W912PM-17-B-0011_Amend_0001_SF-30.pdf

PDF 11 MB Posted

Attached to
Renovation of Building Federal contract opportunity
Solicitation number
W912PM-17-B-0011
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Amendment 0001 - SF 30

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912PM-17-B-0011 is hereby amended for the follow ing reasons:

A) See technical Summary of Changes.

B) See Bid Schedule Note #5 addition Re: Options 1 and 2 C) the date and time for receipt of bids is not extended.

D) All other terms, provisions, and conditions of the solicitation remain unchanged.

///////////////////////////////////////////////LAST ITEMS////////////////////////////////////////////////////////////////

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-17-B-0011

X 9B. DATED (SEE ITEM 11)

12-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Jun-2017

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-17-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The standard size code $33,500,000 has been added.

The following have been modified:

SUBTOTALS AND NOTES

TOTAL BASE BID (CLINS 001-0002) _______________________

BID OPTION 1 (CLIN 0003) ----------------------------------------

BID OPTION 2 (CLIN 0004) ---------------------------------------

BID OPTION 3 (CLIN 0005) --------------------------------------

TOTAL BASE BID PLUS OPTIONS -------------------------------------

NOTE 1:

FOR ALL OPTIONAL BID ITEMS, IF EXERCISED, THE PERIOD OF PERFORMANCE SHALL NOT

BE EXTENDED BEYOND THE ORIGINAL CONTRACT DURATION OF 365 DAYS. PERFORMANCE

OF AN AWARDED OPTIONAL BID ITEM SHALL RUN CONCURRANTLY WITH THE BASE BID

CONTRACT DURATION SO THAT THE PERIOD OF PERFORMANCE SHALL NOT EXCEED 365

CALENDAR DAYS.

NOTE 2:

THE EXERCISE OF OPTIONAL BID ITEMS SHALL BE SUBJECT OT THE AVAILABILITY OF

FUNDS.

NOTE 3:

THE TOTAL CONTRACT DURATION SHALL NOT EXCEED 365 CALENDAR DAYS.

NOTE 4:

OPTIONAL BID ITEMS, IF EXERCISED, WILL BE EXERCISED AT TIME OF AWARD.

NOTE 5:

BID OPTION 2 WILL NOT BE AWARDED IF BID OPTION 1 IS NOT AWARDED.

(End of Summary of Changes)

Building 3-2847 Amendment 0001

Technical Summary of Changes

SPECIFICATIONS

a. The revised Table of Contents (Page 2) and Sections listed below (revised by Amendment No. 0001) are hereby added to and made a part of the solicitation.

TABLE OF CONTENTS (Page 2)

01 00 05 GENERAL AND SPECIAL PROVISIONS

01 33 00 ATTACHMENT 1 – ENG 4288 (Page 1 thru Page 20)

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

08 34 97 SCIF DOOR ASSEMBLIES

08 71 00 DOOR HARDWARE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

22 07 19.00 40 PLUMBING PIPING INSULATION

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND

EXHAUST SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

b. The following Section has been deleted

12 21 00 WINDOW BLINDS

c. The following Appendices are hereby added to and made a part of the solicitation.

APPENDIX A - ASBESTOS SURVEY

APPENDIX B - GFCI EQUIPMENT DATA

NOTE:

Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1(beginning and ending of revision/addition).

The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.

Building 3-2847 Amendment 0001

DRAWINGS

The following drawings have been revised:

LS101 Fire Extinguisher locations have been added AD101 Existing elect. Manhole to be demolished; clarification on floor finish replacement (105A) AE101 Fire Extinguisher locations have been added; Conc. floor infill AE201 Detail 6/AE201 AE601 Door schedule – hardware schedule updated AF601 Finish schedule updated MH101 Key Note 4 updated P-701 Plumbing Insulation Schedule updated EY101 Key note 6 added

-- End of Summary of Changes- -

Encls As Stated

Building 3-2847 Reconfiguration, JSOC W912PM-17-B-0011

SC-00009-17

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 34 97 SCIF DOOR ASSEMBLIES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 PORTLAND-CEMENT PLASTER

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC AND QUARRY TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 21 - FIRE SUPPRESSION

21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

Volume 2 OF 2

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19.00 40 PLUMBING PIPING INSULATION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 01 30.41 HVAC SYSTEM CLEANING

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

PROJECT TABLE OF CONTENTS Page 2 Revised by Amendment 0001

K7EPEOAF

Cross-Out

Building 3-2847 Reconfiguration, JSOC 2912PM-17-B-0011

SECTION 01 00 05

GENERAL AND SPECIAL PROVISIONS

02/04

PART 1 GENERAL

1.1 SCOPE OF WORK

The work consists of furnishing all labor, equipment, transportation, and materials necessary to perform all work in strict accordance with these specifications, schedules, Drawings, and other contract documents. The scope of work of this contract includes, but is not limited to, the following specific items of work:

****Amendment 0001****

1.2 STRUCTURAL / ARCHITECTURAL WORK

Structural work consists of removal and replacement of the existing building slab within existing spaces 103 and 103A on the first floor of Building 3-2847. All work shall be in accordance with the contract drawings.

Architectural work consists of renovation on two floors in Building 3-2847 to include partial demolition of masonry walls, steel stud partitions, interior doors, suspended ceilings and construction of steel stud partitions, interior and exterior doors, suspended acoustical ceilings and restoration of interior finishes. Coordination of government furnished equipment and furniture is required. Spaces 112, 113, and 115 are not included in the Base Bid. All utility connections including fire protection, water supply, waste water and vents, power and communications will be made within the building and no exterior utility lines are proposed. All work shall be in accordance with the contract drawings.

Bid Option 1 Structural work consists of removal and replacement of the existing building slab within existing space 110 to accommodate infrastructure supporting new spaces 114 and 113 on the first floor of Building 3-2847.

All work shall be in accordance with the contract drawings.

Architectural work consists of construction of spaces 114 and 113 on the first floor of Building 3-2847. Work includes construction of interior steel stud partitions, interior doors, suspended acoustical ceilings and restoration of interior finishes. Installation of government furnished equipment is required. All work shall be in accordance with the contract drawings.

Bid Option 2 Structural work consists of removal and replacement of the existing building slab within existing space 110 to accommodate infrastructure supporting new space 112 on the first floor of Building 3-2847. All work shall be in accordance with the contract drawings.

Architectural work consists of construction of space 112 on the first floor of Building 3-2847. Work includes construction of steel stud partitions, interior doors, plaster ceilings and restoration of interior

SECTION 01 00 05 Page 1 (Revised by Amendment 0001) finishes. Installation of government furnished equipment is required. All work shall be in accordance with the contract drawings.

Bid Option 3 Architectural work consists of removal and replacement of existing ceiling finishes associated with mechanical system work within the latrines located on the second floor of building 3-2847. Work also includes repainting of all work areas on the second floor. All work shall be in accordance with the contract drawings.

****Amendment 0001****

1.3 MECHANICAL WORK

Mechanical work consists of partial demolition of the system HVAC systems and installation of new ductwork and equipment as shown in the contract drawings. New mechanical work associated with spaces 112, 113, and 115 is not included in the Base Bid. All utility connections including fire protection, water supply, waste water and vents, power and communications will be made within the building and no exterior utility lines are proposed.

Bid Option 1 Mechanical work consists of installation of new ductwork and equipment within spaces 114 and 113 on the first floor of Building 3-2847. All work shall be in accordance with the contract drawings.

Bid Option 2 Mechanical work consists of installation of new ductwork and equipment within spaces 112 on the first floor of Building 3-2847. All work shall be in accordance with the contract drawings.

Bid Option 3 Mechanical work consists of partial demolition of the system HVAC systems and installation of new ductwork and equipment within spaces 205 and 207 located on the second floor of Building 3-2847 as shown in the contract drawings.

1.4 PLUMBING/FIRE PROTECTION WORK

Plumbing work consists of removal of existing fixtures and waste & supply lines within existing latrines and installation of new fixtures and waste & supply lines to serve new latrines and laundry. All work shall be in accordance with the contract drawings.

Bid Option 1 Plumbing work includes minor connections associated with installation of a Government Furnished / Contractor Installed float tank and associated equipment and floor drains within spaces 113 and 114 on the first floor of Building 3-2847. All work shall be in accordance with the contract drawings.

Bid Option 2 Plumbing work includes minor connections associated with installation of Government Furnished / Contractor Installed hot and cold plunge pools and installation of trench drains and associated piping within space 112 on the first floor of Building 3-2847. All work shall be in accordance with the contract drawings.

SECTION 01 00 05 Page 2

Fire protection work within the Base Bid consists of reworking the existing sprinkler system as required to serve the renovated spaces. All areas shall be as noted in the contract drawings. Project will also include installation of fire alarm and mass notification system. All utility connections including fire protection, water supply, waste water and vents, power and communications will be made within the building and no exterior utility lines are proposed. All work shall be in accordance with the contract drawings.

Bid Option 1 Fire Protection work includes extension of the existing sprinkler system to serve spaces 113 and 114 on the first floor of Building 3-2847. All areas shall be as noted in the contract drawings.

Bid Option 2 Fire Protection work includes extension of the existing sprinkler system to serve space 112 on the first floor of Building 3-2847. All areas shall be as noted in the contract drawings.

1.5 ELECTRICAL/TELECOMMUNICATIONS WORK

Electrical work includes removal of existing lighting and LED the installation of new lighting within the building. Work will include fixtures, circuits, switches and other appurtenances as shown on the drawings. Electrical work also includes installation of a partial electrical distribution system within the renovated spaces. Work will also include providing and installing overhead raceways for control and power wiring, as shown on the drawings. Work will include receptacles, circuits, disconnects, starters, panelboards, security infrastructure and other appurtenances as shown on the drawings. New electrical work associated with spaces 112, 113, and 114 is not included in the Base Bid.

Telecommunications work will include installation of new telecommunication devices, work within existing telecomm rooms and, all the horizontal cabling and outlets in the renovated spaces. As shown on the contract drawings. Electrical work shall conform to the National Electrical Code and all applicable UFC codes.

Bid Option 1 Electrical and telecommunictions work includes installation of power, lighting, fire alarm, and mass notification to serve spaces 113 and 114 on the first floor of Building 3-2847. All areas shall be as noted in the contract drawings.

Bid Option 2 Electrical and telecommunications work includes installation of power, fire alarm and mass notification and lighting to serve space 112 on the first floor of Building 3-2847. All areas shall be as noted in the contract drawings.

Bid Option 3 Electrical work includes work associated with mechanical system work within spaces 205 and 207 on the second floor of Building 3-2847. All areas shall be as noted in the contract drawings.

SECTION 01 00 05 Page 3

PART 2 PROJECT REQUIREMENTS:

2.1 Certificates of Compliance and Material Submittals

The Contractor shall submit for approval all certificates of compliance and material submittals required in these technical provisions. Required submittals shall be submitted for approval not later than 30 days prior to the approval date needed to achieve compliance with the approved project schedule. Approval must be received from the Contracting Officer or his representative before incorporating the materials into the work. The Contractor shall provide a Submittal Register listing all required submittals in the contract to the COR at the time of the first submittal.

Submittal forms (Form 59-2-R) and a sample Submittal Register (Form 4288) will be provided at the Prework Conference.

2.2 Safety and Environmental Plans

The Contractor shall submit a safety plan in accordance with the current Corps of Engineers Safety Manual, EM-385-1-1, and shall submit an environmental protection plan in accordance with specifications Section 01 57 19 , Temporary Environmental Controls, if included in these technical provisions. A sample safety plan form will be provided at the Preconstruction Conference.

2.3 Quality Control

The Contractor shall provide the job superintendent's name and telephone number to the JSOC FM Project Manager or other Government designated representative; prior to commencement of work. The Contractor shall furnish a daily Contractor Quality Control (CQC)/Superintendent's work report to the Contracting Officer's Representative (COR). A sample CQC report form will be provided at the Preconstruction Conference.

2.4 Excavation Permit

The Contractor shall have a completed and approved DPW Excavation Permit in his possession prior to any excavation, to include sign or fence-post holes. The Contractor shall schedule an appointment to locate utility lines at least 10 working days prior to any excavation with the DPW Operations and Maintenance Division (OMD), Building 251 Pope Field. This will be accomplished by submitting a Facilities Maintenance Division Service Order. Service Orders are obtained by calling (910) 396-0321.

Service Order status can also be checked on-line at the same web address.

A copy of the DPW Excavation Permit form will be provided at the Prework Conference. The Contractor shall be responsible for coordination with the Network Enterprise Center (NEC), Outside Plant Branch; building 1-1434, Scott Street; (910) 396-8200, for locating government-owned communication lines prior to any excavation. The Contractor shall also be responsible for coordination with any known or suspected non-governmental utilities such as Sprint telecommunications or cable television.

2.5 Disposal and Borrow Permits

2.5.1 Disposal Permits

A Landfill Usage Permit, for contractors, shall be obtained from the Directorate of Public Works, Environmental Compliance Branch, Solid Waste/Recycling Program at BLDG 3-1137, (910) 432-6412.

SECTION 01 00 05 Page 4

Contact your Government Representative or the Solid Waste/Recycling Program at (910) 977-2502, (910) 396-3372 or (910) 432-6412 for additional guidance.

State Law and Fort Bragg regulations requires covering of loads of waste or recyclables to prevent litter.

All waste or recyclable material loads are subject to be inspected of their contents while being present on Fort Bragg.

2.6 Haul Routes

The Contractor is required to use the haul routes shown on the contract drawings for transportation of construction debris or demolition materials unless otherwise permitted in writing by the COR. When haul routes are not designated in the contract, the Contractor must obtain approval from the COR for the routes he intends to use. The axle load of earth-hauling equipment operating on paved streets shall not exceed 12,000 pounds.

2.7 Utility Outages and Road Closures

Utility, road, and railroad closures require minimum 10 working days advance written notice and will be subject to COR approval. A sample utility outage/road closure request form will be provided at the Prework Conference.

Utility outages will be held on normal work days, after hours or on weekend/holidays as coordinated with the Contracting Officer, Ft. Bragg DPW and the utility provider. The decision on when to have an outage (normal work hours, weekend, etc) will be based on the length of the outage and the normal business hours/hours of maximum usage for the facilities affected by the outage. Outages will be limited to a duration of 4 hours unless extenuating circumstances dictate otherwise.

In the case of road closures, a sketch shall be provided showing the closure location and all necessary signs and barricades. Necessary signage, barricades, flagpersons, lights (including temporary traffic control lights), and markings for the safe movement of the public during construction shall be in accordance with the Manual on Uniform Traffic Control Devices, and shall be provided at no additional expense to the Government.

2.8 Availability and Use of Utility Services

2.8.1 Payment for Utility Services

The Government will make all reasonably required utilities available to the Contractor from existing outlets and supplies, as specified in the contract.

2.8.2 Payment for Utility Services

The Government will make all reasonably required utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to and paid for by the Contractor at the prevailing rates. The Contractor shall carefully conserve all utilities furnished.

SECTION 01 00 05 Page 5

2.8.3 Meters and Temporary Connections

The Contractor, at its expense and in a manner satisfactory to the Contracting Officer, shall provide and maintain necessary temporary connections, distribution lines, and meters required to measure the amount of each utility used for the purpose of determining charges. The Contractor shall notify the Contracting Officer's Representative, in writing, no less than 10 working days before the temporary connection is made. The Contracting Officers Representative will then provide the contractor with the name and phone number of the utility provider. The contractor will be responsible for contacting the utility provider and making arrangements for connections and billing. For temporary electrical connections the Government or applicable utility provider will provide the meter (meter base provided by contractor) and make the final hot connection after inspection and approval of the Contractor's temporary wiring installation. The Contractor shall not make the final electrical connection. For temporary water and sewer connections the contractor will provide the meter and after inspection/approval by the Contracting Officer's Representative make the final connection at the contractor's expense.

2.8.4 Use of Permanent Building Utility Connections

Utilities consumed by the contractor from permanent building utility connections shall also be metered and paid for by the contractor. When the permanent system is activated the initial meter reading shall be recorded and reported as specified below. On building renovation projects the initial meter reading shall be recorded when the contractor is given possession of the building to perform the work. The contractor shall pay for utilities consumed through the permanent building connection until the work has been completed or the government has occupied the facility, which ever occurs first.

2.8.5 Initial Meter Readings

Upon installation of the meter, the initial reading shall be recorded (in the presence of the Contracting Officer's Representative) and forwarded to the point of contact for utility service with a copy to the Contracting Officer's Representative.

2.8.6 Final Meter Reading

Before completion of the work and final acceptance of the work by the Government, the Contractor shall notify the Contracting Officer and the applicable utility provider, in writing, 10 working days before termination is desired. The Government or applicable utility provider will take a final meter reading. Electric service will be disconnected by the provider. Water and sewer connections will be disconnected by the contractor, at his expenses and by a method approved by the Contracting Officer's Representative. The Contractor shall then remove all the temporary distribution lines, meters, meter bases, and associated paraphernalia. The Contractor shall pay all outstanding utility bills before final acceptance of the work by the Government. Rates are subject to change.

2.8.7 Utilities Charge Rates

Water ------------ $10.24771 per 1,000 gallons Electricity ------ $0.8665 per KW hour

SECTION 01 00 05 Page 6

Wastewater ------------ $9.48996 per 1,000 gallons

Rates are subject to change. Contact utility providers for trailers utility connection requirements.

2.9 As-Built Record Drawings

The Contractor shall be responsible for maintaining one set of master prints at the job-site on which he shall keep a careful and neat record of all deviations from the original contract drawings as the work progresses. The Contractor shall note all changes and corrections on these record drawings promptly as the changes occur, but in no case less often than a weekly basis. In addition to incorporated modifications, these record drawings shall also include the actual location of all subsurface utility lines installed or encountered, and the type of materials used.Contractor will receive a copy of the contract documents in an electronic format (CD) at the time of award, the Contractor shall be responsible for transferring any as-built changes and plan sheet annotations described above onto the electronic format documents. The marked-up/annotated prints, or the annotated electronic drawings if applicable, shall be certified as to their correctness by an authorized representative of the Contractor and turned-over to the COR not later than 10 days after acceptance of the work by the Government.

2.10 COLOR BOARDS

Omitted.

PART 3 SPECIAL PROVISIONS:

3.1 Occupancy

The facility will be occupied during the work, but the actual renovation areas will be unoccupied during accomplishment of the work. The Contractor shall provide not less than 10 days prior notice to the COR to allow evacuation of the affected area(s). The Contractor is responsible for providing such covering, shields, and barricades as are required to protect the facility occupants, furniture, equipment, supplies, etc., from dust, debris, weather intrusion, or other cause of damage resulting from construction.

3.2 Contractor Vehicle/Equipment Access to Fort Bragg

Fort Bragg is a closed installation, and vehicular access is controlled.

Contractors are required to register each vehicle that will be traveling installation roads or streets under its own power. Registration may be accomplished at the Main Vehicle Registration Center, building 8-1078 on Randolph Street near Bragg Boulevard, 0800-1700 hours Monday through Friday. Unregistered vehicles should expect to be stopped and delayed at all access control points. Contractors and all commercially registered vehicles shall use the Knox Street access control point off Bragg Boulevard for all access to Fort Bragg. JSOC has its own security standards as detailed in section 01 00 60. Contractor personnel must wear government identification which shall be visible at all times.

SECTION 01 00 05 Page 7

3.3 Special Work Constraints

3.3.1 Time Constraints

All work will be performed during the hours of 0730 AM to 1600 PM

3.3.2 Special Access Requirements

The project site is located inside a secure compound. See Section 01 00 60

JSOC SECURITY.

3.3.3 Special Coordination Requirements

Examine electrical work shall be coordinated with Sandhills Utilities.

Exterior water and sewer utilities shall be coordinated with Old North Utilities Services (ONUS). All utilities work shall be coordinated with Contracting Officer, Fort Bragg DPW, and the utility provider.

-- End of Section --

SECTION 01 00 05 Page 8

SUBMITTAL REGISTER (ER 415-1-10)

TITLE AND LOCATION DATE

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

SECTION - 01 00 60 JSOC SECURITY

1 01 00 60 2.2.2 Security Briefing PRECON SUBMTL FIO

2 01 00 60 2.3 Appoint CSO PRECON SUBMTL FIO

3 01 00 60 2.3 CSO Appointment Letter PRODUCT DATA FIO

SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

1 01 10 00.10 38 1.10 List of Subcontractors PRECON SUBMTL FIO

2 01 10 00.10 38 Progress Chart PRECON SUBMTL GA

3 01 10 00.10 38 1.10 Contractor Quality Control (CQC) Plan PRECON SUBMTL GA

4 01 10 00.10 38 1.10 Certificate of Insurance PRECON SUBMTL FIO

5 01 10 00.10 38 WORK PLAN PRODUCT DATA FIO

6 01 10 00.10 38 PROGRESS SCHEDULE PRODUCT DATA FIO

7 01 10 00.10 38 1.10 Completion of Corps CQC Course CERTIFICATES FIO

8 01 10 00.10 38 1.10 Letter Appointing Superintendent CERTIFICATES FIO

9 01 10 00.10 38 1.9 testing laboratory CERTIFICATES GA

10 01 10 00.10 38 1.9 testing laboratory CERTIFICATES GA

SECTION - 01 14 00 WORK RESTRICTIONS

1 01 14 00 1.3.1.1 List of Contact Personnel PRECON SUBMTL FIO

SECTION - 01 32 01.00 10 PROJECT SCHEDULE

1 01 32 01.00 10 1.3 Project Scheduler Qualifications PRECON SUBMTL GA

2 01 32 01.00 10 3.4.1 Preliminary Project Schedule PRECON SUBMTL GA

3 01 32 01.00 10 3.4.2 Initial Project Schedule PRECON SUBMTL GA

4 01 32 01.00 10 3.6.2 Periodic Schedule Update PRECON SUBMTL GA

SECTION - 01 33 00 SUBMITTAL PROCEDURES

1 01 33 00 1.8 Submittal Register PRECON SUBMTL GA

SECTION - 01 33 29 LEED(TM) DOCUMENTATION

1 01 33 29 1.5.3.1 Preliminary Sustainability Notebook PRECON SUBMTL GA

2 01 33 29 1.5.3.1 Preliminary High Performance and Sustain PRECON SUBMTL FIO

3 01 33 29 1.5.3.1 Final Sustainability Notebook CLOSEOUT SUBMTL GA

4 01 33 29 1.5.3.1 Final High Performance and Sustainable B CLOSEOUT SUBMTL GA

SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1 01 35 26 1.7 Accident Prevention Plan (APP) PRECON SUBMTL GA

2 01 35 26 1.4 Monthly Exposure Reports TEST REPORTS FIO

3 01 35 26 1.12 Notifications and Reports TEST REPORTS FIO

4 01 35 26 1.12.2 Accident Reports TEST REPORTS GA

5 01 35 26 1.12.3 LHE Inspection Reports TEST REPORTS FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

6 01 35 26 1.6.1.4 Crane Operators/Riggers CERTIFICATES FIO

7 01 35 26 1.7.2.2 Standard Lift Plan CERTIFICATES GA

8 01 35 26 1.7.2.3 Critical Lift Plan CERTIFICATES GA

9 01 35 26 1.8 Activity Hazard Analysis (AHA) CERTIFICATES FIO

10 01 35 26 1.9.1 Confined Space Entry Permit CERTIFICATES FIO

11 01 35 26 1.9.1 Hot Work Permit CERTIFICATES FIO

12 01 35 26 1.12.4 Certificate of Compliance CERTIFICATES FIO

SECTION - 01 45 00.00 10 QUALITY CONTROL

1 01 45 00.00 10 3.2 Contractor Quality Control (CQC) Plan PRECON SUBMTL GA

2 01 45 00.00 10 3.9 Verification Statement TEST REPORTS FIO

SECTION - 01 50 00 Temporary Construction Facilities And Controls

1 01 50 00 1.3 Construction Site Plan PRECON SUBMTL FIO

2 01 50 00 3.4.1 Traffic Control Plan PRECON SUBMTL FIO

SECTION - 01 57 19 Temporary Environmental Controls

1 01 57 19 1.5.1 Preconstruction Survey PRECON SUBMTL FIO

2 01 57 19 1.8 Solid Waste Management Permit PRECON SUBMTL GA

3 01 57 19 1.5.2 Regulatory Notifications PRECON SUBMTL GA

4 01 57 19 1.6 Environmental Protection Plan PRECON SUBMTL GA

5 01 57 19 1.6.9.1 Dirt and Dust Control Plan PRECON SUBMTL GA

6 01 57 19 1.5.4 Employee Training Records PRECON SUBMTL GA

7 01 57 19 1.5.4 Employee Training Records CERTIFICATES FIO

8 01 57 19 3.7.1 Waste Determination Documentation CLOSEOUT SUBMTL FIO

9 01 57 19 3.7.2.6 Disposal Documentation for Hazardous and CLOSEOUT SUBMTL FIO

10 01 57 19 1.5.4 Assembled Employee Training Records CLOSEOUT SUBMTL GA

11 01 57 19 1.8 Solid Waste Management Permit CLOSEOUT SUBMTL GA

12 01 57 19 3.7.2.1 Hazardous Waste/Debris Management CLOSEOUT SUBMTL GA

13 01 57 19 1.5.2 Regulatory Notifications CLOSEOUT SUBMTL GA

SECTION - 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

1 01 74 19 1.6 Waste Management Plan PRECON SUBMTL GA

2 01 74 19 1.7 Records CLOSEOUT SUBMTL FIO

SECTION - 01 78 00 CLOSEOUT SUBMITTALS

1 01 78 00 1.7.1 Warranty Management Plan PRODUCT DATA FIO

2 01 78 00 1.7.5 Warranty Tags PRODUCT DATA FIO

3 01 78 00 1.5 Spare Parts Data PRODUCT DATA FIO

4 01 78 00 1.7.1 Instructions MFRS INSTR FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

5 01 78 00 3.6 Operation and Maintenance Manuals O&M DATA GA

6 01 78 00 3.3 Record Drawings CLOSEOUT SUBMTL GA

7 01 78 00 2.3 Certification of EPA Designated Items CLOSEOUT SUBMTL GA

8 01 78 00 3.8 Interim DD FORM 1354 CLOSEOUT SUBMTL GA

9 01 78 00 3.8 Checklist for DD FORM 1354 CLOSEOUT SUBMTL GA

SECTION - 02 41 00 DEMOLITION]

1 02 41 00 1.2.1 Demolition Plan PRECON SUBMTL GA

2 02 41 00 1.9 Existing Conditions PRECON SUBMTL FIO

3 02 41 00 1.6 Notification CERTIFICATES GA

4 02 41 00 3.2.3 Receipts CLOSEOUT SUBMTL FIO

SECTION - 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

1 03 30 53 2.3 Mix Design Data PRODUCT DATA GA

2 03 30 53 2.3 Ready-Mix Concrete PRODUCT DATA FIO

3 03 30 53 2.4.1 Curing Compound PRODUCT DATA FIO

4 03 30 53 3.8.3 Compressive Strength Testing TEST REPORTS GA

SECTION - 05 12 00 STRUCTURAL STEEL

1 05 12 00 1.4.2 Fabrication Drawings SHOP DRAWINGS GA

2 05 12 00 2.6.2 Shop Primer PRODUCT DATA FIO

3 05 12 00 2.4.1 Welding Electrodes and Rods PRODUCT DATA FIO

4 05 12 00 2.6.2 Class B Coating TEST REPORTS FIO

5 05 12 00 2.3 Bolts, Nuts, and Washers TEST REPORTS FIO

6 05 12 00 2.2 Steel CERTIFICATES FIO

7 05 12 00 2.3 Bolts, Nuts, and Washers CERTIFICATES FIO

8 05 12 00 1.3 AISC Fabrication Plant Quality Certifica CERTIFICATES FIO

SECTION - 05 30 00 STEEL DECKS

1 05 30 00 1.3.5 Fabrication Drawings SHOP DRAWINGS GA

2 05 30 00 2.2 Accessories PRODUCT DATA FIO

3 05 30 00 2.1 Deck Units PRODUCT DATA FIO

4 05 30 00 2.1 Deck Units DESIGN DATA GA

SECTION - 06 10 00 ROUGH CARPENTRY

1 06 10 00 1.4.3 Preservative-treated TEST REPORTS FIO

2 06 10 00 1.7 Preservative Treatment CERTIFICATES FIO

3 06 10 00 3.3 Take-back Program O&M DATA FIO

SECTION - 06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

1 06 41 16.00 10 2.5 Shop Drawings SHOP DRAWINGS GA

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

2 06 41 16.00 10 3.1 Installation SHOP DRAWINGS GA

3 06 41 16.00 10 2.1 Wood Materials PRODUCT DATA FIO

4 06 41 16.00 10 1.5.2 Certification PRODUCT DATA FIO

5 06 41 16.00 10 2.2 Plastic Laminates SAMPLES GA

6 06 41 16.00 10 1.5 Quality Assurance CERTIFICATES FIO

7 06 41 16.00 10 3.1 Laminate Clad Casework CERTIFICATES FIO

8 06 41 16.00 10 1.3 LEED Documentation CLOSEOUT SUBMTL FIO

SECTION - 06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

1 06 61 16 3.1 Installation SHOP DRAWINGS GA

2 06 61 16 2.1 Solid Polymer Material PRODUCT DATA FIO

3 06 61 16 1.5.1 Qualifications PRODUCT DATA FIO

4 06 61 16 2.3 Fabrications PRODUCT DATA FIO

5 06 61 16 1.5.2 Certification PRODUCT DATA FIO

6 06 61 16 1.5.2 VOC Content PRODUCT DATA FIO

7 06 61 16 2.1 Material SAMPLES GA

8 06 61 16 2.1 Solid Polymer Material TEST REPORTS FIO

9 06 61 16 2.3 Fabrications CERTIFICATES FIO

10 06 61 16 1.5.1 Qualifications CERTIFICATES FIO

11 06 61 16 3.2 Clean-up O&M DATA FIO

12 06 61 16 1.3 LEED Documentation CLOSEOUT SUBMTL FIO

SECTION - 07 21 16 MINERAL FIBER BLANKET INSULATION

1 07 21 16 2.2 Acoustic Batt Insulation PRODUCT DATA GA

2 07 21 16 2.2 Acoustic Batt Insulation MFRS INSTR FIO

3 07 21 16 2.1.1 Recycled Content for Insulation Material CLOSEOUT SUBMTL FIO

4 07 21 16 2.1.2 Reduce Volatile Organic Compounds (VOC) CLOSEOUT SUBMTL FIO

SECTION - 07 92 00 JOINT SEALANTS

1 07 92 00 2.2 Sealants PRODUCT DATA GA

2 07 92 00 2.3 Primers PRODUCT DATA GA

3 07 92 00 2.4 Bond Breakers PRODUCT DATA GA

4 07 92 00 2.5 Backstops PRODUCT DATA GA

5 07 92 00 1.4.1 Indoor Air Quality CERTIFICATES GA

6 07 92 00 2.2.1 Indoor Air Quality For Interior Sealants CLOSEOUT SUBMTL FIO

7 07 92 00 2.2.2 Indoor Air Quality For Interior Acoustic CLOSEOUT SUBMTL FIO

8 07 92 00 2.6 Indoor Air Quality For Interior Caulking CLOSEOUT SUBMTL FIO

SECTION - 08 11 13 STEEL DOORS AND FRAMES

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

1 08 11 13 2.1 Doors SHOP DRAWINGS GA

2 08 11 13 2.1 Doors SHOP DRAWINGS GA

3 08 11 13 2.3 Frames SHOP DRAWINGS GA

4 08 11 13 2.3 Frames SHOP DRAWINGS GA

5 08 11 13 2.1 Doors PRODUCT DATA GA

6 08 11 13 2.3 Frames PRODUCT DATA GA

SECTION - 08 11 16 ALUMINUM DOORS AND FRAMES

1 08 11 16 1.4.1 Doors and frames SHOP DRAWINGS GA

2 08 11 16 2.1 Doors and frames SHOP DRAWINGS GA

3 08 11 16 1.4.1 Doors and frames MFRS INSTR FIO

4 08 11 16 2.1 Doors and frames MFRS INSTR FIO

SECTION - 08 14 00 WOOD DOORS

1 08 14 00 2.2 Doors SHOP DRAWINGS GA

2 08 14 00 2.2 Doors PRODUCT DATA GA

3 08 14 00 2.3 Accessories PRODUCT DATA FIO

4 08 14 00 1.5 Warranty PRODUCT DATA FIO

5 08 14 00 2.2 Doors SAMPLES GA

6 08 14 00 1.3.1 Certificates of Grade CERTIFICATES FIO

7 08 14 00 1.3.2 Certified Sustainably Harvested Wood CERTIFICATES GA

8 08 14 00 1.3.3 Indoor Air Quality CERTIFICATES GA

9 08 14 00 2.2.1 Certified Sustainably Harvested Flush Wo CLOSEOUT SUBMTL FIO

10 08 14 00 2.2.1.1 Recycled Content for Door Cores CLOSEOUT SUBMTL FIO

11 08 14 00 2.2.1.1 Indoor Air Quality for Particleboard and CLOSEOUT SUBMTL FIO

12 08 14 00 1.5 Warranty CLOSEOUT SUBMTL FIO

SECTION - 08 34 97 SCIF DOOR ASSEMBLIES

1 08 34 97 2.2 Sound Retardant SCIF Door Assemblies SHOP DRAWINGS GA

2 08 34 97 2.2 Sound Retardant SCIF Door Assemblies PRODUCT DATA GA

3 08 34 97 1.6 Warranty PRODUCT DATA FIO

4 08 34 97 2.2.1.1 Sound Transmission Class Rating PRODUCT DATA GA

5 08 34 97 2.2.3.2 Factory Finish SAMPLES GA

6 08 34 97 2.5.3 Acoustical Tests TEST REPORTS FIO

7 08 34 97 2.2 Sound Retardant SCIF Door Assemblies CERTIFICATES FIO

8 08 34 97 2.3.1 Recycled Content for Door Cores CLOSEOUT SUBMTL FIO

9 08 34 97 1.6 Warranty CLOSEOUT SUBMTL FIO

SECTION - 08 71 00 DOOR HARDWARE

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

1 08 71 00 1.3 Manufacturer's Detail Drawings SHOP DRAWINGS GA

2 08 71 00 1.3 Verification of Existing Conditions SHOP DRAWINGS GA

3 08 71 00 1.5 Hardware Schedule SHOP DRAWINGS GA

4 08 71 00 2.3.4 Keying System SHOP DRAWINGS GA

5 08 71 00 2.3 Hardware Items PRODUCT DATA GA

6 08 71 00 3.1 Installation MFRS INSTR FIO

7 08 71 00 1.5 Hardware Schedule O&M DATA GA

8 08 71 00 1.6.1 Key Bitting CLOSEOUT SUBMTL FIO

SECTION - 08 81 00 GLAZING

1 08 81 00 2.2 Setting and Sealing Materials MFRS INSTR FIO

2 08 81 00 3.2 Glass Setting MFRS INSTR FIO

SECTION - 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

1 09 22 00 2.1 Metal support systems SHOP DRAWINGS GA

SECTION - 09 24 23 STUCCO

1 09 24 23 3.2 Lath SHOP DRAWINGS FIO

2 09 24 23 3.4 Proportions and Mixing PRODUCT DATA FIO

3 09 24 23 1.3 Sample Panel SAMPLES GA

SECTION - 09 29 00 GYPSUM BOARD

1 09 29 00 2.2.3 Cementitious Backer Units PRODUCT DATA FIO

2 09 29 00 2.2.2 Abuse Resistant Gypsum Board PRODUCT DATA FIO

3 09 29 00 2.2.1 Gypsum Board PRODUCT DATA FIO

4 09 29 00 2.2 Asbestos Free Materials CERTIFICATES GA

5 09 29 00 1.3.1 Indoor Air Quality CERTIFICATES GA

6 09 29 00 2.2.1 Recycled Content for Gypsum Board CLOSEOUT SUBMTL FIO

7 09 29 00 2.2.1 Recycled Content for Paper Facing and Gy CLOSEOUT SUBMTL FIO

8 09 29 00 2.2.1 Indoor Air Quality for Gypsum Board CLOSEOUT SUBMTL FIO

9 09 29 00 2.2.4 VOC Content of Joint Compound CLOSEOUT SUBMTL FIO

SECTION - 09 30 10 CERAMIC AND QUARRY TILING

1 09 30 10 3.2 Detail Drawings SHOP DRAWINGS GA

2 09 30 10 2.1 Tile PRODUCT DATA GA

3 09 30 10 2.3 Mortar and Grout PRODUCT DATA GA

4 09 30 10 2.1 Tile SAMPLES GA

5 09 30 10 2.3 Grout SAMPLES GA

6 09 30 10 2.1 Tile CERTIFICATES FIO

7 09 30 10 2.3 Mortar and Grout CERTIFICATES FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

8 09 30 10 3.7 Maintenance Instructions MFRS INSTR FIO

9 09 30 10 3.2 Installation O&M DATA GA

10 09 30 10 1.4.1 Local/Regional Materials CLOSEOUT SUBMTL FIO

11 09 30 10 1.2 LEED Documentation CLOSEOUT SUBMTL FIO

12 09 30 10 2.1 Tile CLOSEOUT SUBMTL FIO

SECTION - 09 51 00 ACOUSTICAL CEILINGS

1 09 51 00 1.2 Suspension system SHOP DRAWINGS GA

2 09 51 00 1.2.3 Acoustical Ceiling Systems PRODUCT DATA GA

3 09 51 00 1.4 Certification PRODUCT DATA FIO

4 09 51 00 2.1 Acoustical Units SAMPLES GA

5 09 51 00 2.1 Acoustical Units CERTIFICATES FIO

SECTION - 09 65 00 RESILIENT FLOORING

1 09 65 00 2.4 Resilient Wall Base PRODUCT DATA GA

2 09 65 00 2.4 Resilient Wall Base SAMPLES GA

3 09 65 00 3.1 Installation MFRS INSTR GA

4 09 65 00 2.4 Resilient Wall Base O&M DATA GA

5 09 65 00 1.2 LEED Documentation CLOSEOUT SUBMTL FIO

SECTION - 09 68 00 CARPET

1 09 68 00 3.4 Installation Drawings SHOP DRAWINGS GA

2 09 68 00 2.5 Moldings SHOP DRAWINGS GA

3 09 68 00 2.2 Carpet PRODUCT DATA GA

4 09 68 00 2.5 Moldings PRODUCT DATA GA

5 09 68 00 2.2 Carpet SAMPLES GA

6 09 68 00 2.5 Moldings SAMPLES GA

7 09 68 00 3.2 Moisture and Alkalinity Tests TEST REPORTS GA

8 09 68 00 1.3.1 Indoor Air Quality CERTIFICATES FIO

9 09 68 00 3.1 Surface Preparation MFRS INSTR FIO

10 09 68 00 3.4 Installation MFRS INSTR FIO

11 09 68 00 2.2 Carpet O&M DATA GA

12 09 68 00 3.5 Cleaning and Protection O&M DATA GA

13 09 68 00 2.1.1 Recycled Content for Carpeting CLOSEOUT SUBMTL FIO

14 09 68 00 2.2.1 Recycled Content for Carpeting CLOSEOUT SUBMTL FIO

15 09 68 00 2.2.1 Indoor Air Quality for Carpet CLOSEOUT SUBMTL FIO

16 09 68 00 2.4 Indoor Air Quality for Aerosol Adhesives CLOSEOUT SUBMTL FIO

17 09 68 00 2.4 Indoor Air Quality for Non-Aerosol Adhes CLOSEOUT SUBMTL FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

18 09 68 00 2.4 Indoor Air Quality for Concrete Primer CLOSEOUT SUBMTL FIO

19 09 68 00 1.6 Warranty CLOSEOUT SUBMTL FIO

SECTION - 09 90 00 PAINTS AND COATINGS

1 09 90 00 2.1 Coating PRODUCT DATA GA

2 09 90 00 2.1 Manufacturer's Technical Data Sheets PRODUCT DATA FIO

3 09 90 00 1.10 Color SAMPLES GA

4 09 90 00 1.3 Applicator's qualifications CERTIFICATES FIO

5 09 90 00 1.4.1.2 Qualification Testing CERTIFICATES GA

6 09 90 00 3.2.1 Application instructions MFRS INSTR FIO

7 09 90 00 3.6.2 Mixing MFRS INSTR FIO

8 09 90 00 1.7.2 Manufacturer's Material Safety Data Shee MFRS INSTR FIO

9 09 90 00 2.1 Coatings: O&M DATA GA

10 09 90 00 1.4.2 Certification CLOSEOUT SUBMTL FIO

11 09 90 00 1.9.1 Local/Regional Materials CLOSEOUT SUBMTL FIO

12 09 90 00 2.1 Materials CLOSEOUT SUBMTL FIO

SECTION - 10 14 00.20 INTERIOR SIGNAGE

1 10 14 00.20 1.4.2 Detail Drawings SHOP DRAWINGS GA

2 10 14 00.20 3.1 Installation PRODUCT DATA GA

3 10 14 00.20 2.2.1 Photographic confirmation PRODUCT DATA GA

4 10 14 00.20 1.6 Warranty PRODUCT DATA GA

5 10 14 00.20 1.4.1 Interior Signage SAMPLES GA

6 10 14 00.20 3.1 Approved Manufacturer's Instructions O&M DATA GA

7 10 14 00.20 3.1.2 Protection and Cleaning O&M DATA GA

SECTION - 10 21 13 TOILET COMPARTMENTS

1 10 21 13 2.1 Fabrication Drawings SHOP DRAWINGS FIO

2 10 21 13 2.1 Toilet Partition System PRODUCT DATA GA

3 10 21 13 2.7 Colors and Finishes SAMPLES GA

4 10 21 13 1.6 Warranty CERTIFICATES FIO

5 10 21 13 2.3.1 Toilet Enclosures CLOSEOUT SUBMTL FIO

6 10 21 13 2.3.2 Urinal Screens CLOSEOUT SUBMTL FIO

7 10 21 13 2.5 Pilaster Shoes CLOSEOUT SUBMTL FIO

SECTION - 10 28 13 TOILET ACCESSORIES

1 10 28 13 2.1.2 Finishes PRODUCT DATA GA

2 10 28 13 2.2 Accessory Items PRODUCT DATA GA

3 10 28 13 2.2 Accessory Items CERTIFICATES FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

SECTION - 10 44 16 FIRE EXTINGUISHERS

1 10 44 16 2.1.1 Fire Extinguishers SHOP DRAWINGS GA

2 10 44 16 1.3.1 Accessories SHOP DRAWINGS GA

3 10 44 16 2.2.1 Cabinets SHOP DRAWINGS GA

4 10 44 16 2.1.1 Fire Extinguishers PRODUCT DATA GA

5 10 44 16 1.3.1 Accessories PRODUCT DATA GA

6 10 44 16 2.2.1 Cabinets PRODUCT DATA GA

7 10 44 16 3.2.1 Replacement Parts List PRODUCT DATA GA

8 10 44 16 2.1.1 Fire Extinguishers CERTIFICATES GA

SECTION - 21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS

1 21 13 00.00 40 1.2 Record of Existing Conditions PRECON SUBMTL GA

2 21 13 00.00 40 2.2.2 Supporting Elements SHOP DRAWINGS GA

3 21 13 00.00 40 2.2.3 Sprinkler Heads SHOP DRAWINGS GA

4 21 13 00.00 40 2.2.4 Valves SHOP DRAWINGS GA

5 21 13 00.00 40 2.2.1 Aboveground Piping Materials PRODUCT DATA GA

6 21 13 00.00 40 2.2.4 Valves PRODUCT DATA GA

7 21 13 00.00 40 2.2.3 Sprinkler Heads PRODUCT DATA GA

8 21 13 00.00 40 2.3 Materials PRODUCT DATA GA

9 21 13 00.00 40 2.2.2 Supporting Elements PRODUCT DATA GA

10 21 13 00.00 40 2.1 Equipment and Performance Data PRODUCT DATA GA

11 21 13 00.00 40 Part 2 Design Analysis and Calculations DESIGN DATA GA

12 21 13 00.00 40 3.3.5 Pressure Tests TEST REPORTS GA

SECTION - 21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

1 21 13 13.00 10 1.4.3 Shop Drawings SHOP DRAWINGS GA

2 21 13 13.00 10 3.6 As-Built Drawings SHOP DRAWINGS GA

3 21 13 13.00 10 1.4.1 Fire Protection Related Submittals PRODUCT DATA FIO

4 21 13 13.00 10 2.3 Materials and Equipment PRODUCT DATA GA

5 21 13 13.00 10 1.6 Spare Parts PRODUCT DATA FIO

6 21 13 13.00 10 3.5 Preliminary Tests PRODUCT DATA GA

7 21 13 13.00 10 3.6 Final Acceptance Test PRODUCT DATA GA

8 21 13 13.00 10 1.4.1 Fire Protection Specialist PRODUCT DATA GA

9 21 13 13.00 10 1.4.2 Sprinkler System Installer PRODUCT DATA GA

10 21 13 13.00 10 1.4.3 Sway Bracing DESIGN DATA GA

11 21 13 13.00 10 1.2.1.3 Hydraulic Calculations DESIGN DATA GA

12 21 13 13.00 10 3.5 Preliminary Test Report TEST REPORTS GA

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

Building 3-2847 Reconfiguration, JSOC

W912PM-17-B-0011 NA

06 Jun 2017

SORT : SECTION & ITEMRANGE : ALL

13 21 13 13.00 10 3.6 Final Acceptance Test Report TEST REPORTS GA

14 21 13 13.00 10 3.6 Operating and Maintenance Manuals O&M DATA GA

SECTION - 22 00 00 PLUMBING, GENERAL PURPOSE

1 22 00 00 2.4 Fixtures PRODUCT DATA GA

2 22 00 00 2.4.1 Flush valve water closets PRODUCT DATA GA

3 22 00 00 2.4.2 Flush valve urinals PRODUCT DATA GA

4 22 00 00 2.4.4 Countertop lavatories PRODUCT DATA GA

5 22 00 00 3.5.1.1 Backflow prevention assemblies PRODUCT DATA GA

6 22 00 00 3.5 TESTS, FLUSHING AND DISINFECTION TEST REPORTS GA

7 22 00 00 3.5.1.1 Test of Backflow Prevention Assemblies TEST REPORTS GA

8 22 00 00 1.3 Materials and Equipment CERTIFICATES GA

9 22 00 00 Plumbing System O&M DATA GA

10 22 00 00 3.5.1 Plumbing System O&M DATA FIO

SECTION - 22 07 19.00 40 PLUMBING PIPING INSULATION

1 22 07 19.00 40 2.3 Adhesives PRODUCT DATA GA

2 22 07 19.00 40 2.3 Coatings PRODUCT DATA GA

3 22 07 19.00 40 2.3 Insulation Materials; PRODUCT DATA GA

4 22 07 19.00 40 2.3 Tape; PRODUCT DATA GA

5 22 07 19.00 40 1.2 Installation Manual; MFRS INSTR GA

SECTION - 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

1 23 00 00 1.4.5 Detail Drawings SHOP DRAWINGS GA

2 23 00 00 2.8.1.1 Metallic…