W912PM-16-B-0019-0003.pdf
PDF 188 KB Posted
- Attached to
- MB-00018-5P Building E-1930 Renovations Federal contract opportunity
- Solicitation number
- W912PM-16-B-0019
About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16B0019_Bid_Opening_Attendance.pdf | ||
| 16-B-0019_Renovations_E-1930_Bid_Abstract_.pdf | ||
| W912PM-16-B-0019-0003_Conform_Copy.pdf | ||
| W912PM-16-B-0019-0002.pdf | ||
| W912PM-16-B-0019-0002_Conformed.pdf | ||
| W912PM-16-B-0019-0001_Conformed_SF1442.pdf | ||
| Amdt0001_W912PM-16-B-0019.pdf | ||
| Building_E-1930_-_SPECS_-_Combined_Volume_1_and_Volume_2.pdf | ||
| ADV_PLANS_E1930.pdf | ||
| ADV_PLANS_E1930_DGNfiles.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912PM-16-B-0019 is hereby amended to incorporate the follow ing changes:
SEE TECHNICAL SUMMARY OF CHANGES
All other terms and conditions remain in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-B-0019
X 9B. DATED (SEE ITEM 11)
22-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Sep-2016
CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM-16-B-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
W912PM-16-B-0019
Amendment 0003
Technical Summary of Changes
PROJECT TABLE OF CONTENTS
Delete existing Pages 1 THRU 3 (Volumes 1 and 2) in their entirety and replace with revised enclosed Pages.
01 33 00 – SUBMITTAL PROCEDURES
Delete Attachment 1 – ENG Form 4288, Pages 1 THRU 54 in their entirety and replace with enclosed ENG Form 4288, Pages 1 THRU 29.
33 61 13.13 – PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
Add SECTION in its entirety.
NOTE:
The text changes may have necessitated reformatting of subsequent
Text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
-- End of Summary of Changes- -
Encls As Stated
BUILDINGE1930 RENOVATION W912PM-16-B-0019
Ft. Bragg, North Carolina
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 05 CERTIFICATIONS
00 01 15 LIST OF DRAWINGS
00 31 00 AVAILABLE PROJECT INFORMATION
00 31 02 LEED CHECKLIST
DIVISION 01 - GENERAL REQUIREMENTS
01 00 05 GENERAL AND SPECIAL PROVISIONS
01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 CONSTRUCTION SECURITY REQUIREMENTS AND WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 LEED(TM) DOCUMENTATION
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 35 SPECIAL INSPECTIONS AND FORMS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.11 INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.00 40 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 35 43 POLISHED CONCRETE FINISHING
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 0003)
07 21 16 MINERAL FIBER BLANKET INSULATION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 05 61 COMMON WORK RESULTS FOR FLOORING PREPARATION
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT BASE
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHER CABINETS
10 56 00 MOBILE STORAGE SHELVING UNITS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 21 13.23 20 MEDIUM TEMPERATURE WATER SYSTEM WITHIN BUILDINGS
PROJECT TABLE OF CONTENTS Page 2
23 64 26 CHILLED WATER PIPING SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 16 01.00 10 SMALL INTRUSION DETECTION SYSTEM
28 20 01.00 10 ELECTRONIC SECURITY SYSTEM
28 23 23.00 10 CLOSED CIRCUIT TELEVISION SYSTEMS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 10 00 BITUMINOUS CONCRETE PAVEMENT
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK COAT
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 92 23 SODDING
***Amendment 0003***
DIVISION 33 - UTILITIES
33 61 13 PRE-ENGINEERED UNDERGROUND HEAT DISTRIBUTION SYSTEM
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES
***Amendment 0003***
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SUBMITTAL REGISTER (ER 415-1-10)
TITLE AND LOCATION DATE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
1 01 10 00.10 38 1.9 List of Subcontractors PRECON SUBMTL FIO
2 01 10 00.10 38 1.9 Quality Control Plan PRECON SUBMTL GA
3 01 10 00.10 38 1.9 Certificate of Insurance PRECON SUBMTL FIO
4 01 10 00.10 38 1.6 PROGRESS SCHEDULE PRODUCT DATA FIO
5 01 10 00.10 38 1.9 Completion of Corps CQC Course CERTIFICATES FIO
6 01 10 00.10 38 1.9 Letter Appointing Superintendent CERTIFICATES FIO
7 01 10 00.10 38 1.18 commercial testing laboratory CERTIFICATES FIO
8 01 10 00.10 38 1.18 Contractor's testing laboratory CERTIFICATES GA
9 01 10 00.10 38 1.10 SYSTEM AS-BUILT DRAWINGS CLOSEOUT SUBMTL GA
SECTION - 01 11 00 SUMMARY OF WORK
1 01 11 00 1.6 Salvage Plan PRECON SUBMTL GA
SECTION - 01 14 00 WORK RESTRICTIONS
1 01 14 00 1.4 Construction Personnel PRECON SUBMTL GA
2 01 14 00 1.5 Contact Personnel PRECON SUBMTL FIO
3 01 14 00 1.6 Daily Reports, Delivery Reports, and Dai CERTIFICATES FIO
4 01 14 00 1.7 Construction Vehicles CERTIFICATES FIO
SECTION - 01 30 00 ADMINISTRATIVE REQUIREMENTS
1 01 30 00 1.2 View location map PRECON SUBMTL GA
2 01 30 00 1.3 Progress and completion pictures PRECON SUBMTL GA
SECTION - 01 32 01.00 10 PROJECT SCHEDULE
1 01 32 01.00 10 1.3 Project Scheduler Qualifications PRECON SUBMTL GA
2 01 32 01.00 10 3.4.1 Preliminary Project Schedule PRECON SUBMTL GA
3 01 32 01.00 10 3.4.2 Initial Project Schedule PRECON SUBMTL GA
4 01 32 01.00 10 3.6.2 Periodic Schedule Update PRECON SUBMTL GA
SECTION - 01 33 00 SUBMITTAL PROCEDURES
1 01 33 00 1.7 Submittal Register PRECON SUBMTL GA
SECTION - 01 33 29 LEED(TM) DOCUMENTATION
1 01 33 29 1.4 LEED Implementation Plan PRECON SUBMTL GA
2 01 33 29 1.5 LEED Documentation Notebook CLOSEOUT SUBMTL GA
SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1 01 35 26 1.7 Accident Prevention Plan (APP) PRECON SUBMTL GA
2 01 35 26 1.6.1.1 Site Safety and Health Officer (SSHO) PRECON SUBMTL GA
3 01 35 26 1.4 Monthly Exposure Reports TEST REPORTS FIO
4 01 35 26 1.12 Notifications and Reports TEST REPORTS FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
5 01 35 26 1.12.2 Accident Reports TEST REPORTS GA
6 01 35 26 1.12.3 LHE Inspection Reports TEST REPORTS FIO
7 01 35 26 1.6.1.5 Crane Operators/Riggers CERTIFICATES FIO
8 01 35 26 1.7.2.2 Standard Lift Plan CERTIFICATES GA
9 01 35 26 1.7.2.3 Critical Lift Plan CERTIFICATES GA
10 01 35 26 1.8 Activity Hazard Analysis (AHA) CERTIFICATES FIO
11 01 35 26 1.9.1 Confined Space Entry Permit CERTIFICATES FIO
12 01 35 26 1.9.1 Hot Work Permit CERTIFICATES FIO
13 01 35 26 1.12.4 Certificate of Compliance CERTIFICATES FIO
SECTION - 01 45 35 Special Inspection For Seismic-Resisting Systems
1 01 45 35 1.5 Special Inspector CERTIFICATES GA
2 01 45 35 1.4 Quality Control Plan CERTIFICATES GA
SECTION - 01 50 00 Temporary Construction Facilities And Controls
1 01 50 00 1.3 Construction Site Plan PRECON SUBMTL GA
SECTION - 01 57 19.11 INDOOR AIR QUALITY (AQ) MANAGEMENT
1 01 57 19.11 1.3 Indoor Air Quality (IAQ) Management Plan PRECON SUBMTL GA
2 01 57 19.11 1.3.2 Air contamination testing TEST REPORTS FIO
3 01 57 19.11 LEED CLOSEOUT SUBMTL FIO
SECTION - 01 57 20.00 10 ENVIRONMENTAL PROTECTION
1 01 57 20.00 10 1.7 Environmental Protection Plan PRECON SUBMTL GA
SECTION - 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
1 01 57 23 1.3 Erosion and Sediment Controls TEST REPORTS FIO
2 01 57 23 2.1.3 Mill Certificate or Affidavit CERTIFICATES FIO
SECTION - 01 58 00 PROJECT IDENTIFICATION
1 01 58 00 preliminary drawing indicating layout an SHOP DRAWINGS GA
2 01 58 00 1.3.1 Sign Legend Orders SHOP DRAWINGS GA
3 01 58 00 Facility Recognition Plaque SAMPLES GA
SECTION - 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
1 01 74 19 1.6 Waste Management Plan PRECON SUBMTL GA
2 01 74 19 1.7 Records CLOSEOUT SUBMTL FIO
SECTION - 01 78 00 CLOSEOUT SUBMITTALS
1 01 78 00 1.3.2 As-Built Record of Equipment and Materia PRODUCT DATA FIO
2 01 78 00 1.7.1 Warranty Management Plan PRODUCT DATA FIO
3 01 78 00 1.7.5 Warranty Tags PRODUCT DATA FIO
4 01 78 00 Final Cleaning PRODUCT DATA FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
5 01 78 00 1.4 Spare Parts Data PRODUCT DATA FIO
6 01 78 00 1.5 Preventative Maintenance MFRS INSTR FIO
7 01 78 00 1.5 Condition Monitoring (Predictive Testing MFRS INSTR FIO
8 01 78 00 1.5 Inspection MFRS INSTR FIO
9 01 78 00 1.7.1 Instructions MFRS INSTR FIO
10 01 78 00 1.9 Operation and Maintenance Manuals O&M DATA FIO
11 01 78 00 1.3.1 Record Drawings CLOSEOUT SUBMTL FIO
12 01 78 00 1.6 Certification of EPA Designated Items CLOSEOUT SUBMTL GA
13 01 78 00 1.11 Form DD1354 CLOSEOUT SUBMTL GA
14 01 78 00 1.11 Checklist for Form DD1354 CLOSEOUT SUBMTL GA
SECTION - 01 91 00.00 40 COMMISSIONING
1 01 91 00.00 40 2.1.1 Commissioning Plan PRECON SUBMTL GA
2 01 91 00.00 40 2.1.1 Commissioning Schedule PRECON SUBMTL GA
3 01 91 00.00 40 1.6 Basis of Design DESIGN DATA GA
4 01 91 00.00 40 3.2.5 Functional Performance Testing Results TEST REPORTS GA
5 01 91 00.00 40 3.3 Short-Term Diagnostic Testing TEST REPORTS GA
6 01 91 00.00 40 3.1 Deficiency Report and Resolution Record TEST REPORTS GA
7 01 91 00.00 40 1.5 Commissioning Agents Qualifications CERTIFICATES GA
8 01 91 00.00 40 3.5 Operations and Maintenance Manuals O&M DATA GA
9 01 91 00.00 40 3.5 Training Plan O&M DATA GA
10 01 91 00.00 40 3.5 Operations and Maintenance Database O&M DATA GA
11 01 91 00.00 40 3.1 Final Commissioning Report CLOSEOUT SUBMTL GA
12 01 91 00.00 40 3.6 LEED™ Documentation CLOSEOUT SUBMTL GA
13 01 91 00.00 40 3.1 Warranty CLOSEOUT SUBMTL GA
SECTION - 02 41 00 DEMOLITION
1 02 41 00 1.10 Existing Conditions PRECON SUBMTL GA
2 02 41 00 1.2.1 Demolition Plan CERTIFICATES GA
3 02 41 00 1.7 Notification CERTIFICATES GA
SECTION - 02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND MERCURY
1 02 84 16 1.8.1 Qualifications of CIH CERTIFICATES GA
2 02 84 16 1.8.1 Training Certification CERTIFICATES GA
3 02 84 16 1.8.2 PCB and Lamp Removal Work Plan CERTIFICATES GA
4 02 84 16 1.8.3 PCB and Lamp Disposal Plan CERTIFICATES GA
5 02 84 16 3.5.2 Transporter certification CLOSEOUT SUBMTL GA
6 02 84 16 3.2.4 Certification of Decontamination CLOSEOUT SUBMTL FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
7 02 84 16 3.5.2.1 Certificate of Disposal and/or recycling CLOSEOUT SUBMTL FIO
8 02 84 16 3.5.3.2 DD Form 1348-1 CLOSEOUT SUBMTL FIO
SECTION - 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
1 03 30 53 1.5 Installation Drawings SHOP DRAWINGS GA
2 03 30 53 2.2.3.1 Air-Entraining Admixture PRODUCT DATA FIO
3 03 30 53 2.2.3.2 Accelerating Admixture PRODUCT DATA FIO
4 03 30 53 2.2.3.3 Water-Reducing or Retarding Admixture PRODUCT DATA FIO
5 03 30 53 2.2.11 Curing Materials PRODUCT DATA FIO
6 03 30 53 2.2.6 Expansion Joint Filler Strips, Premolded PRODUCT DATA FIO
7 03 30 53 2.2.7 Joint Sealants - Field Molded Sealants PRODUCT DATA FIO
8 03 30 53 3.1.4.3 Batching and Mixing Equipment PRODUCT DATA FIO
9 03 30 53 3.2 Conveying and Placing Concrete PRODUCT DATA FIO
10 03 30 53 2.2.8 Formwork PRODUCT DATA FIO
11 03 30 53 2.3 Mix Design Data PRODUCT DATA GA
12 03 30 53 2.3 Ready-Mix Concrete PRODUCT DATA FIO
13 03 30 53 2.4.2 Curing Compound PRODUCT DATA FIO
14 03 30 53 2.2.5 Mechanical Reinforcing Bar Connectors PRODUCT DATA FIO
15 03 30 53 2.2.2 Aggregates TEST REPORTS FIO
16 03 30 53 2.1.3 Concrete Mixture Proportions TEST REPORTS GA
17 03 30 53 3.3.3.2 Measurement of Floor Tolerances TEST REPORTS FIO
18 03 30 53 3.9.3 Compressive Strength Testing TEST REPORTS GA
19 03 30 53 3.9.3 Slump TEST REPORTS GA
20 03 30 53 3.9.3 Air Content TEST REPORTS FIO
21 03 30 53 2.2.4 Water TEST REPORTS FIO
22 03 30 53 2.2.1 Cementitious Materials CERTIFICATES FIO
23 03 30 53 2.2.1.2 Pozzolan CERTIFICATES FIO
24 03 30 53 1.5.1 CPG for recycled materials or appropriat CERTIFICATES FIO
25 03 30 53 2.2.2 Aggregates CERTIFICATES FIO
26 03 30 53 2.3 Delivery Tickets CERTIFICATES FIO
27 03 30 53 2.4.2 Curing Compound MFRS INSTR FIO
SECTION - 03 35 43 POLISHED CONCRETE FINISHING
1 03 35 43 Manufacturer's Product Information PRODUCT DATA GA
2 03 35 43 Polishing System MFRS INSTR GA
3 03 35 43 Polishing System O&M DATA GA
SECTION - 04 20 00 MASONRY
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
1 04 20 00 1.4.5 Detail Drawings SHOP DRAWINGS GA
2 04 20 00 1.2.1 Local/Regional Materials PRODUCT DATA FIO
3 04 20 00 1.2.3 Environmental Data PRODUCT DATA FIO
4 04 20 00 2.2 Clay or Shale Brick PRODUCT DATA FIO
5 04 20 00 2.5.3 Cement PRODUCT DATA FIO
6 04 20 00 2.12 Insulation PRODUCT DATA FIO
7 04 20 00 1.6.2 Cold Weather Installation PRODUCT DATA FIO
8 04 20 00 2.6 Water-Repellant Admixture PRODUCT DATA FIO
9 04 20 00 2.3 Concrete Masonry Units (CMU) SAMPLES GA
10 04 20 00 2.2 Clay or Shale Brick SAMPLES FIO
11 04 20 00 2.5.4 Pre-mixed Mortar DESIGN DATA GA
12 04 20 00 1.2.5.1 Unit Strength Method DESIGN DATA GA
13 04 20 00 3.20.1 Efflorescence Test TEST REPORTS FIO
14 04 20 00 Field Testing of Mortar TEST REPORTS GA
15 04 20 00 Field Testing of Grout TEST REPORTS GA
16 04 20 00 Prism tests TEST REPORTS GA
17 04 20 00 2.5.3 Masonry Cement TEST REPORTS GA
18 04 20 00 1.4.4 Masonry Inspector Qualifications TEST REPORTS GA
19 04 20 00 3.20.2 Single-Wythe Masonry Wall Water Penetrat TEST REPORTS FIO
20 04 20 00 2.2 Clay or Shale Brick CERTIFICATES FIO
21 04 20 00 2.3 Concrete Masonry Units (CMU) CERTIFICATES FIO
22 04 20 00 2.8 Anchors, Ties, and Bar Positioners CERTIFICATES FIO
23 04 20 00 2.13 Expansion-Joint Materials CERTIFICATES FIO
24 04 20 00 2.9 Joint Reinforcement CERTIFICATES FIO
25 04 20 00 2.5.3 Masonry Cement CERTIFICATES FIO
26 04 20 00 2.12 Insulation CERTIFICATES FIO
27 04 20 00 2.12 Insulation CERTIFICATES FIO
28 04 20 00 2.5.1 Admixtures for Masonry Mortar CERTIFICATES FIO
29 04 20 00 2.7.1 Admixtures for Grout CERTIFICATES FIO
30 04 20 00 1.4.2 Contamination CERTIFICATES FIO
31 04 20 00 2.5.3 Masonry Cement MFRS INSTR FIO
32 04 20 00 1.2.4 Plastic Identification O&M DATA FIO
33 04 20 00 3.19.1 Take-Back Program O&M DATA FIO
SECTION - 06 10 00 ROUGH CARPENTRY
1 06 10 00 2.2.1 Nailing Strips SHOP DRAWINGS GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
2 06 10 00 Local/Regional Materials PRODUCT DATA FIO
3 06 10 00 1.8 Fire-retardant treatment PRODUCT DATA FIO
4 06 10 00 2.1.2 Engineered wood products PRODUCT DATA FIO
5 06 10 00 2.4.1 Adhesives PRODUCT DATA FIO
6 06 10 00 1.4.3 Preservative-treated PRODUCT DATA FIO
7 06 10 00 1.11.4 Forest Stewardship Council (FSC) Certifi CERTIFICATES FIO
8 06 10 00 1.9.1 Certificates of grade CERTIFICATES FIO
9 06 10 00 1.7 Preservative treatment CERTIFICATES FIO
10 06 10 00 3.2 Take-back program CERTIFICATES FIO
11 06 10 00 Local/Regional Materials CLOSEOUT SUBMTL FIO
12 06 10 00 2.4.1 Adhesives CLOSEOUT SUBMTL FIO
13 06 10 00 1.11.3 Certified Wood CLOSEOUT SUBMTL FIO
14 06 10 00 1.11.4 Certified Wood CLOSEOUT SUBMTL FIO
SECTION - 06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
1 06 41 16.00 10 1.5.2 Shop Drawings SHOP DRAWINGS FIO
2 06 41 16.00 10 2.11 Shop Drawings SHOP DRAWINGS FIO
3 06 41 16.00 10 3.1 Installation SHOP DRAWINGS FIO
4 06 41 16.00 10 2.1 Wood Materials PRODUCT DATA FIO
5 06 41 16.00 10 Finish Schedule PRODUCT DATA FIO
6 06 41 16.00 10 2.11.6 Countertops SAMPLES FIO
7 06 41 16.00 10 2.3 Plastic Laminates SAMPLES FIO
8 06 41 16.00 10 2.6 Cabinet Hardware SAMPLES FIO
9 06 41 16.00 10 1.5 Quality Assurance CERTIFICATES FIO
10 06 41 16.00 10 3.1 Laminate Clad Casework CERTIFICATES FIO
11 06 41 16.00 10 1.3 LEED Documentation CLOSEOUT SUBMTL FIO
SECTION - 06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
1 06 61 16 1.5.2 Detail Drawings SHOP DRAWINGS GA
2 06 61 16 3.1 Installation SHOP DRAWINGS GA
3 06 61 16 2.1 Solid polymer material PRODUCT DATA FIO
4 06 61 16 1.5.1 Qualifications PRODUCT DATA FIO
5 06 61 16 2.3 Fabrications PRODUCT DATA FIO
6 06 61 16 2.2.3 VOC Content PRODUCT DATA FIO
7 06 61 16 2.1 Material SAMPLES GA
8 06 61 16 2.3.4 Counter and Vanity Tops SAMPLES GA
9 06 61 16 2.1 Solid polymer material TEST REPORTS FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
10 06 61 16 2.3 Fabrications CERTIFICATES FIO
11 06 61 16 1.5.1 Qualifications CERTIFICATES FIO
12 06 61 16 3.2 Clean-up O&M DATA FIO
13 06 61 16 LEED Documentation CLOSEOUT SUBMTL FIO
SECTION - 07 21 13 BOARD AND BLOCK INSULATION
1 07 21 13 2.1 Block or board insulation PRODUCT DATA GA
2 07 21 13 Vapor retarder PRODUCT DATA FIO
3 07 21 13 Pressure sensitive tape PRODUCT DATA FIO
4 07 21 13 2.3 Protection board or coating PRODUCT DATA FIO
5 07 21 13 2.4 Accessories PRODUCT DATA FIO
6 07 21 13 2.1 Block or Board Insulation MFRS INSTR FIO
7 07 21 13 2.4.1 Adhesive MFRS INSTR FIO
SECTION - 07 21 16 MINERAL FIBER BLANKET INSULATION
1 07 21 16 2.1 Blanket insulation PRODUCT DATA GA
2 07 21 16 2.3 Accessories PRODUCT DATA FIO
3 07 21 16 Certification PRODUCT DATA FIO
4 07 21 16 3.3.1 Insulation MFRS INSTR FIO
SECTION - 07 84 00 FIRESTOPPING
1 07 84 00 2.1 Firestopping Materials SHOP DRAWINGS GA
2 07 84 00 3.3 Inspection TEST REPORTS FIO
3 07 84 00 1.4.2 Inspector Qualifications CERTIFICATES FIO
4 07 84 00 2.1 Firestopping Materials CERTIFICATES FIO
5 07 84 00 1.4.1 Installer Qualifications CERTIFICATES FIO
SECTION - 07 92 00 JOINT SEALANTS
1 07 92 00 2.1 Sealants PRODUCT DATA FIO
2 07 92 00 2.2 Primers PRODUCT DATA FIO
3 07 92 00 2.3 Bond breakers PRODUCT DATA FIO
4 07 92 00 2.4 Backstops PRODUCT DATA GA
5 07 92 00 3.3.6 Sealant CERTIFICATES FIO
6 07 92 00 2.1 Sealants CLOSEOUT SUBMTL FIO
SECTION - 08 11 13 STEEL DOORS AND FRAMES
1 08 11 13 2.1 Doors SHOP DRAWINGS GA
2 08 11 13 2.1 Doors SHOP DRAWINGS GA
3 08 11 13 2.4 Frames SHOP DRAWINGS GA
4 08 11 13 2.4 Frames SHOP DRAWINGS GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
5 08 11 13 2.2 Accessories SHOP DRAWINGS FIO
6 08 11 13 2.5 Weatherstripping SHOP DRAWINGS FIO
7 08 11 13 2.4 Frames PRODUCT DATA GA
8 08 11 13 2.2 Accessories PRODUCT DATA FIO
SECTION - 08 14 00 WOOD DOORS
1 08 14 00 2.1 Doors SHOP DRAWINGS GA
2 08 14 00 2.1 Doors PRODUCT DATA GA
3 08 14 00 2.2 Accessories PRODUCT DATA FIO
4 08 14 00 3.1 Water-resistant sealer PRODUCT DATA FIO
5 08 14 00 1.7 warranty PRODUCT DATA FIO
6 08 14 00 2.1.3 Sound transmission class rating PRODUCT DATA GA
7 08 14 00 Fire resistance rating PRODUCT DATA GA
8 08 14 00 1.4 Certification PRODUCT DATA FIO
9 08 14 00 1.5 Local/Regional Materials PRODUCT DATA FIO
10 08 14 00 1.3.1 Low-Emitting Materials, Adhesives And Se PRODUCT DATA FIO
11 08 14 00 2.1 Doors SAMPLES FIO
12 08 14 00 2.3.5.2 Door finish colors SAMPLES GA
13 08 14 00 2.4 Cycle-slam TEST REPORTS FIO
14 08 14 00 2.4 Hinge loading resistance TEST REPORTS FIO
SECTION - 08 71 00 DOOR HARDWARE
1 08 71 00 1.3 Hardware schedule SHOP DRAWINGS FIO
2 08 71 00 2.3.5 Keying system SHOP DRAWINGS FIO
3 08 71 00 2.3 Hardware items PRODUCT DATA FIO
4 08 71 00 3.1 Installation MFRS INSTR FIO
5 08 71 00 1.3 Hardware Schedule O&M DATA FIO
6 08 71 00 1.5 Key Bitting CLOSEOUT SUBMTL FIO
SECTION - 09 05 61 COMMON WORK RESULTS FOR FLOORING PREPARATION
1 09 05 61 1.6.1 Visual Observation Report PRECON SUBMTL GA
2 09 05 61 2.1 Floor covering manufacturer's recommende PRODUCT DATA GA
3 09 05 61 2.1 Floor covering manufacturer's recommende PRODUCT DATA GA
4 09 05 61 2.1 Remedial Materials PRODUCT DATA GA
5 09 05 61 1.6.1 Testing Agency's Report TEST REPORTS GA
6 09 05 61 1.6.1 Adhesive Bond and Compatibility Test TEST REPORTS GA
SECTION - 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
1 09 22 00 2.1 Metal support systems SHOP DRAWINGS GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
SECTION - 09 29 00 GYPSUM BOARD
1 09 29 00 2.1.4 Cementitious backer units PRODUCT DATA FIO
2 09 29 00 2.1.3 Glass Mat Water-Resistant Gypsum Tile Ba PRODUCT DATA FIO
3 09 29 00 2.1.2 Water-Resistant Gypsum Backing Board PRODUCT DATA FIO
4 09 29 00 2.1.1 Gypsum Board PRODUCT DATA FIO
5 09 29 00 2.1.8 Accessories PRODUCT DATA FIO
6 09 29 00 2.1 Asbestos Free Materials CERTIFICATES GA
7 09 29 00 3.8 Waste Management O&M DATA FIO
8 09 29 00 1.5.1 Local/Regional Materials CLOSEOUT SUBMTL FIO
9 09 29 00 2.1.1 Gypsum Board CLOSEOUT SUBMTL FIO
10 09 29 00 2.1.7 Adhesives CLOSEOUT SUBMTL FIO
SECTION - 09 30 13 Ceramic Tiling
1 09 30 13 3.2 Detail Drawings SHOP DRAWINGS GA
2 09 30 13 Environmental Data PRODUCT DATA FIO
3 09 30 13 2.1 Tile PRODUCT DATA GA
4 09 30 13 2.3 Mortar, Grout, and Adhesive PRODUCT DATA FIO
5 09 30 13 2.1 Tile SAMPLES GA
6 09 30 13 2.1 Accessories SAMPLES GA
7 09 30 13 Transition Strips SAMPLES GA
8 09 30 13 2.3 Grout SAMPLES GA
9 09 30 13 2.1 Tile CERTIFICATES FIO
10 09 30 13 2.3 Mortar, Grout, and Adhesive CERTIFICATES FIO
11 09 30 13 3.5 Maintenance Instructions MFRS INSTR FIO
12 09 30 13 3.2 Installation O&M DATA GA
13 09 30 13 1.3 LEED Documentation CLOSEOUT SUBMTL FIO
14 09 30 13 Adhesives CLOSEOUT SUBMTL FIO
SECTION - 09 51 00 ACOUSTICAL CEILINGS
1 09 51 00 1.2 Approved Detail Drawings SHOP DRAWINGS FIO
2 09 51 00 2.1 Acoustical Units PRODUCT DATA FIO
3 09 51 00 Certification PRODUCT DATA FIO
4 09 51 00 2.1 Acoustical Units SAMPLES FIO
5 09 51 00 2.1.1 Acoustic Ceiling Tiles SAMPLES FIO
6 09 51 00 2.1 Acoustical Units CERTIFICATES FIO
7 09 51 00 2.1.1 Acoustic Ceiling Tiles CERTIFICATES FIO
SECTION - 09 65 00 RESILIENT FLOORING
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
1 09 65 00 2.3 Adhesives PRODUCT DATA FIO
2 09 65 00 2.1 Wall Base PRODUCT DATA FIO
3 09 65 00 3.2 Surface Preparation MFRS INSTR GA
4 09 65 00 3.1 Installation MFRS INSTR GA
5 09 65 00 1.3 LEED Documentation CLOSEOUT SUBMTL FIO
SECTION - 09 67 23.13 STANDARD RESINOUS FLOORING
1 09 67 23.13 1.4.1 Installation Drawings SHOP DRAWINGS GA
2 09 67 23.13 1.4.1 Fabrication Drawings SHOP DRAWINGS GA
3 09 67 23.13 1.4.1.1 Manufacturer's Catalog Data PRODUCT DATA GA
4 09 67 23.13 2.1.1 Epoxy-Resin Binder/Matrix PRODUCT DATA GA
5 09 67 23.13 1.5.3 Hardboard Mounted Epoxy Flooring SAMPLES GA
6 09 67 23.13 1.4.1.2 Design Mix Data DESIGN DATA GA
7 09 67 23.13 2.1.1 Epoxy-Resin Binder/Matrix DESIGN DATA GA
8 09 67 23.13 Records of Inspection TEST REPORTS GA
9 09 67 23.13 1.5.2 Listing of Product Installations CERTIFICATES GA
10 09 67 23.13 1.5 Referenced Standards Certificates CERTIFICATES GA
11 09 67 23.13 3.6 Warranty CERTIFICATES GA
SECTION - 09 68 00 CARPET
1 09 68 00 3.4 Installation Drawings SHOP DRAWINGS GA
2 09 68 00 2.4 Moldings SHOP DRAWINGS GA
3 09 68 00 2.1 Carpet PRODUCT DATA GA
4 09 68 00 2.4 Moldings PRODUCT DATA GA
5 09 68 00 2.1.1 Physical Characteristics PRODUCT DATA FIO
6 09 68 00 2.1.2 Physical Characteristics PRODUCT DATA FIO
7 09 68 00 1.3.1 Local/Regional Materials PRODUCT DATA FIO
8 09 68 00 1.3.2 Environmental Data PRODUCT DATA FIO
9 09 68 00 2.3 Adhesives PRODUCT DATA FIO
10 09 68 00 2.1 Carpet SAMPLES GA
11 09 68 00 2.4 Moldings SAMPLES GA
12 09 68 00 3.2 Moisture and Alkalinity Tests TEST REPORTS GA
13 09 68 00 2.1 Carpet CERTIFICATES FIO
14 09 68 00 1.5 Regulatory Requirements CERTIFICATES FIO
15 09 68 00 3.1 Surface Preparation MFRS INSTR FIO
16 09 68 00 3.4 Installation MFRS INSTR FIO
17 09 68 00 2.1 Carpet O&M DATA GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
18 09 68 00 3.5 Cleaning and Protection O&M DATA GA
19 09 68 00 1.3 LEED Documentation CLOSEOUT SUBMTL FIO
20 09 68 00 1.3 LEED Documentation CLOSEOUT SUBMTL FIO
SECTION - 09 90 00 PAINTS AND COATINGS
1 09 90 00 3.10 Piping identification SHOP DRAWINGS FIO
2 09 90 00 3.10 stencil SHOP DRAWINGS FIO
3 09 90 00 Local/Regional Materials PRODUCT DATA FIO
4 09 90 00 1.10.2 Environmental Data PRODUCT DATA FIO
5 09 90 00 Materials PRODUCT DATA FIO
6 09 90 00 2.1 Coating PRODUCT DATA GA
7 09 90 00 2.1 Manufacturer's Technical Data Sheets PRODUCT DATA FIO
8 09 90 00 1.12 Color SAMPLES GA
9 09 90 00 1.3 Applicator's qualifications CERTIFICATES FIO
10 09 90 00 1.4.1.2 Qualification Testing CERTIFICATES GA
11 09 90 00 3.2.1 Application instructions MFRS INSTR FIO
12 09 90 00 3.6.2 Mixing MFRS INSTR FIO
13 09 90 00 1.8.2 Manufacturer's Material Safety Data Shee MFRS INSTR FIO
14 09 90 00 2.1 Coatings: O&M DATA GA
SECTION - 10 14 00.20 INTERIOR SIGNAGE
1 10 14 00.20 1.5.2 Detail Drawings SHOP DRAWINGS GA
2 10 14 00.20 3.1 Installation PRODUCT DATA GA
3 10 14 00.20 1.7 Warranty PRODUCT DATA GA
4 10 14 00.20 1.5.1 Interior Signage SAMPLES GA
5 10 14 00.20 3.1 Approved Manufacturer's Instructions O&M DATA GA
6 10 14 00.20 3.1.2 Protection and Cleaning O&M DATA GA
7 10 14 00.20 1.2 LEED Documentation CLOSEOUT SUBMTL FIO
SECTION - 10 21 13 TOILET COMPARTMENTS
1 10 21 13 2.1 Fabrication Drawings SHOP DRAWINGS FIO
2 10 21 13 3.2 Installation Drawings SHOP DRAWINGS GA
3 10 21 13 2.1 Cleaning and Maintenance Instructions PRODUCT DATA FIO
4 10 21 13 2.7 Colors And Finishes PRODUCT DATA FIO
5 10 21 13 2.2.1 Anchoring Devices and Fasteners PRODUCT DATA FIO
6 10 21 13 2.2.3 Hardware and Fittings PRODUCT DATA FIO
7 10 21 13 2.2.2 Brackets PRODUCT DATA FIO
8 10 21 13 2.2.4 Door Hardware PRODUCT DATA FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
9 10 21 13 2.3.1 Toilet Enclosures PRODUCT DATA FIO
10 10 21 13 2.3.2 Urinal Screens PRODUCT DATA FIO
11 10 21 13 2.5 Pilaster Shoes PRODUCT DATA FIO
12 10 21 13 2.7 Colors and Finishes SAMPLES GA
13 10 21 13 2.2.3 Hardware and Fittings SAMPLES FIO
14 10 21 13 2.2.1 Anchoring Devices and Fasteners SAMPLES FIO
15 10 21 13 Warranty CERTIFICATES FIO
16 10 21 13 1.2 LEED Documentation CLOSEOUT SUBMTL FIO
17 10 21 13 2.3.1 Toilet Enclosures CLOSEOUT SUBMTL FIO
18 10 21 13 Room Entrance Screens CLOSEOUT SUBMTL FIO
19 10 21 13 2.3.2 Urinal Screens CLOSEOUT SUBMTL FIO
20 10 21 13 2.5 Pilaster Shoes CLOSEOUT SUBMTL FIO
SECTION - 10 26 13 WALL AND CORNER GUARDS
1 10 26 13 2.2 Corner Guards SHOP DRAWINGS GA
2 10 26 13 2.2 Corner Guards PRODUCT DATA GA
3 10 26 13 2.4 Finish SAMPLES GA
4 10 26 13 2.2 Corner Guards TEST REPORTS FIO
5 10 26 13 2.2 Corner Guards CERTIFICATES FIO
6 10 26 13 1.2 LEED Documentation CLOSEOUT SUBMTL FIO
SECTION - 10 28 13 TOILET ACCESSORIES
1 10 28 13 2.1.2 Finishes PRODUCT DATA GA
2 10 28 13 2.2 Accessory Items PRODUCT DATA GA
3 10 28 13 2.1.2 Finishes SAMPLES GA
4 10 28 13 2.2 Accessory Items SAMPLES GA
5 10 28 13 2.2 Accessory Items CERTIFICATES FIO
SECTION - 10 44 16 FIRE EXTINGUISHERS
1 10 44 16 2.1 Manufacturer's Data PRECON SUBMTL FIO
2 10 44 16 1.3.1 Accessories SHOP DRAWINGS FIO
3 10 44 16 Part 2 Cabinets SHOP DRAWINGS FIO
4 10 44 16 1.3.1 Wall Brackets SHOP DRAWINGS FIO
5 10 44 16 1.3.1 Accessories PRODUCT DATA FIO
6 10 44 16 Part 2 Cabinets PRODUCT DATA FIO
7 10 44 16 1.3.1 Wall Brackets PRODUCT DATA FIO
8 10 44 16 3.2.1 Replacement Parts PRODUCT DATA FIO
9 10 44 16 1.3.1 Cabinet SAMPLES FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
10 10 44 16 1.3.1 Wall Brackets SAMPLES FIO
11 10 44 16 1.3.1 Accessories SAMPLES FIO
12 10 44 16 2.1 Manufacturer's Warranty with Inspection CERTIFICATES FIO
SECTION - 10 56 00 Storage Assemblies
1 10 56 00 Shop Drawings SHOP DRAWINGS GA
2 10 56 00 Product Data PRODUCT DATA GA
3 10 56 00 Samples SAMPLES GA
4 10 56 00 Maintenance Manuals O&M DATA GA
SECTION - 12 21 00 WINDOW BLINDS
1 12 21 00 3.2 Installation SHOP DRAWINGS FIO
2 12 21 00 2.1 Window Blinds PRODUCT DATA GA
3 12 21 00 3.2 Installation PRODUCT DATA FIO
4 12 21 00 2.1 Window Blinds SAMPLES GA
5 12 21 00 2.1 Window Blinds TEST REPORTS FIO
6 12 21 00 2.1 Window Blinds MFRS INSTR GA
7 12 21 00 2.1 Window Blinds O&M DATA GA
8 12 21 00 1.2 LEED Documentation CLOSEOUT SUBMTL FIO
SECTION - 13 34 19 METAL BUILDING SYSTEMS
1 13 34 19 1.6.3 Manufacturer's Qualifications PRECON SUBMTL GA
2 13 34 19 1.6.1 Detail Drawings SHOP DRAWINGS GA
3 13 34 19 sustainable acquisition compliance PRODUCT DATA GA
4 13 34 19 1.6.1 Manufacturer's catalog data PRODUCT DATA GA
5 13 34 19 1.6.1 Coil Stock SAMPLES GA
6 13 34 19 2.1.7 Coil Stock SAMPLES GA
7 13 34 19 1.2.1.7 Roof Panels SAMPLES GA
8 13 34 19 2.5.1 Fasteners SAMPLES GA
9 13 34 19 2.7.1 Metal Closure Strips SAMPLES GA
10 13 34 19 Insulation SAMPLES GA
11 13 34 19 Vapor Barrier SAMPLES GA
12 13 34 19 2.4.2 Manufacturer's color charts and chips SAMPLES GA
13 13 34 19 1.6.1 descriptive and technical literature DESIGN DATA GA
14 13 34 19 1.6.1 building design analysis DESIGN DATA GA
15 13 34 19 1.6.1 test reports TEST REPORTS GA
16 13 34 19 1.6.1 Coatings and base metals TEST REPORTS GA
17 13 34 19 1.6.1 Factory Color Finish Performance Require TEST REPORTS GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
18 13 34 19 1.6.1 system components CERTIFICATES GA
19 13 34 19 1.6.1 Coil Stock CERTIFICATES GA
20 13 34 19 2.1.7 Coil Stock CERTIFICATES GA
21 13 34 19 1.6.1 Aluminized Steel Repair Paint CERTIFICATES GA
22 13 34 19 1.6.1 Galvanizing Repair Paint CERTIFICATES GA
23 13 34 19 1.6.1 Enamel Repair Paint CERTIFICATES GA
24 13 34 19 1.6.1 Qualification of Manufacturer CERTIFICATES GA
25 13 34 19 1.6.1 Qualification of Erector CERTIFICATES GA
26 13 34 19 1.6.2 Installation of Roof panels MFRS INSTR GA
27 13 34 19 1.7 shipping, handling, and storage MFRS INSTR GA
28 13 34 19 3.11.1 Manufacturer's Warranty CLOSEOUT SUBMTL GA
29 13 34 19 3.11.2 Contractor's Warranty for Installation CLOSEOUT SUBMTL GA
SECTION - 13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
1 13 48 00 3.4 Resilient Vibration Isolation Devices SHOP DRAWINGS GA
2 13 48 00 3.1 Bracing PRODUCT DATA FIO
3 13 48 00 2.1 Equipment Requirements PRODUCT DATA FIO
4 13 48 00 3.3 Anchor Bolts TEST REPORTS GA
SECTION - 21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
1 21 13 13.00 10 1.4.3 Shop Drawings SHOP DRAWINGS GA
2 21 13 13.00 10 3.9 As-Built Drawings SHOP DRAWINGS FIO
3 21 13 13.00 10 1.4.1 Fire Protection Related Submittals PRODUCT DATA FIO
4 21 13 13.00 10 2.3 Materials and Equipment PRODUCT DATA GA
5 21 13 13.00 10 1.6 Spare Parts PRODUCT DATA FIO
6 21 13 13.00 10 3.8 Preliminary Tests PRODUCT DATA GA
7 21 13 13.00 10 3.9 Final Acceptance Test PRODUCT DATA GA
8 21 13 13.00 10 3.10 Onsite Training PRODUCT DATA GA
9 21 13 13.00 10 1.4.1 Fire Protection Specialist PRODUCT DATA GA
10 21 13 13.00 10 1.4.2 Sprinkler System Installer PRODUCT DATA GA
11 21 13 13.00 10 1.4.3 Sway Bracing DESIGN DATA GA
12 21 13 13.00 10 1.2.1.3 Hydraulic Calculations DESIGN DATA GA
13 21 13 13.00 10 3.8 Preliminary Test Report TEST REPORTS FIO
14 21 13 13.00 10 3.9 Final Acceptance Test Report TEST REPORTS FIO
15 21 13 13.00 10 3.3 Inspection by Fire Protection Specialist CERTIFICATES FIO
16 21 13 13.00 10 3.10 Operating and Maintenance Manuals O&M DATA GA
SECTION - 22 00 00 PLUMBING, GENERAL PURPOSE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
1 22 00 00 3.7.1 Plumbing System SHOP DRAWINGS GA
2 22 00 00 2.4 Fixtures PRODUCT DATA FIO
3 22 00 00 2.4.2 Flush valve water closets PRODUCT DATA GA
4 22 00 00 2.4.3 Wall hung lavatories PRODUCT DATA GA
5 22 00 00 2.4.4 Countertop lavatories PRODUCT DATA GA
6 22 00 00 2.4.5 Kitchen sinks PRODUCT DATA FIO
7 22 00 00 2.9 Water heaters PRODUCT DATA GA
8 22 00 00 2.10 Pumps PRODUCT DATA GA
9 22 00 00 3.7.1.1 Backflow prevention assemblies PRODUCT DATA GA
10 22 00 00 2.6.2 Shower Head PRODUCT DATA GA
11 22 00 00 3.7.1 Plumbing System PRODUCT DATA FIO
12 22 00 00 3.7 Tests, Flushing and Disinfection TEST REPORTS FIO
13 22 00 00 3.7.1.1 Test of Backflow Prevention Assemblies TEST REPORTS GA
14 22 00 00 1.3 Materials and Equipment CERTIFICATES FIO
15 22 00 00 2.1.1 Bolts CERTIFICATES FIO
16 22 00 00 2.9 Water Heaters CERTIFICATES FIO
17 22 00 00 2.9 Water Heaters CERTIFICATES FIO
18 22 00 00 3.7.1 Plumbing System O&M DATA GA
SECTION - 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
1 23 00 00 1.4.5 Detail Drawings SHOP DRAWINGS GA
2 23 00 00 2.8.1.1 Metallic Flexible Duct PRODUCT DATA FIO
3 23 00 00 Duct Connectors PRODUCT DATA FIO
4 23 00 00 2.8.2 Duct Access Doors PRODUCT DATA GA
5 23 00 00 2.8.3 Fire Dampers PRODUCT DATA FIO
6 23 00 00 2.8.4 Manual Balancing Dampers PRODUCT DATA GA
7 23 00 00 2.8.8 Sound Attenuation Equipment PRODUCT DATA FIO
8 23 00 00 2.8.8.2 Acoustical Duct Liner PRODUCT DATA FIO
9 23 00 00 2.8.9.1 Diffusers PRODUCT DATA FIO
10 23 00 00 2.8.9.2 Registers and Grilles PRODUCT DATA FIO
11 23 00 00 2.8.10 Louvers PRODUCT DATA FIO
12 23 00 00 2.8.11 Air Vents, Penthouses, and Goosenecks PRODUCT DATA FIO
13 23 00 00 2.9.1.1 Centrifugal Fans PRODUCT DATA FIO
14 23 00 00 2.9.1.2 In-Line Centrifugal Fans PRODUCT DATA FIO
15 23 00 00 2.9.1.4 Ceiling Exhaust Fans PRODUCT DATA FIO
16 23 00 00 2.10 Air Handling Units PRODUCT DATA GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
17 23 00 00 2.11.1.1 Variable Volume, Single Duct Terminal Un PRODUCT DATA GA
18 23 00 00 1.4.6 Test Procedures PRODUCT DATA FIO
19 23 00 00 1.2.1.2 Diagrams PRODUCT DATA GA
20 23 00 00 3.11 Performance Tests TEST REPORTS GA
21 23 00 00 3.9 Damper Acceptance Test TEST REPORTS GA
22 23 00 00 Bolts CERTIFICATES FIO
23 23 00 00 1.4.7 Certification CERTIFICATES FIO
24 23 00 00 3.2 Manufacturer's Installation Instructions MFRS INSTR FIO
25 23 00 00 3.13.2 Operation and Maintenance Training MFRS INSTR FIO
26 23 00 00 3.13.1 Operation and Maintenance Manuals O&M DATA GA
27 23 00 00 2.8.3 Fire Dampers O&M DATA GA
28 23 00 00 2.8.4 Manual Balancing Dampers O&M DATA GA
29 23 00 00 2.9.1.1 Centrifugal Fans O&M DATA GA
30 23 00 00 2.9.1.2 In-Line Centrifugal Fans O&M DATA GA
31 23 00 00 2.9.1.4 Ceiling Exhaust Fans O&M DATA GA
32 23 00 00 2.10 Air Handling Units O&M DATA GA
33 23 00 00 2.11.1.1 Variable Volume, Single Duct Terminal Un O&M DATA GA
34 23 00 00 Variable Volume, Single Duct, Fan-Powere O&M DATA GA
SECTION - 23 05 15 COMMON PIPING FOR HVAC
1 23 05 15 1.2 Material, Equipment, and Fixture Lists PRECON SUBMTL GA
2 23 05 15 1.2 Record Drawings SHOP DRAWINGS GA
3 23 05 15 1.2 Connection Diagrams SHOP DRAWINGS GA
4 23 05 15 1.2 Coordination Drawings SHOP DRAWINGS GA
5 23 05 15 1.2 Fabrication Drawings SHOP DRAWINGS GA
6 23 05 15 3.1 Installation Drawings SHOP DRAWINGS GA
7 23 05 15 2.2 Pipe and Fittings PRODUCT DATA GA
8 23 05 15 2.3 Piping Specialties PRODUCT DATA GA
9 23 05 15 2.4 Valves PRODUCT DATA GA
10 23 05 15 2.5 Miscellaneous Materials PRODUCT DATA GA
11 23 05 15 2.6 Supporting Elements PRODUCT DATA GA
12 23 05 15 1.2 Equipment Foundation Data PRODUCT DATA GA
13 23 05 15 1.2 Manufacturer's Standard Color Charts SAMPLES GA
14 23 05 15 2.2 Pipe and Fittings DESIGN DATA GA
15 23 05 15 2.3 Piping Specialties DESIGN DATA GA
16 23 05 15 2.4 Valves DESIGN DATA GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
17 23 05 15 3.1 Hydrostatic Tests TEST REPORTS GA
18 23 05 15 3.1 Air Tests TEST REPORTS GA
19 23 05 15 3.1 Valve-Operating Tests TEST REPORTS GA
20 23 05 15 3.1 Drainage Tests TEST REPORTS GA
21 23 05 15 3.1 Pneumatic Tests TEST REPORTS GA
22 23 05 15 3.1 Non-Destructive Electric Tests TEST REPORTS GA
23 23 05 15 3.1 System Operation Tests TEST REPORTS GA
24 23 05 15 1.4.2 Record of Satisfactory Field Operation CERTIFICATES GA
25 23 05 15 1.4.3 List of Qualified Permanent Service Orga CERTIFICATES GA
26 23 05 15 1.2 Listing of Product Installations CERTIFICATES GA
27 23 05 15 1.2 Records of Existing Conditions CERTIFICATES GA
28 23 05 15 3.1 Surface Resistance CERTIFICATES GA
29 23 05 15 3.1 Shear and Tensile Strengths CERTIFICATES GA
30 23 05 15 3.1 Temperature Ratings CERTIFICATES GA
31 23 05 15 3.1 Bending Tests CERTIFICATES GA
32 23 05 15 3.1 Flattening Tests CERTIFICATES GA
33 23 05 15 3.1 Transverse Guided Weld Bend Tests CERTIFICATES GA
34 23 05 15 3.12 Operation and Maintenance Manuals O&M DATA GA
SECTION - 23 05 48.00 40 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIP
1 23 05 48.00 40 1.2 Installation Drawings SHOP DRAWINGS GA
2 23 05 48.00 40 1.2 Outline Drawings SHOP DRAWINGS GA
3 23 05 48.00 40 1.2 Equipment and Performance Data PRODUCT DATA GA
4 23 05 48.00 40 2.3 Isolators PRODUCT DATA GA
5 23 05 48.00 40 2.1 Type of Isolator TEST REPORTS GA
6 23 05 48.00 40 2.1 Type of Base TEST REPORTS GA
7 23 05 48.00 40 2.1 Allowable Deflection TEST REPORTS GA
8 23 05 48.00 40 2.1 Measured Deflection TEST REPORTS GA
SECTION - 23 05 93 Testing, Adjusting, and Balancing for HVAC
1 23 05 93 1.3 Records of Existing Conditions PRECON SUBMTL GA
2 23 05 93 1.3.3 Records of Existing Conditions PRECON SUBMTL GA
3 23 05 93 1.5.4.1 TAB Firm PRECON SUBMTL GA
4 23 05 93 1.2 TAB team assistants PRECON SUBMTL GA
5 23 05 93 1.2 TAB team engineer PRECON SUBMTL GA
6 23 05 93 1.5.4.2 TAB Specialist PRECON SUBMTL GA
7 23 05 93 1.2 TAB team field leader PRECON SUBMTL GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
8 23 05 93 1.3.3 TAB Schematic Drawings and Report Forms SHOP DRAWINGS GA
9 23 05 93 1.3 Equipment and Performance Data PRODUCT DATA GA
10 23 05 93 1.5.4.4 TAB Related HVAC Submittals PRODUCT DATA GA
11 23 05 93 1.5.2 TAB Procedures PRODUCT DATA GA
12 23 05 93 1.5.2 Calibration PRODUCT DATA GA
13 23 05 93 1.3.3 Systems Readiness Check PRODUCT DATA GA
14 23 05 93 1.5.5 TAB Execution PRODUCT DATA GA
15 23 05 93 TAB Verification PRODUCT DATA GA
16 23 05 93 TAB Work Execution Schedule TEST REPORTS GA
17 23 05 93 3.5 TAB Procedures Summary TEST REPORTS GA
18 23 05 93 1.3.3 Design review report TEST REPORTS GA
19 23 05 93 1.7.2.1 Design review report TEST REPORTS GA
20 23 05 93 3.5 Design review report TEST REPORTS GA
21 23 05 93 TAB report for TEST REPORTS GA
22 23 05 93 1.5.1 Independent TAB agency and personnel qua CERTIFICATES GA
23 23 05 93 1.5.1 Independent TAB agency and personnel qua CERTIFICATES GA
24 23 05 93 3.5 Advance Notice of TAB Field Work CERTIFICATES GA
25 23 05 93 3.5 Completed Pre-TAB Work Checklist CERTIFICATES FIO
26 23 05 93 3.5 Completed Pre-TAB Work Checklist CERTIFICATES FIO
27 23 05 93 1.5.4.1 TAB Firm CERTIFICATES GA
28 23 05 93 1.7.1 TAB Submittal and Work Schedule CERTIFICATES GA
29 23 05 93 1.7.2 TAB Submittal and Work Schedule CERTIFICATES GA
30 23 05 93 1.3.3 Design review report CERTIFICATES GA
31 23 05 93 1.7.2.1 Design review report CERTIFICATES GA
32 23 05 93 3.5 Design review report CERTIFICATES GA
33 23 05 93 1.7.2.2 Pre-field TAB engineering report CERTIFICATES GA
34 23 05 93 1.7.2 Advanced notice for TAB field work CERTIFICATES GA
35 23 05 93 1.7.2 Prerequisite HVAC Work Check Out List CERTIFICATES GA
SECTION - 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
1 23 07 00 3.2.2.4 MICA Plates SHOP DRAWINGS GA
2 23 07 00 2.3 Pipe Insulation Systems SHOP DRAWINGS FIO
3 23 07 00 3.2 Pipe Insulation Systems SHOP DRAWINGS FIO
4 23 07 00 3.3 Duct Insulation Systems SHOP DRAWINGS FIO
5 23 07 00 3.4 Equipment Insulation Systems SHOP DRAWINGS FIO
6 23 07 00 1.4.2 Certification PRODUCT DATA FIO
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA,
CR, or S
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Building 1930 Renovation
W912PM-16-B-0019 NA
16 Sep 2016
SORT : SECTION & ITEMRANGE : ALL
7 23 07 00 2.3 Pipe Insulation Systems PRODUCT DATA GA
8 23 07 00 3.2 Pipe Insulation Systems PRODUCT DATA GA
9 23 07 00 3.3 Duct Insulation Systems PRODUCT DATA GA
10 23 07 00 3.4 Equipment Insulation Systems PRODUCT DATA GA
11 23 07 00 2.2.1.3 Thermal Insulation SAMPLES GA
12 23 07 00 3.1.1 Display Samples SAMPLES GA
13 23 07 00 2.3 Pipe Insulation Systems MFRS INSTR GA
14 23 07 00 3.2 Pipe Insulation Systems MFRS INSTR GA
15 23 07 00 3.3 Duct Insulation Systems MFRS INSTR GA
16 23 07 00 3.4 Equipment Insulation Systems MFRS INSTR GA
SECTION - 23 08 00.00 10…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .