W912PM19R0007_SOF_DFAC_ATF.pdf

PDF 2 MB Posted

Attached to
PN82254 SOF Dining Facility, Aberdeen Training Facility (ATF), Fort Bragg, NC Federal contract opportunity
Solicitation number
W912PM19R0007
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to PN82254 SOF Dining Facility, Aberdeen Training Facility (ATF), Fort Bragg, NC, newest first.
File Type Posted
NAVFAC_USACE_PPQ.pdf PDF
W912PM19R0007-0002_SOF_DFAC_ATF_SF30.pdf PDF
W912PM19R0007-0002_SOF_DFAC_ATF_Conformed.pdf PDF
PN82254_AMDT0001_PLANS_VOL_1.pdf PDF
PN82254_AMDT0001_PLANS_VOL_1_unlocked.pdf PDF
PN82254_AMDT0001_PLANS_VOL_2_unlocked.pdf PDF
PN82254_AMDT0001_PLANS_VOL_2.pdf PDF
W912PM19R0007-0001_SOF_DFAC_ATF_Conformed.pdf PDF
W912PM19R0007-0001_SOF_DFAC_ATF_SF30.pdf PDF
PN82254_PPSV_Sign-in_Sheet.pdf PDF
PN82254_RTA_PLANS_VOL_2.pdf PDF
PN_82254_Site_Visit_Map.pdf PDF
PN82254_-_Ready_to_Advertise_-_Specifications_Vol_3_FF&E_Jun19.pdf PDF
NAVFAC_USACE_PPQ.pdf PDF
W912PM19R0007_SOF_DFAC_ATF.pdf PDF
PN82254_-_Ready_to_Advertise_-_Specifications_Vol_2_Jun19.pdf PDF
PN82254_RTA_CAD-FILES.zip ZIP file
PN82254_-_Ready_to_Advertise_-_Specifications_Vol_1_Jun19.pdf PDF
PN82254_RTA_PLANS_VOL_1.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912PM19R0007 Construct SOF Dining Facility, Aberdeen Training Facility (ATF), Fort Bragg, NC

This procurement is being solicited and procured using the Low est Price Technically Acceptable (LPTA) source selection process. This Request for Proposal is issued in accordance w ith FAR Part 15.101-2.

This is an unrestricted solicitation.

The Magnitude of Construction is betw een $10,000,000.00 and $25,000,000.00.

Point of Contact:

Michael Mullen michael.m.mullen@usace.army.mil 910-251-4710

MICHAEL M MULLEN 910-251-4710

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

18-Jun-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 73 00

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Jul 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

910-251-4454FAX:TEL: 910-251-4700 TEL: FAX:

W912PM19R0007 85

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912PM19R0007

Section 00 01 10 - Table of Contents

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Site Visit Map Attachment 2 NAVFAC USACE PPQ

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Bid: Site Development

Complete to the 5-foot line, including all demolition work, per plans and specifications.

FOB: Destination

NET AMT

0002 1 Job Base Bid: Construct Dining Facility

Construction complete, per plans and specifications.

0003 1 Job Base Bid: Payment and Performance Bonds

Complete

0004 1 Job OPTION Optional Bid Item 1: Cyber Security

Complete. Cyber security measures, per plans and specifications.

Acceptance period for this CLIN is 180 calendar days from notice to proceed.

0005 1 Job OPTION Optional Bid Item 2: Site Improvements

Complete. Paving, walks, curbs and gutters, per plans and specifications.

0006 1 Job OPTION Optional Bid Item 3: HVAC Improvements

Complete. HVAC system, to include cooling generating system, distribution systems, terminal and package units, controls and instrumentation, and testing and balancing, per plans and specifications.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 540 dys. ANP 1 SOCOM RESIDENT OFFICE

WALTER DOUG WOOD

BUILDING 2-2414, WOODRUFF STREET

FORT BRAGG NC 28307-0069

W912PM

0002 540 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0003 10 dys. ADC 1 U S ARMY CORPS OF ENGINEERS, WILMINGTON

JOHN HILL

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

910-251-4451

0004 540 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0005 540 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0006 540 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

Section 00 21 16 - Instructions to Proposers

NOTICE TO OFFERORS

SUBTOTAL Base Bid Items; CLINS 0001 – 0003 $______________________

SUBTOTAL of all Optional Bid Items; CLINS 0004-0006 $______________________

TOTAL AMOUNT OF ALL LINE ITEMS 0001-0006 $________________________

PERIOD OF PERFORMANCE ____ 540__ _______

NOTICE TO OFFERORS

NOTE 1:

The period of performance of CLIN’s 0001-0006 shall run concurrently with the entire contract duration so that the period of performance shall not exceed 540 calendar days.

NOTE 2:

The exercise of all optional bid items 1 through 03 (CLIN’s 0004-0006) shall be subject to the availability of funds.

NOTE 3:

The government reserves the right to exercise optional bid items 1 through 3 (CLIN’s 0004-0006) by no later than 180 Days after Notice To Proceed.

SCOPE OF WORK

See Description at 1.1 General Proposal Submission Instructions & Requirements.

INSTRUCTIONS AND REQUIREMENTS

GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

PN 82254

SOF Dining Facility, Aberdeen Training Facility (ATF) Fort Bragg, North Carolina

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits construction and design of a Dining Facility, at Aberdeen Training Facility (ATF) Fort Bragg NC. The scope of work includes: Construct a standard Dining Facliity of approximately 17,500 SF including permanent party modified small standard design dining facility. Deviationsfrom the standard include removal of field feeding, drive through, and carry out areas. Project includes food preparation and cooking areas, entrance/control area, serving, dining (300 PN seating capacity), dishwashing, pot wash, administration, staff locker area, patron’s restrooms, waste disposal, receiving and loading dock, cold and dry storage, information systems, fire detection, alarm, and suppression systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Heating and air conditioning will be provided by self-contained system. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided.

The period of performance is 540 calendar days. Work location is Fort Bragg, North Carolina.

Antiterrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm-Fixed Price (FFP).

1.2 The instructions and requirements contained herein establish uniform evaluation procedures for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Lowest Price Technically Acceptable Source Selection Process (See Federal Acquisition Regulation 15.101-2). Proposals should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

2. GENERAL INSTRUCTIONS.

In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

In accordance with 15.306(c) (1) and FAR Clause 52.215-1(f) (4), Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.3, below, the

Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.

2.2 If applicable, a 8(a) Joint Venture or SBA/DoD approved Mentor-Protégé must submit all required documentation with their offer to be considered responsive.

2.3 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. The Government will also evaluate past experience and past performance submitted by the individual firms that make up a joint venture.

2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor. Successor entities shall clearly demonstrate in Volume I, Tab A of their proposal the official legal means performed to transform the former Predecessor Company to its current Successor, legal business entity. Examples of substantive documentation may include but is not limited to Articles of Incorporation, Joint Venture Agreements, Novation Agreements, and Merger Documentation.

"Successor" means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger).

Note: The term ''successor'' does not include new offices/ divisions of the same company or a company that only changes its name.

2.5 Offerors shall submit their proposal in accordance with the Section 3. General Proposal Format, paragraph 3.4.

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT.

3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name, and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

3.4 Each offeror must submit both a Price Proposal and a Technical Proposal via the Federal Business Opportunities (FBO) website. No hard paper copies will be accepted or evaluated.

Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912PM19R0007_COMPANY NAME_VOLUME I

W912PM19R0007_COMPANY NAME_VOLUME II

Offerors shall submit the proposals electronically via FBO.gov. You must be logged in to be able to submit/review electronic responses. The user guide is located at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.

Proposal due Date and Time:

Request For Proposal No: W912PM19R0007 Due Date of Proposal: 17 July, 2019 Time by which Proposals are due: 2:00 P.M. (Eastern Time) Title of Project: PN 82254 SOF Dining Facility, Aberdeen Training Facility, (ATF), Fort Bragg, North Carolina

Proposals are due as specified on the solicitation document (as amended if applicable). The time & date of proposal receipt will be the upload completion / delivery time & date recorded within FBO. Do not assume that electronic communication is instantaneous. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. If an electronic submission is uploaded minutes before the deadline but the upload doesn’t complete until after the deadline, the submission will be considered late. Offerors are encouraged to keep a copy of the upload confirmation for their record.

3.5 The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

3.6 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.

3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

3.8 Tabs. Proposal shall be organized and tabbed as follows:

3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTOR 1)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted and one (1) original copy of the bid guarantee in both electronic and hardcopy shall be submitted.

TAB CONTENTS OF THE PRICE PROPOSAL

A The Proposal Cover Sheet

B Standard Form 1442

C Acknowledgement of Amendments (If Applicable)

D FACTOR 1: PRICE

E Section 00 45 00 – Representations and Certifications

F Teaming Arrangement (If Applicable)

G Bid Guarantee (Bid Bond)

H Financial Information and Bonding Capability

I Subcontracting Plan (FOR LARGE BUSINESSES ONLY)

TAB A – The proposal cover sheet is required by FAR 52.215-1 (c) (2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:

PROPOSAL COVER SHEET

Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included. DUNS number will be used to access Contract Performance Assessment Reporting System (CPARS) data. Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the proposal data Sheet.

TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB C - If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.

TAB D – FACTOR 1: Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule.

TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.

1. The solicitation number;

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

5. Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

TAB F - Teaming Agreement, if applicable. See paragraph 2.1 and 2.2 Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.

TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in BOTH hard copy and electronically in Tab G. Hard copies of Bid Guarantees (submitted via UPS, FedEx, USPS, etc.) shall be addressed to the Contract Officer at:

USACE – Wilmington District Attention: John Hill 69 Darlington Ave Wilmington NC 28403

For the purposes of this Request for Proposal, please note that in accordance with

(IAW) FAR 28.001:

“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”

Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.

TAB H - Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.

TAB I - Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY.

Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov. Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS.

3.8.2 VOLUME II: TECHNICAL PROPOSAL (FACTORS 2-4)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE TECHNICAL PROPOSAL

A Factor 2: Past Experience

B Factor 3: Past Performance

C Factor 4: Key Personnel

Page Limitations: The following page limitations are established for each factor above:

Factor 2: Past Experience, Construction – Limited to 20 pages (maximum of 5 forms) Factor 3: Past Performance – Limited to no fewer than three (3) and no more than five (5) projects. Individual project Past Performance Assessment Questionnaires shall not exceed four (4) pages; Government evaluators will review and evaluate only the information contained on the first four (4) pages.

Factor 4: Key Personnel – Limited to 5 pages per individual resume

NOTE: Pages that exceed the required page limitations will not be evaluated.

Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

Offerors are cautioned that “parroting” of the Technical requirements or the Scope of Work with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB A—FACTOR 2 – PAST EXPERIENCE

4.1 SUBMISSION/MINIMUM REQUIREMENTS:

4.1.1 The offeror shall demonstrate the experience as a prime contractor on projects of similar size, scope, and complexity.

4.1.2 The minimum requirement for a project of similar size, scope, or complexity is defined as having all of the following criteria:

o TEN thousand 10,000 square feet (SF) or more aggregate interior space.

o Atleast one (1) project must include the construction of a similar facility as cafeteria, commercial kitchen construction, and/or DFAC.

o Total value of project equal to or greater than $6,000,000.00

4.1.3 The offeror shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, (See Attachment 2), in response to this factor. All projects submitted must be at least 50% complete within the last six (6) years preceding the date of the solicitation

4.1.4 Offerors shall utilize Experience Information Form in Attachment 2. This sheet is MANDATORY and SHALL be used to submit project information. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded;

however, total length for each project data sheet shall not exceed FOUR (4) pages.

4.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

4.2 EVALUATION CRITERIA:

4.2.1 The Government will evaluate the extent of recent, relevant experience of the prime contractor as identified in paragraph 4.1.2. Projects that were awarded on an individual task/delivery order basis will not be aggregated for purposes of meeting minimum or additional criteria. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

4.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of three (3) projects which meet the minimum criteria of paragraph 4.1.2.

4.2.3 The offeror’s Past Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP.

4.2.4 The Government will review the project experience of the offeror on projects provided in response to the Past Experience Factor. Offerors must meet all of the minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

5. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB B — FACTOR 3 - PAST PERFORMANCE.

5.1 SUBMISSION/MINIMUM REQUIREMENTS:

5.1.1 Past performance refers to the quality of recent and relevant project experience from the owner’s perspective. The offeror shall complete and provide a Past Performance Assessment

Questionnaire (Attachment 5) on no fewer than three (3) and no more than five (5) projects.

Projects submitted under this factor must first be deemed recent and relevant.

5.1.1.1 Relevant: Offer must demonstrate experience as a prime contractor on projects of similar size, scope, or complexity. The minimum requirement for a project of similar size, scope, or complexity is defined as a requirement with all of the following:

o Ten thousand 10,000 square feet (SF) or more aggregate interior space.

o At least one (1) project must include the construction of a similar facility as cafeteria, commercial kitchen construction, and/or DFAC.

o Total value of project equal to or greater than $6,000,000.00

5.1.1.2 Recent: Projects of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation

5.1.2 Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under FACTOR 2, PAST EXPERIENCE. Individual project Past Performance Assessment Questionnaires shall not exceed four (4) pages; Government evaluators will review and evaluate only the information contained on the first four (4) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Assessment Questionnaire with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.

5.1.3 The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contract Performance Assessment Reporting System (CPARS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

5.1.4 Offerors shall utilize the Past Performance Assessment Questionnaire in Attachment 5.

5.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

5.2 EVALUATION CRITERIA:

5.2.1 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information.

5.2.2 Past performance shall be initially evaluated to determine whether the offeror’s present/past performance is recent, and relevant to the effort to be acquired.

Relevant: The minimum requirement for a project of similar size, scope, and complexity is defined as a Ten thousand 10,000 square feet (SF) or more aggregate interior space, including atleast One (1) project must include the construction of a similar facility as cafeteria, commercial kitchen construction, and/or DFAC multi-story or multiple buildings on a single project, with a total value equal to or greater than $6,000,000.00.

Recent: Projects of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation

5.2.3 The Government will evaluate ONLY recent and relevant past performance based on the elements listed below to assign a confidence rating of acceptable/unacceptable.

5.2.4 The past performance evaluation shall determine how well the offeror performed on the prior contracts. The contractor shall have no “unsatisfactory” in criteria 1-7, and no “marginal” ratings in criteria 1-4 (below) in the Contract Performance Assessment Reporting System (CPARS): quality, schedule, cost control, management, and utilization of small business, regulatory compliance, and safety.Furthermore, the contractor shall have not have an averaged "unsatifsfactory" in criteria 1-7, or an averaged "marginal" rating in criteria 1-4 in the Past Performance Questionnaire.

(1) Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the offeror’s ability to maintain quality control and accuracy of quality control documentation.

(2) Schedule. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.

(3) Cost Control. The Government will evaluate all information available with respect to the offeror’s ability to efficiently utilize resources and demonstrate cost responsibility.

(4) Management. The Government will evaluate all information available with respect to the offeror’s ability to manage resources and key personnel.

(5) Utilization of Small Business. The Government will evaluate all information available with respect to the offeror’s ability to meet small business subcontracting plan goals.

(6) Regulatory Compliance. The Government will evaluate all information available with respect the offeror’s ability to enforce laws and regulations, correct deficiencies when non-compliant, and communicate laws and regulations to subcontractors.

(7) Safety. The Government will evaluate all information available with respect to the contractor’s safety program or efforts.

5.2.5 Failure to demonstrate the minimum acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

6. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB C—FACTOR 4 – KEY PERSONNEL.

6.1 SUBMISSION/MINIMUM REQUIREMENTS:

6.1.1 Each offeror shall provide resumes for the following Key Personnel proposed for this contract. Resumes shall not exceed five (5) pages per person. The proposed position of each person shall be clearly stated at the beginning of the resume.

CQC System Manager

The CQC System Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management with a minimum of 5 years construction experience on construction similar to this Contract or possess 10 year’s construction experience as a CQC on construction similar to this Contract. Construction similar to this contract is defined previously in paragraph 4.1.2.

For further information refer to:

3.4.2 CQC SYSTEM MANAGER

SECTION 01 45 00.00 10 QUALITY CONTROL

Project Superintendent The Project Superintendent shall have a minimum of 5 years of experience as a Project Superintendent.

Refer to:

3.1 GENERAL REQUIREMENTS

SECTION 01 45 00.00 10 QUALITY CONTROL

6.1.2 Sample suggested resume format is included with this RFP (Attachment 4). If offerors elect not to use the suggested resume format, all information identified on the sample format is still required for each resume submitted under this Factor. Proposals that fail to include resumes or that fail to include all required information on these resumes may be rejected as unacceptable.

6.1.3 The Key Personnel identified must be used on the project. No deviations will be permitted unless they meet the same qualifications and experience of those individuals proposed and are expressly approved by the Contracting Officer in advance. An offeror’s use of different personnel than those proposed without approval from the Contracting Officer will be grounds for a Termination for Default.

6.2 EVALUATION CRITERIA:

6.2.1 The Government will review the resumes provided in response to the Personnel Factor.

Offerors must demonstrate all of the following minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

6.2.2 The offeror must demonstrate in all resumes that the key personnel proposed have or exceed the minimum requirements of specialized and relevant experience as identified in paragraph 6.1.1 in the following roles: CQC System Manager, Project Superintendent.

6.2.3 Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

7. EVALUATION STANDARDS.

7.1 The Government will evaluate proposals using the Lowest Price Technically Acceptable Source Selection Process of FAR 15.101-2.

7.2 Proposals will be evaluated for acceptability, but not ranked using non-cost/price factors.

7.3 Tradeoffs will not be permitted.

7.4 Each evaluation factor and its risk rating combined will be determined and assigned using the adjectival and color descriptions contained herein. Upon assessment of each individual sub- factor and its risk rating, the appropriate overall rating for the technical proposal will be assigned using these acceptable and unacceptable (pass/fail) ratings as defined below:

Color Rating Description

Green Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Red Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

7.5 Upon assessment of past performance information, the appropriate overall rating for past performance will be assigned using these acceptable and unacceptable (pass/fail) ratings as defined below:

Color Rating Description

Green Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See Paragraph 7.6)

Red Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

7.6 In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a) (2) (iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”

7.7 To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and preclude award.

8. PROPOSAL EVALUATION

8.1 Proposals must meet all the criteria stated in this RFP in order to be eligible for award, to include responsiveness, technical acceptability, and responsibility. An unacceptable rating on any non-price factor will render a proposal ineligible for award.

8.2 The Government will evaluate each proposal independently from other proposals using only the RFP evaluation criteria.

9. EXCEPTIONS.

9.1 Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.

10. RESTRICTIONS.

10.1 Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.

11. Factor 1 - PRICE.

11.1 Price analysis will be performed to determine fairness and reasonableness as well as to assure an understanding of the work and ability to execute the contract at the price proposed. The evaluation will determine the extent to which the price proposal is realistic and consistent with the requirements of the RFP and reflect a clear understanding of the requirements, and are consistent with the information provided by the offeror.

Historical price information, competitive price information, the Independent Government Estimate (IGE), or any other pricing tool will be utilized as necessary in making this determination. Offerors are advised that any offer wherein pricing is deemed unbalanced or unreasonable, to include offers deemed to be unreasonably low, will be rendered ineligible for award. Additionally, all offers will be analyzed for unbalanced pricing.

Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation.

The otherwise technically-acceptable, lowest-priced offeror may be required to confirm its price on either a, CLIN, element, or total price basis, and/or provide additional information in support of their price, prior to contract award at the Government’s request and discretion.

12. BASIS FOR AWARD.

12.1 Award will be made on the basis of the lowest evaluated price of technically acceptable proposals meeting or exceeding the acceptability standards for non-cost factors.

12.2 The proposal that provides the lowest price and is otherwise technically acceptable in all factors will be selected for award.

CLAUSES INCORPORATED BY REFERENCE

52.203-18 Prohibition on Contracting With Entities That Require Certain

Internal Confidentiality Agreements or Statements-- Representation

JAN 2017

52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991

52.215-20 Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data

OCT 2010

52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.222-38 Compliance With Veterans' Employment Reporting

Requirements

FEB 2016

52.225-10 Alt I Notice of Buy American Requirement--Construction Materials (Feb 2009) Alternate I

MAY 2014

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.

(End of Provision)

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show--

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, or revision, of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.