PN 87437 Amendment 002 List.pdf
PDF 59 KB Posted
- Attached to
- PN 87437 SOF Group Headquarters Federal contract opportunity
- Solicitation number
- W912PM21R0001
About this file
This document provides details for a federal contract solicitation to construct a Special Operations Forces Group Headquarters facility. The U.S. Army Corps of Engineers, Wilmington District is seeking a firm fixed price contract for construction of the facility, including administrative space, conference rooms, classrooms, sensitive compartmented information facility, group operations center, logistics network operation center, headquarters company, arms room vault, secure storage, unit storage, lockers, toilets, showers, and required mechanical, electrical and communication rooms, with supporting site work and utilities. The project value is between $25-100 million. The North American Industry Classification System code is 236220 and the size standard is $36.5 million. The proposal due date is November 12, 2020. Interested offerors must register in the System for Award Management to be eligible for award. The solicitation number is W912PM21R0001 and additional information can be obtained from the Contracting Specialist or Contracting Officer listed.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PN 87437, SOF Group Headquarters, Ft, Bragg Solicitation No. W912PM21R0001
Sheets / Specs Description of change Amd. No.
01 50 00 Sections 2.3 and 2.3.3 revised to clarify fencing type and to not allow temporary fence posts set in concrete 002 05 12 00 Section 2.6.2 revised to remove requirements for zinc rich primer and priming of slip critical surfaces. 002 07 81 00 Specification Deleted 002 08 44 00 Section 2.2.2: Removed clear anodic coating 002 08 81 00 Section 2.2.2: Replaced Gray VE3 2M #2 with Solar Gray - Medium Tint. Added Section 2.5 to include Opaque Window Film. 002 10 11 00 Section 2.4: Removed Projection Screens from Specification 002 10 56 13 Specification Added 002 10 90 00 Specification Added 002 12 21 00 Specification Added 002 12 24 13 Specification Deleted 002 FF&E Pkg Section 5, FF&E Cost Estimate Worksheet revised. 002
A-113d Removed shelving in Room 138 002 A-123n Added RAF elevations to Room 210 002 A-143 Corrected tags 133 to 134 and 134 to 136 and changed 136 ceiling to gypsum board 002 A-201 Add size of precast bands 002 A-202 Add size of precast bands 002 A-203 Add size of precast bands 002 A-310 Note secure area ceiling, revise Tag Note 6 002 A-401 Changed Tag Note #13 from 15" wide to 12" wide 002 A-410 Changed lockers from single tier to double tier graphically, Added NIC to tag note #17 002 A-600 Updated missing information in Door Schedule 002 A-601 Updated missing information in Door Schedule 002 A-602 Updated missing information in Door Schedule 002 A-610 Deleted Room 133 Storage 002 A-610a Changed ceiling in Elevator Machine Room 155C to "EXP" exposed ceiling 002 A-610b Changed ceiling in SSO Room 234 to "ACT" acoustical ceiling tile 002 A-611 Added note 16 002 A-611 Add "VD-4" to Special Items Key 002 P-601 Revised water closet model number to reflect bottom outlet 002 P-602 Revised shower description. 002 M-601 Remove "…AND VFD BY CONTROLS CONTRACTOR" from remark 1 on AHU schedule. 002 M-601 Rewrite remark 4 of AHU schedule to state "PROVIDE VFD WITH INTEGRAL MOUNTED DISCONNECT SWITCH AS SPECIFIED BY DIVISION 26" 002 M-603 Remove "…AND VFD BY CONTROLS CONTRACTOR" from Schedule note 1 on ERU schedule. 002 M-603 Rewrite remark 9 of ERU schedule to state "PROVIDE VFD WITH INTEGRAL MOUNTED DISCONNECT SWITCH AS SPECIFIED BY DIVISION 26 FOR FANS AND ENERGY WHEEL" 002 M-605 Rewrite remark 1 of pump schedule to state "HORIZONAL BASE MOUNTED, B&G SERIES 1510 WITH NEMA PREMIUM VFD RATED ODP MOTOR" 002 M-605 Rewrite remark 3 of pump schedule to state "PROVIDE VFD WITH INTEGRAL MOUNTED DISCONNECT SWITCH AS SPECIFIED BY DIVISIONL" 002 CS-110 Added note to grade and grass areas if OBI2 not awarded 002 CS-111 Removed bollards at corner of building. Added note to grade and grass areas if OBI2 not awarded 002 CS-112 Bollard locations revised at the building. Note to restore area if paver option not awarded added. 002 CS-113 Note to restore area if paver option not awarded added. 002 CS-114 Note to restore area if paver option not awarded added. 002 CS-503 Paver detail revised to have brick match brick veneer and reference architectural specifications. 002 CS-561 Bike rack detail revised for 10 spaces minimum and to submit for approval prior to installation 002 CS-564 Clarification that bridge foundation design the responsibility of the contractor 002 CG-110 Added note to grade and grass areas if OBI2 not awarded 002 CG-111 Added note to grade and grass areas if OBI2 not awarded 002 CG-112 Top and Bottom of Wall elevations added. Added note to restore area if OBI3 not awarded. 002 CG-113 Added note to restore area if OBI3 not awarded. 002 CG-114 Added note to restore area if OBI3 not awarded. 002 CU-101 Point of demarcation for sanitary sewer revised to 10 feet 002 CU-110 Point of demarcation for sanitary sewer revised to 10 feet 002 CU-111 Point of demarcation for sanitary sewer revised to 10 feet 002 CU-112 Point of demarcation for sanitary sewer revised to 10 feet 002 CU-113 Point of demarcation for sanitary sewer revised to 10 feet 002 CU-114 Point of demarcation for sanitary sewer revised to 10 feet 002 S-351 Revised bracing detail for top of masonry wall, Section E 002 S-352 Revised bracing detail for top of masonry wall, Section C 002 F-110 Removed fire-resistance rating at telecom rooms 002 F-120 Removed fire-resistance rating at telecom rooms 002