SOW.pdf

PDF 32 KB Posted

Attached to
Lumber and Roofing Package Federal contract opportunity
Solicitation number
W91364-16-T-0010
Issued by
Department of the Army Ohio Army National Guard

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Lumber and Roofing Package, newest first.
File Type Posted
BOM.xlsx XLSX spreadsheet
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

OHIO ARMY NATIONAL GUARD

Headquarters, 112th Engineer Battalion

6225 ENGLE ROAD

Brook Park, Ohio 44142-2107

19 APRIL 2016

Division 1 General

The Ohio Army National Guard, Directorate of Logistics is seeking bids on the following products. The purchase and delivery of material specified in the attached BOM list. Material is to be used for troop construction projects during Annual Training 2016. Timely delivery and accuracy is critical to the success of these missions. All material must be delivered by 8 July 2016 unless otherwise specified.

Roads on the route of travel inside the base have been recently paved and are in good condition. Drivers must obey the 35 MPH speed limit on post.

SW 1 - Scope

Supply all listed materials to perform all work in strict accordance with the statement of Work and Specifications, as designated by the CRJMTC Engineer or representative. All quotes must include material costs, labor and all fees associated with loading of vehicles at the point of pick up. The government reserves the right to exercise and purchase any or all of the listed material as required. There is no weekend work anticipated for these construction projects.

SW 2 - Site of Work

The site of the proposed work is located at Camp Ravenna Joint Military Training Center (CRJMTC), 8451 SR 5, Ravenna, Ohio, approximately 6 miles West of Newton Falls, Ohio located in Portage County.

SW 3 - Work to be accomplished

The work to be accomplished is supply and delivery of the designated quantities of building material beginning 8 July, 2016 as required. Deliveries will only be accepted during business hours, 8am to 4pm, Monday through Friday, excluding federal holidays.

Federal Holidays:

1. New Years Day, 1 January 2.

3.

4. Memorial Day, last Monday of May

5. Independence Day, 4 July

6. Labor Day, first Monday in September

7. Columbus Day, second Monday in October 8.

Deliveries outside the posted dates and times must be coordinated in advance and will only be accepted in extreme cases. Delivery driver must be prepared and have equipment to unload and place the delivered material.

Camp Ravenna Joint Military Training Center Ravenna, Ohio

2 | P a g e

SW 4 - Site Visitation and Point of Contact

Visits if necessary shall be arranged through CPT Joshua Huber 614-336-7210 joshua.s.huber5.mil@mail.mil

SW 5 - Point of Contact

Questions concerning the specification should be directed to CPT Joshua Huber 614- 336-7210 joshua.s.huber5.mil@mail.mil

SW 6 - Performances

1. Submittal of a bid by a Contractor shall be accepted as prime facie evidence that the Contractor has examined the Specifications and the Job Site, as necessary and has satisfied himself as to the nature and location of the work and all matters which can in any way affect the work or cost thereof, under the contract. Any failure of the Contractor to acquaint himself with all available information, including physical survey of the proposed work, will not relieve him from successfully performing all work to be done for a complete and successful job.

2. The above brief outline of principle features of work in no way limits the responsibility of the contractor to perform all work and furnish all labor and materials, required by the Specifications referred herein. Any omission form the Specification or misdescriptions thereof shall not relieve the Contractor from performing all work required, and furnishing the materials required to completely fulfill the intent of the Contract.

END OF SECTION

File details come from the government source that posted it. Updated .