Ditching_Cell1_LocMap_Fy19_Amdt0001.pdf
PDF 273 KB Posted
- Attached to
- EAGLE ISLAND IMPROVEMENTS Federal contract opportunity
- Solicitation number
- W912PM19B0001
About this file
REVISED PLAN SHEET
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1_-_IFB_Abstract19B0001_Eagle_Island_Contract.pdf | ||
| Bid_Opening_Sign-In_Sheet.pdf | ||
| A21_-_W912PM19B0001_Amendment_-0001.pdf | ||
| Eagle_Island_AdvPLANS_unlocked.pdf | ||
| A23_-_Site_Visit_Sign_In_Sheet.pdf | ||
| EagIeIsland_AdvSPECS.pdf | ||
| EagleIsland_AdvPLANS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
9.
8.
7.
6.
5.
4.
3.
2.
1.
TIME OF CONTRACT AWARD.
PERFORMANCE PERIOD IN A CONDITION EQUAL TO OR BETTER THAN THAT FOUND AT
CONTRACTOR SHALL MAINTAIN THE ACCESS ROADS THROUGHOUT THE CONTRACT
APPLICABLE BID ITEM.
SEEDING AND MULCHING SHALL BE CONSIDERED INCIDENTAL AND INCLUDED IN THE
IN ACCORDANCE WITH SECTION 32 92 19 OF THE SPECIFICATIONS. ALL COSTS FOR
ALL AREAS DISTURBED OUTSIDE OF CELLS 1 AND 2 SHALL BE SEEDED AND MULCHED
WITHIN 120 DAYS OF NTP.
WORK UNDER THIS CONTRACT AT CELL 2 IS TO BE PERFORMED FIRST AND COMPLETED
ALONG THE INSIDE TOE OF THE EXISTING CELL 2 WEST SIDE DIKE NEAR SPILLWAY NO.4
SIDES OF CELL 2. DIKE EMBANKMENT REPAIRS AND CONSTRUCTION OF A TOE BERM
TOE BERMS ALONG THE OUTSIDE TOE OF THE EXISTING DIKE ON THE EAST AND WEST
REQUIRE THE REPLACEMENT OF THE SPILLWAY SYSTEMS AND CONSTRUCTION OF
A FUTURE DISPOSAL AREA IMPROVEMENTS CONTRACT PROPOSED FOR CELL 2 WILL
IS ANTICIPATED TO OCCUR DURING THE PERIOD AUGUST 2019 THRU JANUARY 2020.
INCLUDE THE DISPOSAL OF DREDGED MATERIAL INTO THE CELL 3 DISPOSAL AREA
UNDER A SEPARATE CONTRACT, DREDGING AND DISPOSAL OPERATIONS WHICH WILL
SATISFACTION OF THE CONTRACTING OFFICER.
BE RESPONSIBLE FOR RESTORING ANY DAMAGE TO WETLANDS TO THE
TEMPORARILY, IN AREAS DEFINED AS WETLANDS. THE CONTRACTOR SHALL
NO FILL MATERIAL OF ANY KIND SHALL BE PLACED AT ANY TIME, INCLUDING
THE WETLANDS LOCATED OUTSIDE CELLS 1, 2 AND 3 ARE PROTECTED BY LAW.
SEE PLATE CN301 FOR CELL 1 AND CELL 2 DITCHING DETAILS.
VERTICAL DATUM NAVD 88.
HORIZONTAL DATUM NAD 1983(2011).
SPILLWAY NO. 8
SPILLWAY NO. 7
N 170,000 E 2,310,000
SPILLWAY NO. 2
SPILLWAY NO. 3
N 160,000 E 2,310,000
SPILLWAY NO. 1
HWY 421
TO US
N 175,000 E 2,315,000
& 421
U.S. 74, 76, BUS 17
MEMORIAL BRIDGE
CAPE FEAR
BRUNSWIC
K RI
VER
CELL NO. 1 DIKE
CELL NO. 3 DIKE
N
SPILLWAY NO. 9
SPILLWAY NO. 6
SPILLWAY NO. 5
SPILLWAY NO. 4
CELL NO. 2 DIKE
AUTHORITY DOCKS
N.C. STATE PORTS
REPAIR YARD
US ARMY ENGINEER
ACCESS ROAD
CELL 3
DISPOSAL AREA
EAGLE ISLAND
CELL 2
DISPOSAL AREA
EAGLE ISLAND
C R
O S
S D
IK
E
C R
O S S D
IK
E
- 3
CAPE FEAR RIVER
SCALE IN FEET
SCALE: 1" = 600'
600 600 900 1500
W I L M I N G T O N
D it c h in g C e ll1
L o c
M a p F y .d g n
WILMINGTON HARBOR NAVIGATION CHANNEL
CELL 1
DISPOSAL AREA
EAGLE ISLAND
GI02
L O
C A
T
IO
N M
A P
M
A R
A D
D E
D N
O T
E S A
N D
F
IL
E N
A M
E
W H
-0
-3
D R
A W
IN
G C
O D
E
D R
A W
N B
Y
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
"x
S
IZ
E
F E
B R
U A
R Y
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A
D
A R
L
IN
G T
O N A
V E
N U
E W
IL
M
IN
G T
O N D
IS
T R
IC
T U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
B R
U N
S W
IC
K C
O U
N T
Y
N O
R T
H C
A R
O L
IN
A D
IS
P O
S A
L A
R E
A C
E L L A
N D C
E L L D
IT
C H
IN
G F
Y E
A G
L E I S
L A
N D
W P
M
B
J
H A
R G
R O
V E
E
D U
N L
O P
L
B O
W L E
S -E
A R
L Y
L
B O
W L E
S -E
A R
L Y
File details come from the government source that posted it.