W912PM-16-B-0009-0001.pdf
PDF 57 KB Posted
- Attached to
- Maintenance Dredging, Wilmington Harbor Outer Ocean Bar Federal contract opportunity
- Solicitation number
- W912PM-16-B-0009
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16-B-0009WH-OOBidAbstract.pdf | ||
| W912PM-16-B-0009-0002_signed.pdf | ||
| BH3_AfterDredgeSurvey_2015-01-25_All.xyz | XYZ file | |
| W912PM-16-B-0009-0001_CC.pdf | ||
| ADV_Plans.pdf | ||
| ADV_Spec.pdf | ||
| wil_southport_2016-03-29cs_All.xyz | XYZ file | |
| wil_bh3_04-01-2016cs_All.xyz | XYZ file | |
| wil_batteryisland_2016-04-01cs_All.xyz | XYZ file | |
| wil_BH3_2016-03-31AD_All.xyz | XYZ file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81LJ861128533
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912PM-16-B-0009 ENTITLED MAINTENANCE DREDGING, WILMINGTON HARBOR, OUTER OCEAN BAR, BRUNSWICK AND NEW HANOVER COUNTY, NORTH CAROLINA is hereby amended as follow s:
A.) See Summary of Changes B.) The time and date for bid opening remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-B-0009
X 9B. DATED (SEE ITEM 11)
07-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jun-2016
CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM-16-B-0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SUMMARY OF CHANGES
(End of Summary of Changes)
W912PM-16-B-0009
Amendment 0001
Technical Summary of Changes
35 20 23 – DREDGING
Delete existing Pages 7 thru 11 in their entirety and replace with revised liked number Pages.
NOTE:
Text that is added or revised by this amendment is identified with ***Amendment 0001(beginning and ending of revision/addition) and printed in bold.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
-- End of Summary of Changes- -
Encls As Stated
Maint Drdg Wilmington Harbor Outer Ocean Bar W912PM-16-B-0009 Brunswick County, North Carolina the Contracting Officer or his/her designated representative.
1.12.4 Method of Survey
Hydrographic surveys will be accomplished by the Government to determine the volume of material removed under this contract. The surveys will be accomplished with the use of an automated survey system installed aboard one of the Wilmington District's survey vessels. Vertical datum for all hydrographic surveys will be mean lower low water.
****Amendment 0001****
1.12.4.1 Singlebeam Surveying Method
The singlebeam survey system will be used. Horizontal location of survey lines and depth sounding points will be determined by the use of an automated positioning system utilizing RTK GPS (real time kinematic global positioning system). Depth soundings will be taken using a dual frequency (200/28 KHz) depth sounder. The fathometer will be calibrated using velocity casts to account for variations of the speed of sound in the water at the survey site and compared to periodic bar checks for consistency.
Payment for material removed from Baldhead Shoal Channel Reach 3 will be based on 28 kHz depth soundings. Payment for material removed from Southport Channel and Battery Island Channel will be based on 200 kHz depth soundings. The echo sounder system will be calibrated at the job site and verified for accuracy twice daily.
****Amendment 0001****
1.12.4.2 Survey Lines
Depth soundings will be secured by running survey lines parallel to the longitudinal axis of the channel. A sufficient number of lines will be run to assure good coverage of the bottom. Cross check lines will be run at 500' intervals. A minimum of two (2) lines will be run within the grade slopes. The after dredging survey will be performed in the same manner as the before dredging survey.
1.13 TIDE DATA
1.13.1 Real Time Kinematic (RTK) GPS
Real Time Kinematic (RTK) GPS will be used by the Corps of Engineers to determine real time water levels (tide corrections) in the Wilmington Harbor Project area. If the Contractor desires to obtain these corrections, he/she shall be responsible for providing navigation equipment capable of utilizing the transmitted signals from North Carolina Geodetic Surveys Continuously Operating Reference Station Network. Contact Mr. Bart Alligood (System Administrator) for access at 919-948-7834.
1.13.2 Kinematic Tidal Datum
A file listing the separations between the Reference Ellipsoid and the Chart Datum (Mean Lower Low Water for Wilmington Harbor) will be provided to the Contractor for entry into the hydrographic survey software. A Tidal Datum Diagram showing the relationship between NAVD 88 and Mean Lower Low Water for Wilmington Harbor will be provided upon request.
SECTION 35 20 23 Page 7 (Revised by Amendment 0001)
1.13.3 RTK GPS Disputes
Any discussions or dispute regarding the validity and use of this method of surveying and determining of real time tides must be resolved prior to the commencement of dredging on this project.
1.14 PLANT
Dredging shall be performed by ocean certified hopper dredge. See Section 01 10 00.10 38 paragraph PLANT for additional requirements for the plant to be used on the project.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 DREDGE POSITIONING SYSTEM
Each dredge shall be equipped with an electronic positioning system, capable of positioning the dredge in the channel with accuracies as shown in Table 3.1 Minimum Performance Standards for Corps of Engineers Hydrographic Surveys (Mandatory) in USACE EM 1110-2-1003. This positioning system shall be established, operated, and maintained by the Contractor during the entire period of the contract. The positioning system shall be used to precisely locate the dredge and dragarm, and shall be capable of displaying and recording the dredge's location in an acceptable coordinate system which can be related to, or is directly based on, the North Carolina Lambert State Plane Coordinate System (NAD 1983, State Plane feet).
Navigation channel control, and shore station control, if required, will be provided to the Contractor in the same North Carolina Coordinate System prior to the commencement of work. It shall be the responsibility of the Contractor to have the positioning/navigation system reviewed, inspected and approved by the Contacting Officer or his/her designated representative prior to the commencement of work.
3.2 QUANTITIES SUMMARY
The quantities listed in Attachment 1 - Quantities Summary include the volumes present at the time of the surveys indicated in the contract drawings plus shoaling anticipated before dredging begins.
Should the total quantity of material to be paid for under the contract exceed the limit established in the clause entitled "VARIATIONS IN ESTIMATED QUANTITIES - DREDGING", additional time will be allowed at the rate of one (1) calendar day for the average daily production rate achieved by the equipment used on the project for excavation in excess of the established limit.
3.3 DISPOSAL OF DREDGED MATERIAL
The Government furnished disposal area available to the Contractor for disposal of dredged material is the Ocean Dredged Material Disposal Site
(ODMDS).
3.3.1 Wilmington Harbor Ocean Dredged Material Disposal Site (ODMDS)
Disposal of dredged material from the Wilmington Harbor channels shall be
SECTION 35 20 23 Page 8 in the Ocean Dredged Material Disposal Site (ODMDS) within the designated disposal zone shown on the drawings. Disposal shall be conducted in such a manner that water above the dumped material will have a minimum clearance of 30 feet at mean lower low water (MLLW). In order to maximize ODMDS capacity and minimize mounding of material, the dumps shall be scattered throughout the designated disposal zone and not placed repeatedly at one location. This shall be accomplished by dividing the disposal zone into quadrants and placing successive dump loads into successive quadrants.
3.4 DREDGED MATERIAL DISPOSAL PLAN
Prior to commencement of dredging and disposal operations, the Contractor shall submit to the Contracting Officer or his/her designated representative a disposal plan for dredged material. The plan shall include but not be limited to the following:
a. procedures for maximizing the ODMDS disposal zone capacity and minimizing mounding of material (reference subparagraph Wilmington Harbor Ocean Dredged Material Disposal Site (ODMDS))and anticipated disposal volume.
b. procedures for recording verification of ocean disposal in the ODMDS disposal zone and ensuring minimum clearance is provided (see paragraph DREDGE POSITIONING SYSTEM and Section 35 20 23.23 NATIONAL
DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE).
c. anticipated cycle times and disposal vessel route to and from the ODMDS (reference paragraph REQUIRED TRANSPORTATION ROUTE).
3.5 EMERGENCY DUMPS
If a vessel experiences an emergency situation which causes a dumping of material outside of the designated disposal zone, the Contractor shall verbally notify the Contracting Officer or his/her designated representative no later than the next work day. The Contractor shall submit, in writing within two (2) days of the emergency dump, a statement detailing time of dump, location of dump, and reason dump occurred.
Material that is misplaced due to an emergency dump situation is subject to removal by the Contractor at his own expense upon the request of the Contracting Officer or his/her designated representative.
3.6 REQUIRED TRANSPORTATION ROUTE
For surface vessel transportation of dredged material to the Ocean Dredged Material Disposal Site (ODMDS) disposal zone, the vessel(s) shall travel in the buoyed navigation channel until they are seaward of Buoy "2". These vessels shall return to the site of work by the same route.
3.7 DEBRIS SCREENING
The Contractor may encounter wood and other debris within the dredging limits. The wooden debris may consist of tree trunks, stumps, roots, and limbs. The size of the wood may vary considerably. All wood debris material captured on or in the hopper dredge dragheads shall be removed and placed in a separate barge or other conveyance and disposed of in a public or private upland disposal area in accordance with all applicable Federal, State, and local laws and regulations. Bidders are expected to investigate the availability of disposal areas and any restrictions associated with each prior to submitting their bids.
SECTION 35 20 23 Page 9
3.8 FENDER TIRES
All fender tires used on Contractor dredging equipment or vessels shall be permanently marked by the Contractor with the company name and equipment plant name. All fender tires shall be securely attached to prevent them from falling overboard. The Contractor shall be responsible for damages to fishing nets or other claims that are due to any loss of equipment such as fenders, cables, anchors, pipe, etc.
3.9 COMPLIANCE WITH APPLICABLE NAVIGATION RULES AND REGULATIONS, MARINE
EQUIPMENT
The Contractor shall ascertain that all vessels used in performance of this contract are commanded, equipped, navigated and/or operated in strict compliance with the general regulations of the Department of the Army and of the U.S. Coast Guard, including but not limited to, applicable safety, environmental, and navigational rules and regulations in the Code of Federal Regulations.
3.10 DREDGE CERTIFICATION
This contract requires the use of the Dredging Quality Management Program Prior to submitting bid, see SECTION 35 20 23.23: NATIONAL DREDGING QUALITY
MANAGEMENT PROGRAM HOPPER DREDGE.
3.11 WATER POLLUTION CONTROL
3.11.1 Contamination of Water
The Contractor shall not pollute the channels or disposal area with paints, fuels, oil, bitumens, calcium chlorides, insecticides, herbicides, or any other substance, which may be considered harmful to fish, shellfish, or wildlife. It is the responsibility of the Contractor to investigate and comply with all applicable Federal, State, County, and municipal laws concerning pollution of rivers and streams and health protection of shellfish, fish, and domestic animals.
3.11.2 Disposal of Materials
The methods and locations of disposal of materials, wastes, effluents, trash, garbage, oil, grease, chemicals, etc., shall be such that harmful agents will not enter the waterway, ocean, and sound by erosion and shall be subject to approval by the Contracting Officer or his/her designated representative.
3.12 FLOATING PLANT INSPECTION AND CERTIFICATION
Floating plant inspection and certification shall comply with paragraph 19.A.01 of USACE EM 385-1-1.
3.13 REPORTING REQUIREMENT
The Contractor shall prepare daily a "Report of Operations" in the Resident Management System (RMS). The Contractor shall furnish daily a copy or copies of any Contractor forms or operational reports he routinely requires to be submitted by his field personnel.
SECTION 35 20 23 Page 10
3.14 COMMUNICATIONS
The Contractor shall furnish and maintain a radiotelephone and a cellular phone on the dredge(s) throughout the period of the contract. The plant will not be allowed to begin work until the VHF marine band radio is installed and in good working order and a properly operating cellular phone is on board. The VHF marine band radio shall be capable of operation from the dredge's main control station and capable of transmitting and receiving on a frequency or frequencies within the 156-162 megahertz band using the classes of emissions designated by the Federal Communications Commission.
3.15 LOCAL OFFICE
The Contractor shall maintain an office in the immediate vicinity of the project. This office shall be equipped with at least one operable telephone and fax machine, which provides both local and long distance service. The number for this equipment shall be provided to the Contracting Officer or his/her designated representative during the preconstruction conference, and the telephone shall be monitored and answered by contractor personnel during working hours. This requirement may be waived by the Contracting Officer or his/her designated representative if suitable facilities are available on the dredge.
3.16 QUALITY CONTROL
The Contractor shall establish and maintain quality control for the dredging and all other operations in connection therewith to assure compliance with contract requirements. The Contractor shall inspect for compliance with contract requirements and record the inspection of all operations including but not limited to the following:
Dredging is confined within the limits shown on the drawings.
Disposal of material is in accordance with the Dredge Material Disposal Plan.
A copy of these quality control records, as well as the records of corrective action taken shall be furnished the Government as directed by the Contracting Officer or his/her designated representative.
-- End of Section --
SECTION 35 20 23 Page 11