFD of any Fire

System being off-line.

100% compliance 100%

Inspection

Immediate service upon notification by the COR of non-compliance

Fire Alarm Systems 1.B.(1)i Perform annual Fire Alarm

System inspection within the required time frame.

100% compliance 100%

Inspection

Immediate service upon notification by the COR of non-compliance; Reperformance at no additional cost to the

Government.

Fire Panel Checks 1.B.(1)ii Perform monthly operational check of all fire control panels.

Complete tasks 95% on or before the required time

Periodic

Inspection

Reperformance

Detector Cleaning 1.B.(1)iii Detectors are kept clean of dust and dirt for proper operation.

Complete tasks 95% on or before the required time

Periodic

Inspection

Reperformance

Programming 1.B.(1)v Program/reprogram the addressable systems as necessary

100% compliance 100%

Inspection

Immediate service upon notification by the COR of non-compliance

Perimeter Gate Operators 1.B.(2)i Perform semi-annual Gate

Operator inspections.

Complete tasks 95% on or before the required time

100%

Inspection

Reperformance

Cold Room Panic Alarms 1.B.(2)ii Perform annual Cold Room

Panic Alarm and quarterly signal testing.

Complete tasks 95% on or before the required time

Periodic

Inspection

Reperformance

Ammonia Detectors 1.B.(2)iii NH3 Detectors are operational.

100% compliance Periodic

Inspection

Immediate service upon notification by the COR of non-compliance

CDC CO Detectors 1.B.(2)iv CO Detectors are operational. 100% compliance Periodic

Inspection

Immediate service upon notification by the COR of non-compliance

Security Door Locks 1.B.(2)v Door locks are operational. Complete tasks 95% on or before the required time

Periodic

Inspection

Reperformance

Hazardous Area Alarm 1.B.(2)ix Maintain IEF machine room 100% compliance 100% Immediate service upon warning system. Inspection notification by the COR of non-compliance

Perimeter Gate Swing

Arms

1.B.(2)x Maintain gate swing arms tie-ins

Complete tasks 95% on or before the required time

Periodic

Inspection

Reperformance

Facility Monitoring 1.B.(3) Maintain monitoring equipment

Complete tasks 95% on or before the required time

Periodic

Inspection

Reperformance

Supervisory Alarm Panels 1.B.(4)i/ii Perform annual Supervisory

Alarm Pane inspection and testing.

100% compliance 100%

Inspection

Immediate service upon notification by the COR of non-compliance

Fire Safety Support 1.B.(5) Provide on-site support for systems that tie into the Fire and Supervisory systems.

100% compliance 100%

Inspection

Immediate service upon notification by the COR of non-compliance

ITM Reporting 1.C.(1) Prepare and submit reports after completion of work

Complete tasks 95% on or before the required time

100%

Inspection

Reperformance

ITM Replacing parts 1.C.(2) Replace batteries or initiating devices when found/informed of failure

Complete tasks 95% on or before the required time

Periodic

Inspection

Reperformance

Routine Service Calls 1.D.(2)i Respond to routine calls by noon next business day.

Complete tasks 95% on or before the required time

100%

Inspection

Immediate service upon notification by the COR of non-compliance

Emergency Service Calls 1.D.(2)ii Respond to emergency calls within one (1) hour.

100% compliance 100%

Inspection

Immediate service upon notification by the COR of non-compliance

5. APPENDICES.

A. Fire Alarm Systems

B. Minimum NFPA 72 Inspection and Testing Requirements

C. Semi-Annual Gate Inspection Form

D. Cold Room Panic Alarm Test Record

E. Supervisory Alarm List

F. Accident Prevention Plan

A -- FIRE ALARM SYSTEM

CONTROL

PANEL

ZONES

ALARM DEVICES

Sprinkler /

Suppression

System

R e m o te

A n n u n c ia to r

P a n l

M a n u a l

P u ll S ta ti

S m o k

D te c to r

H e a t

D e te c to r

D u c t

S m o te c to r

A u d ib le p p li a n c s

V is u a l

A p p li a n c

CDC

CB-43

FC-72 6 Yes Yes Yes Yes Yes Yes

Sprinkler /

Suppression

Cold Room

Complex FC-72 33 Yes Yes Yes Yes Yes

DPW

CB-21

FC-72 10 Yes Yes Yes Yes Yes Sprinkler

Emergency Response

Bldg.

FC-72 1 Yes Yes Yes Yes

FERF

CB-31

FC-72 8 Yes Yes Yes Yes Yes

Ballistics Building Sub-Panel 1 Yes Yes Yes Yes Yes

Project Support

CB-38

Sub-Panel 1 Yes Yes Yes Yes Yes

Greenhouse

CB-64

FC-72 4 Yes Yes Yes Yes Yes Yes

Garage Sub-Panel 1 Yes

IEF

CB-24

Mircom FX 2000 SLC Yes Yes Yes Yes Yes Yes

LMO

CB-27

FC-72 5 Yes Yes Yes Yes Yes Sprinkler

CONTROL

PANEL

ZONES

ALARM DEVICES

Sprinkler /

Suppression

System

R m te n u n c ia to r

P a n l

M a n u a l

P u ll S ta ti

S m o te c to r

H e a t

D e te c to r

D u c t

S m o te c to r

A u d ib le p p li a n c

V is u a l

A p p li a n c

Main Laboratory

CB-01

MIRCOM FX 2000 SLC Yes Yes Yes Yes Yes Yes Sprinkler (CRs)

Remote Sensing

CB-52

FC-72 14 Yes Yes Yes Yes Yes Yes Sprinkler

TCE

CS-55

FC-72 12 Yes Yes Yes Yes Yes Yes Sprinkler

TIAC

CB-62

MIRCOM FX 2000 SLC Yes Yes Yes Yes Yes Sprinkler

Vehicle Storage

CS-29

FC-72 2 Yes Yes Yes Yes Yes

Well House #2

CB-15

FC-72 6 Yes Yes Yes Yes

Asphalt Lab Sub-Panel 1 Yes Yes Yes Yes Yes

Hazardous Waste

Area Sub-Panel 1 Yes Yes Suppression

W913E5-16-R-0005

APPENDIX B

Minimum NFPA 72 Inspection and Testing Requirements

MINIMUM NFPA 72 REQUIREMENTS

PROPERTY NAME (USER) MONITORING ENTITY

Name: ________________________________ Contact: _________________________

Address: ______________________________ Telephone: _______________________

City: __________________________________ Monitoring Account Ref: ____________

TYPE OF TRANSMISSION SERVICE

[ ] Master Box [ ] Annual

[ ] Leased Access [ ] Semi-Annual

[ ] DAC M/Y_____ AH_____

[ ] Local

Panel Manufacturer: _____________________ Model: _________________________

Circuit Styles: ___________________________ Zones: __________________________

NOTIFICATIONS MADE BEFORE TESTING

[ ] Monitoring Agency

[ ] Building Occupants

[ ] Building Management

SYSTEM TESTS AND INSPECTIONS

ALARM INITIATING DEVICES

Visual Functional Quantity

[ ] [ ] Manual Pull Stations _________

[ ] [ ] Smoke Detectors _________

[ ] [ ] Duct Smokes _________

[ ] [ ] Beam Smokes _________

[ ] [ ] Heat Detectors _________

[ ] [ ] Water flow Switches _________

[ ] [ ] Tamper/PIV Switches _________

ALARM INDICATING DEVICES

[ ] [ ] Bells _________

[ ] [ ] Horns _________

[ ] [ ] Strobes/Lights _________

[ ] [ ] Speakers _________

[ ] [ ] Chimes _________

ALARM INDICATING CIRCUITS

Visual Functional Comments

[ ] [ ] Control Panel _______________________________

[ ] [ ] LEDs _______________________________

[ ] [ ] Fuses _______________________________

[ ] [ ] Trouble Signals _______________________________

[ ] [ ] Disconnect Switches _______________________________

[ ] [ ] Ground Fault _______________________________

[ ] [ ] Primary Power Supply _______________________________

[ ] [ ] Remote Annunciator _______________________________

SYSTEM POWER SUPPLIES

Primary Voltage: ________________

Primary Disconnect Location: _______________

SECONDARY POWER TYPE BATTERY

[ ] Discharge Test [ ] Sealed Lead Acid

[ ] Charger Test [ ] Other ____________

Battery Capacity AH ___________ M/Y _________________

OFF PREMISES MONITORING

[ ] Alarm Signal

[ ] Alarm Restore

[ ] Trouble Signal

[ ] Supervisory Signal

NOTIFICATION OF TESTING COMPLETE

[ ] Monitoring Agency

[ ] Building Occupants

[ ] Building Management

GENERAL COMMENTS: _____________________________________________________________________

SYSTEM RESTORED TO NORMAL: DATE: ____________________ TIME: __________________

TESTING PERFORMED IN ACCORDANCE WITH APPLICABLE NFPA STANDARDS

INSPECTOR: ________________________________________ DATE: __________________________

SIGNATURE: __________________________________________________________________________

APPENDIX C

Semi-Annual Motorized Gate Inspection and Test

Completed By:___________________________ Date:_______________

North Gate

[ ] Safety Strip

[ ] Exit Loop

[ ] Safety Loops

[ ] Firefighters Key Override

[ ] Card Reader

South Gate - Entrance

[ ] Firefighters Key Override

[ ] Card Reader

South Gate - Exit

[ ] Exit Loop

[ ] North Gate - Fire Alarm Override [ ] South Gate - Fire Alarm Override

[ ] Replace Safety Edge Transmitter Batteries (April / October)

Comments:____________________________________________________________________

APPENDIX D

Cold Room Panic Alarm Test Record

Completed By:___________________________ Date:_______________

Room # ___________ Comments ______________________________

[ ] Warning Horns

[ ] Hanover Fire Department Dispatch

General Comments ___________________________________________

APPENDIX E

Supervisory Alarm List

TCE Plant

1. Low temperature in boiler room

2. Low temperature in process area

Greenhouse

1. Low temperature in greenhouse

2. Low temperature in the lab office hall

3. Boiler, water cut-off alarm

4. Failure in growth chamber #1

5. Failure in growth chamber #2

Remote Sensing

1. Failure boiler #1

2. Failure boiler #2

3. Low temperature sprinkler riser

4. Server room high temperature

5. Generator failure

Ice Engineering

1. IEF Alarm Bell

2. NH3 Basement

3. NH3 1st Floor

4. NH3 Vent Piping

Main Lab Building

1. Low temperature backflow preventer

2. Boiler failure #1

3. Boiler failure #2

4. Compressor failure, 20 ton

5. Compressor failure, 56 ton

6. Hot water failure

7. Sprinkler low air

8. Computer room high temp

9. Telephone room high temp

Main Lab (goes directly to radio annunciator)

1. Vault alarm

2. Chemical storage room fan failure

Mail Lab Cold Rooms

1. Cold Room Panic Alarm - for 26 rooms

Child Development Center (CDC)

1. Freezer failure

2. Refrigerator failure

3. Hall low temp

4. Rainbow room low temp

5. Sprinkler low air

6. Water heater failure

7. Boiler failure

8. Sewage pump failure

9. Fuel Oil Spill Tank Level Alarm

10. CO Basement Machine Room

11. CO 1st…

This is the start of the file's text. The full file is on GovTribe.