Appendices_N_-_R.pdf
PDF 5 MB Posted
- Attached to
- HC-130J Wash Rack Federal contract opportunity
- Solicitation number
- W912PL-16-R-0016
About this file
Appendices N - R
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PL-16-R-0016_Amendment_3.pdf | ||
| W912PL-16-R-0016_Am2.pdf | ||
| W912PL-16-R-0016_Am1_Combined.pdf | ||
| Copy_of_Special_Event_EAL_Sample_2015_(3)_-_Copy.xls | XLS spreadsheet | |
| Appendices_A_-_L.pdf | ||
| Appendix_M_(Part_1).pdf | ||
| Appendix_M_(Part_2).pdf | ||
| Wash_Rack_Solicitation_ _Specifications_Vol_1_of_2Revised.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX N
DRAFTING STANDARDS
VIII-i
CHAPTER VIII
DRAWINGS
Table of Contents
1. PURPOSE AND SCOPE
2. REFERENCES
3. CADD OPERATING PROCEDURES
3.1 CADD Software
3.2 CADD Standards
3.3 Graphic Files
3.3.1 Drawing CADD Files
3.3.2 File Naming Convention
3.3.3 CADD Conventions
3.3.4 Drawing Size
3.3.5 Title Blocks/Borders
3.3.6 Units
3.3.7 Scale
3.3.8 Numbering
3.3.9 Drawing Seals and Signatures
3.3.10 Amendments to Drawings
3.3.11 Construction Modifications
3.3.12 Drawing Submittal Media
4. TYPES OF DRAWINGS
4.1 Budget Type Sketches/Drawings
4.2 Site-Adapted Drawings
4.3 Standard Drawings
4.3.1 Field Standards
4.3.2 Regional Standards
4.3.3 HQUSACE Standards
4.4 Project Drawings
4.4.1 Schematics/Sketches
4.4.2 Army Project Engineering and Air Force
Project Definition
4.4.3 Army Concept
4.4.4 Final and Corrected Final Drawings
4.4.5 Demolition Drawings
4.4.6 As-Built Plans
5. FORMAT OF PLANS
5.1 Arrangement of Drawings
5.2 Cover Sheet
5.3 Index of Drawings
5.4 Project Vicinity, Location and Haul Route
VIII-ii
5.5 Legends and Symbols
6. DRAWING STANDARDS
6.1 Scale
6.2 Lettering
6.3 Sheet Numbers
6.4 North Arrows
6.5 Titles
6.6 Section and Detail Cross Reference
6.7 Photographs
6.8 Dimensions/Grid
6.9 Finished Drawings/Checking
6.10 Reproduction Process
6.11 Electronic Bid Set
7. PROJECT DRAWING DATA
7.1 Project Site Plans
7.2 Floor Plans
7.3 Fire Protection Plans
7.4 Room Finish/Color Schedules
7.4.1 Interior Schedules
7.4.2 Exterior Schedules
7.5 Elevations
7.6 Longitudinal and Cross-Sections
7.7 Wall Sections
7.8 Doors
7.8.1 Door Schedules
7.9 Windows and Schedules
7.10 Roof Plans
7.11 Ceiling Plans
7.12 Sections and Details
7.13 Equipment Schedules
8. AMENDMENTS AND MODIFICATIONS
VIII-1
Chapter VIII
DRAWINGS
1. PURPOSE AND SCOPE. This guidance establishes uniform drawing standards for Architect-Engineers (A-E), design-build contractors and Government personnel preparing design, engineering and construction documents, other than shop drawings. These standards are to facilitate preparation, review and a clear understanding of the contract documents.
2. REFERENCES:
2.1 ER 1110-345-700 Engineering and Design, Design
Analysis, Drawings and Specifications, Appendix C, Drawings.
2.2 A/E/C CADD Standards (current release). A copy of the
standards can be downloaded from the Internet at https://cadbim.usace.army.mil/CAD. The Albuquerque District has a Supplemental Standard to the A/E/C CADD Standards located at http://www.spa.usace.army.mil/Missions/EngineeringandConstructi on/CADStandards.aspx. This document will provide clarification and information not covered in the A/ E/C CADD Standard.
3. CADD OPERATING PROCEDURES. All original and finished drawings will be produced using Computer-Aided Design and Drafting (CADD). Existing hard copy data to be included in construction projects shall be scanned to raster format (minimum, vector preferred) and submitted with all required electronic files.
3.1 CADD Software. The basic software package used to create
contract drawings shall be Bently Inc.'s, MicroStation→ or Autodesk's AutoCad→, as specified by the supervising district. Manually drawn sketches may be used for schematic and preliminary studies.
3.2 CADD Standards. The A/E/C CADD Standards Manual was
developed by the CADD/BIM Technology Center to reduce redundant CADD standardization efforts within the Army, Navy, Air Force, and Corps of Engineers. The manual consolidates various CADD standards used in the Corps of Engineers into a generic format to operate under various CADD software packages (such as MicroStation and AutoCAD) and to incorporate existing industry and national standards.
https://cadbim.usace.army.mil/CAD http://www.spa.usace.army.mil/Missions/EngineeringandConstruction/CADStandards.aspx
VIII-2
3.3 Graphic Files.
3.3.1 Drawing CADD Files. Each graphic file should contain the contents of only one drawing (sequence numbered sheet). The architectural floor plan, site master plan, mechanical master plan, electrical master plan, etc., will each be constructed in a separate CADD file. These plans will not be split between two or more CADD files. Designers will use these floor plans/master plans as reference files and not copy them into their sheet design file. This will facilitate the incorporation of plan changes.
3.3.2 File Naming Convention. File names shall be as indicated in the A/E/C CADD standard, the Supplemental Standard and/or supervising district standard. The Architect-Engineer should obtain the file naming convention to be used for a particular contract from the district's project Technical Leader.
3.3.3 CADD Conventions. Architect-Engineer will use the CADD
level/layer convention, line symbologies, font libraries, and color tables as indicated in the A/E/C CADD standard or as required by the project’s supervising district. The Architect- Engineer should obtain the CADD conventions to be used for a particular contract from the district's project Technical Leader.
3.3.4 Drawing Size. Drawing sizes shall be as indicated in the A/E/C CADD standard and/or supervising district CADD standards.
Sketches or reduced size drawings for design brochures should be copying size 8-1/2"x 11" or 11"x17".
3.3.5 Title Blocks/Borders. Standard CADD title blocks and
border files for contract documents shall be obtained from the Albuquerque District web page at http://www.spa.usace.army.mil/Missions/EngineeringandConstructi on/CADStandards.aspx furnished to the A-E by the district project Technical Leader in the supervising district.
3.3.6 Units. Unless otherwise directed, drawings shall use the English System of Units. Additions/modifications to existing facilities may be done in the metric International System of Units (SI) to match the units used in the original facility construction if directed by the supervising district.
3.3.7 Scale. Appropriate scales shall be used to produce
clearly legible drawing and shall conform to the A/E/C CADD standard and/or supervising district. See paragraph 6.1 for conventional scale standards.
VIII-3
3.3.8 Numbering. Sheet numbers, sequence numbers, and CADD file names shall be as indicated in the A/E/C CADD standard, the Supplemental Standard and/or supervising district standards. All design submittals require sheet numbers. See paragraph 6.2 below. Final design and all subsequent design submittals also require sequence numbers. The CADD file name and plot date shall be shown on the border under the title block on all drawings.
3.3.9 Drawing Seals and Signatures. Architect-Engineer designed drawings should each be sealed, signed, and dated by the responsible designer. Electronic duplications of seals are acceptable. However, original, handwritten signatures on plotted record drawings are required.
3.3.10 Amendments to Drawings. Architect-Engineer shall make
amendment revisions to the most recent CADD drawings contents and title block. Unless other procedures established by the supervising district are furnished to the A-E, the A-E shall follow the procedures of the US Army Corp of Engineers Albuquerque District. These procedures can be obtained at http://www.spa.usace.army.mil/Missions/EngineeringandConstructio n/CADStandards.aspx.
3.3.11 Construction Modifications. The Architect-Engineer will be requested to make construction modifications by the district Technical Leader. Modifications will be posted using procedures similar to the amendment posting procedures described above.
These procedures can be obtained at http://www.spa.usace.army.mil/Missions/EngineeringandConstructi on/CADStandards.aspx.
3.3.12 Drawing Submittal Media. The supervising district shall establish the appropriate media and number of copies for submission of final drawings, and for other required submittals and include these requirements in the A-E Contract. These may be CADD files in .dgn or .dwg format, CAL files, CD-ROM with drawing files (and specifications), and full size or half-size hard copy drawings. If required by contract hard copy Vellum drawings, plotted from CAL files. Each submittal of CADD files shall contain an EXCEL spreadsheet containing the drawing number, sequence number, level/layer assignments, line colors, line weights, line types and any other workspace settings used for every drawing.
4. TYPES OF DRAWINGS
4.1 Budget Type Sketches/Drawings. Budget type
sketches/drawings are single-line diagrams for estimating costs and programming projects. These drawings are normally reduced for presentation in 8 1/2" x 11" Project http://www.spa.usace.army.mil/Missions/EngineeringandConstruction/CADStandards.aspx http://www.spa.usace.army.mil/Missions/EngineeringandConstruction/CADStandards.aspx
VIII-4
Engineering (PE), Project Development Brochures (PDB), Army or Requirements and
VIII-5
Management Plan (RAMP), Air Force. Minimum size lettering will therefore be equal to 12 point type size after reproduction.
Functional data, controlling dimensions and gross area will be shown.
4.2 Site-Adapted Drawings. Site-adapted drawings are plans from a prior project. The level of implementation will be technically coordinated by district staffs. Typically site-adapted plans will be reviewed by each design discipline for updating to current criteria for the specific construction site. Site-adapted drawing title blocks shall be changed by deleting the original AE name and seal, replacing the project name with the current project name, deleting all amendment and modification notations and symbols throughout the drawing, and adding a note above the title block indicating the project from which the drawing has been site adapted.
4.3 Standard Drawings. Standard drawings are fully developed
plans and complete details for use in repeated locations or for site adaptation as follows:
4.3.1 Field Standards are District or local standards
derived from prior projects.
4.3.2 Regional Standards are Division or uniform criteria
standards established for regional, climatic and other environmental design conditions. Plates at the end of chapters in this AEIM are regional standards. Supervising districts may have additional standards. The AE should request a list of Standard Detail files available in MicroStation→ or AutoCad→ format, from the district project Technical Leader.
4.3.3 HQUSACE Standards are national standards. These documents which are to be utilized as completely as practicable for project design conditions. Analyses of foundations, structural and mechanical systems are normally authorized to site adapt the drawings. Revisions and deviations beyond these shall be reported and submitted for approval through the Technical Leader in the supervising district, to CESWD-ETEC-T to HQUSACE.
4.4 Project Drawings. Project drawings are developed for actual construction at an individual site. They may be site-adaptations of standard plans or new and original design document submittals as follows:
4.4.1 Schematics/Sketches are single-line drawings to scale
representing 5-10% project design development. They include but are not limited to basic site plan (including orientation and
VIII-6
contours), floor plan (with overall dimensions), gross area, two elevations and a section.
4.4.2 Army Project Engineering and Air Force Project
Definition are double-line drawings to scale, with dimensions, representing 10-30% (actual % as specified by contract Scope of Work) project design development. They include but are not limited to a site plan showing proposed buildings, roads, parking, etc., utilities layout for electrical, gas, water, steam, etc., floor plan(s) showing functional space arrangements, building elevations, and sections to identify exterior wall system and architectural style, sections to show type of floor and roof structure, single line ductwork layout, mechanical room layout.
4.4.3 Army Concept are double-line drawings to scale with
control dimensions representing 25-35% project design development. Comprehensive basic layouts with net areas and equipment are required for each design discipline. A preliminary fire protection plan, elevations, cross-section and typical wall section are required.
4.4.4 Final and Corrected Final Drawings are complete civil, architectural, structural, mechanical and electrical drawings including all building components, controlling dimensions, sections and details for efficient execution of construction.
Drawings will be independently checked and thoroughly coordinated with specifications terminology for accurate take-off and competitive bidding by contractors.
4.4.5 Demolition Drawings will show all of the existing
construction to be changed or removed. Notes, dimensions and details will be explicit for accurate sizing, take-off of quantities and estimating. Provide a schedule identifying characteristics of mechanical/electrical equipment to be removed or relocated.
4.4.6 As-Built Plans are completed sets of drawings with all
attendant changes, modifications and details of construction as built and installed. Sets of As-Built Plans of will be furnished as required to the using agency for future reference, maintenance and construction on the facility. A Master set of CADD files of the project drawing records will be retained at the District for a period of 5 years and then sent to the using agency.
5. FORMAT OF PLANS. The number of drawings will vary according to the scope and requirements of each project. Experience has shown that following the guidance below results in clear construction contract documents.
VIII-7
5.1 Arrangement of Drawings. Arrangement of drawings will be as shown in the latest version of the A/E/C CADD Standards.
5.2 Cover Sheet. Each set of plans or volume in a set of plans should have a cover sheet. Cover sheets contain the base name, official title of the project, volume number when there are multiple volumes in a set, Corps of Engineers logo, name of district responsible for the preparation of the contract plans, solicitation number and issue date, and after award of the contract for construction the contract number. The A-E should obtain the format for the sheet from the district project Technical Leader. Solicitation and contract numbers will be assigned by the district. A copy of the cover sheet can be obtained at http://www.spa.usace.army.mil/Missions/EngineeringandConstructi on/CADStandards.aspx .
5.3 Index of Drawings. Index of drawings may be a separate
sheet, sheet for each volume of the plans, or for small projects combined with the project location sheet. Place the index of drawings behind the cover sheet. Arrange so that additional numbers can be added in each technical discipline.
5.4 Project Vicinity, Location and Haul Route. A vicinity map and base layout map to be used for project location and the haul route will be furnished by the supervising Corps district.
This information should be included on a separate sheet following the index sheet.
5.5 Legends and Symbols. Legends and symbols will be complete and concise for the project design. District standard symbols will be used to depict all work items on boring logs, civil drawings, architectural drawings, mechanical drawings, electrical drawings, and landscaping. AIA standards may also be utilized. The ampersand (&) will not be used in sentences and schedules. Additional symbols may be used by the design agent to correlate project drawings by discipline. A consolidated legend/symbol sheet for the entire project may be provided or separate legend/symbol on discipline drawings may be provided.
6. DRAWING STANDARDS.
6.1 Scale. Scale for all drawings and delineation will permit complete legibility. A graphic bar or checkerboard scale will be provided on each sheet near the lower left hand corner of the sheet. Conventional scale standards are as follows:
Site Plans (Buildings) No smaller than 1:200 Floor Plans* No smaller than 1/8” = 1’-0” Roof Plan No smaller than 1/8” = 1’-0”
VIII-8
Exterior Elevations No smaller than 1/8” = 1’-0” Interior Elevations No smaller than 1/4” = 1’-0” Cross Sections No smaller than 1/8” = 1’-0” Wall Sections No smaller than 3/4” = 1’-0” Stair Details No smaller than 3/4” = 1’-0” Details 3/4” = 1’-0” or 1 ½” = 1’-0”
* A minimum scale of 1/4” = 1’-0" is required for family housing, medical centers and all areas of congestion such as mechanical rooms, restrooms, kitchens etc.
6.2 Lettering. Computer lettering will be in the font and line weight standard used by the district. Lettering will not be less than "this type-size", after reduction, for any reduced presentation.
6.3 Sheet Numbers. Sheet numbers will be indexed and assembled by disciplinary group in the set of drawings. Unless otherwise approved by the design district, the sheet number should consist of a capital alphabetical letter representing the discipline followed by a number indicating its sequence in the discipline group. The designations for the disciplines are C for civil/site, A for architectural, S for structural, M for mechanical, E for electrical, BL for boring location and log of borings, L for turfing and landscaping.
6.4 North Arrows. North arrows will be placed on the plan
sheets for each discipline. The north arrow will be on the key plan if used and oriented to the top of the sheet where practicable. The true meridian and magnetic declination will be shown on all maps. When a coordinate system is used for civil drawings, grid north will be shown.
6.5 Titles. Titles must be used to identify the view and also what the view is representing; SITE PLAN, PIPING PLAN, FLOOR
PLAN, NORTH ELEVATION, WINDOW JAMB DETAIL, CROSS SECTION A-A,
etc.
6.6 Section and Detail Cross References. Section and detail
cross references should follow the sheet number where cut/sheet number where shown convention shown on plate D2 in Appendix A unless otherwise approved by the district.
Section and cross reference standard symbols, should typically have a title to provide sufficient identification to clarify location of the sections/details, such as JOINT DETAIL, ELECTRICAL PANEL ELEVATION, etc. The title may have more than one line and may have subtitles and explanatory notes.
VIII-9
6.7 Photographs. Photographs may be used to better illustrate existing conditions. Photos used for modification work or maintenance work should use pencil changes and dimensions drawn on the photos with clarifying notes. Photos should be not less than 4" x 5" and not larger than 8" x 10". When appropriate graphic scales should be included so the dimensions can be scaled.
6.8 Dimensions/Grid. Dimensions/grid will be carefully checked and coordinated between disciplines for accuracy. Plan dimensions for wall frame construction will be to face of stud and to centerline of openings. Masonry construction dimensions will be to nominal face of masonry and to jambs of openings.
Control dimensions will be to the same points on architectural and structural drawings. Where columns occur, a dimensional grid system will be set to column centerlines.
6.9 Finished Drawings/Checking. All drawings submitted will be marked to their submittal level (i.e. Advance Final, Final, etc.). The medium for submission shall be in the contract documents or established by the district project Technical Leader. Notes and terminology will be consistent with guide specifications. General notes will be grouped and special notes will provide specific reference, i.e. See Structural Dwg.S-1.
"By Others" should not be used. Work shown, but not existing and not in the construction contract, will be designated as NIC (not in contract). Sectioning, cross-referencing and general titling guidance are as shown on plate D2 of Appendix A in this chapter.
Detailing should be consistent with stock materials and standard construction practices. Details should provide thorough and unambiguous guidance for basic materials of construction.
Details for options should be consistent with reasonable selections from the guide specifications for project design conditions.
6.10 Reproduction Process. Specific requirements for the
reproduction process to be used for each project will be furnished by the supervising district. See paragraph 3.3.12 above.
6.11 Electronic Bid Set. When required by the contract Scope of Work, the AE shall provide the final drawings (and specifications) on CD-ROM. Drawings will be converted to CAL file format before placing them on the CD-ROM. Digital files for use on the Electronic Bid Set CD's shall be furnished as directed by the supervising district.
VIII-10
7. PROJECT DRAWING DATA. See Civil Chapter II, Architectural Chapter III, Structural Chapter IV, Mechanical Chapter V, Electrical Chapter VI, and Part 2, Chapters 1 through 8 in Design Analysis Chapter IX for requirements in addition to the following:
7.1 Project Site Plans. Project site plans will show north
arrow, existing contours, existing and adjacent facilities, topographic features and utilities interface for complete interdisciplinary coordination of the proposed site design.
7.2 Floor Plans. Floor plans will show complete horizontal
controlling dimensions and civil/site interface. Reference all section cut lines on plan to the appropriate sheet where the section is shown. Built-in, installed and portable equipment will be indicated to scale. For major items of mechanical/electrical equipment, use the larger of three manufacturer’s equipment sizes for space requirements.
7.3 Fire Protection Plans. Fire protection plans will be
provided for Army project engineering, Air Force Project Definition, Concept, Final and Corrected Final submittals. Plans will indicate hazards, clearances, rated wall systems, fire exits and distances. Gross floor areas will be listed for each floor and for the building.
7.4 Room Finish/Color Schedules. Room finish/color schedules
will be provided on (or follow) the floor plan sheet, be complete for each wall orientation and consistent with fire protection plan ratings, interior design finishes and project specifications terminology. All spaces in the schedules will be filled in. Where surfaces have no finish, the word "none" will be used. Ditto marks will not be used.
7.4.1 Interior Finish Schedules will cover all built-in
items requiring finish including cabinets, counter tops, acoustical materials and mechanical/electrical equipment exposed to view. Schedules will stipulate surfaces to receive paint by type and texture and the specifications will be coordinated therefore.
7.4.2 Exterior Finish Schedules will include the finish and
texture for all exterior materials exposed to view. Exterior metal work such as doors, windows and metal fascia will be compatible.
7.5 Elevations. Elevations will show all visible elements
including adaptation to finish grade, story heights, fenestration and mechanical/electrical equipment and screening of appearance
VIII-11
distractions. Indicate rustication, control, construction and expansion joints and coordinate with structural drawings.
7.6 Longitudinal and Cross-Sections. Longitudinal and
cross-sections will be taken to show all building framing sub-assemblies and suspension systems.
7.7 Wall Sections. Wall sections will show comprehensive
variances in construction with complete vertical dimensions. Sections will be structurally coordinated for:
7.7.1 Foundation and finish grade conditions.
7.7.2 Size and spacing of horizontal and vertical
reinforcement and masonry ties.
7.7.3 Control joint placement and details.
7.7.4 Suspension and furring assemblies including wind up-
lift and seismic bracing details.
7.8 Doors. Doors will be drawn to scale, each with a separate number and door swing shown in plan. Door elevations and details will show transoms, sidelights, glazing and louvers. Doors will be numbered consecutively and counter-clockwise in plan as follows:
Basement ------- 01 through 99 1st Floor ----- 101 through 199 2nd Floor ----- 201 through 299 etc.
7.8.1 Door Schedules will list each door by separate number and segregate by type, material, fire rating, hardware, threshold and detail references.
Schedules will be coordinated with fire protection plans, security criteria, and specifications. Each frame type will be identified by double letters (AA, BB, CC etc.).
7.9 Windows and Schedules. Windows and schedules will include all the various types and options used with references to head, jamb and sill details. Each window type will be designated by "W" and number (W-1, W-2, etc.). Window details should be coordinated with energy conservation fenestration and solar shading.
7.10 Roof Plans. Roof plans will show all access, slopes, drainage flow, scuppers, roof mounted equipment, walkways, and
VIII-12
skylighting. Provide references for all flashing details, horizontal joints, intersections, and penetrations. When built-up roof systems are used, detail uniform shaped penetrations with clamped bell-flashing and non-uniform shaped penetrations with pitch pockets.
7.11 Ceiling Plans. Ceiling plans will show all special
architectural features and mechanical/electrical fixtures and will be coordinated with fire rated assemblies and sprinkler system.
7.12 Sections and Details. Cuts will be comprehensive for
construction and identified with correct number and sheet to accurately show dimensions, type and extent of materials.
7.13 Equipment Schedules. Equipment schedules will list
identification nomenclature for each piece of equipment, stating size, mounting provisions, utility service and capacity requirements. Additionally denote Government Furnished/Contractor-Installed equipment and all Government- Furnished and Installed equipment. Medical and laboratory equipment schedules will be as specifically directed for the project.
8. AMENDMENTS AND MODIFICATIONS. Revisions to drawings will meet the drafting standards used in the development of Final Plans for uniformity. The district project Technical Leader will coordinate between the Corps of Engineers Construction representative and A-E and furnish direction therefore. See paragraphs 3.3.10 and 3.3.11 of this chapter for additional guidance.
THIS PAGE INTENTIONALLY LEFT BLANK
APPENDIX O
STRUCTURAL DRAFTING STANDARDS
STRUCTURAL DRAFTING STANDARDS
1.1 Drafting Standards. These structural drafting standards shall take precedence over all other referenced drafting standards in this criteria document to include the ERDC/ITL TR-01-6 - “A/E/C CADD Standard”.
1.1.1 Sheet Numbering. All sheet numbering shall comply with ERDC/ITL TR-01-6 – “A/E/C CADD Standard”, page 17, Figure 6 and Table 6. The “Discipline Designator”(Figure 6) shall be an “S” for ALL structural drawing sheets.
1.1.2 Reference Bubbles.
1.1.2.1 Structural Plans, Sections, and Details. All structural plans, sections, and details shall be identified with a reference bubble. The respective reference bubbles shall be referenced from structural notes, plans, or other sections and details. The number and lettering sequence shall start with number “1” and letter “A” on each respective drawing sheet.
1.1.2.2 Two-Part Reference bubbles. All reference bubbles shall be divided up into 2 parts.
1.1.2.2.1 Part One. Part one is the upper half of the bubble and is the reference number or letter of the bubble. Sections shall be numbers.
Details and plans shall be letters.
1.1.2.2.2 Part Two. Part two is the lower half of the bubble. When the bubble is shown on a section, detail or plan, part two is the number of the sheet where the section is drawn. When the bubble is on the sheet where the section, detail or plan is drawn part two is the number of the sheet where the detail was referenced from. In this case Part 2 could be numerous sheet numbers if the section, detail or plan is referenced at more than one location in the drawings. The text shall not be made smaller than 1/8” in height to fit into the two sections of the bubble. Break the lower bubble line to accommodate more than one sheet number.
1.1.3 Foundation and Framing Plan Dimensioning. All structural foundation and framing plans shall be FULLY dimensioned. No dimensions shall be referred back to the drawings of another discipline. Also, no dimensions shall be referenced back to a foundation plan from a framing plan or visa versa. All plans shall contain overall dimensions for the major parts of the building and the overall length of the building.
1.1.4 Grid Lines. All foundation and framing plans shall contain grid lines in both directions and on diagonals (if necessary for angular portions of the structure) for bearing and shear walls, beam and column lines, ribbed mat slab ribs, walls around stairs and elevators, pad footings and at all edges of the building. Each grid line shall be identified as to what element it locates with the use of keyed notes. Do not provide grid lines or location dimensioning for thickened slabs that would be provided under interior masonry partitions. All grid lines shall project from the grid line identification bubble to the element it is identifying.
1.1.5 Scale of Foundation and Framing Plans. All foundation and framing plans and overall building sections shall be drawing to a scale of at least 1/8”= 1’-0”.
1.1.6 Scale of Sections and Details. All foundation sections and details shall be drawn at a minimum scale of 3/4” = 1’-0”. All roof sections and details shall be drawn at a minimum scale of 1-1/2” = 1’-0”. The reason for these scale requirements is so the sections and details can be easily read when the drawings are plotted at one-half size.
1.1.7 Lettering. All lettering shall be uppercase and at least 1/8-inch in height when plotted at full size. This includes lettering contained within reference bubbles.
1.1.8 Standard Drawings. The drawings shall contain CESPA standard structural notes and typical details. These notes and details shall contain a list of the design loading criteria, a list of the strengths of the engineering materials used, the soil design property values, and any other data that would be pertinent to remodeling and/or future additions. These standard sheets are coordinated with the CESPA guide specifications such that conflicts between the two are minimized – reference the previous paragraph titled “Philosophy”. For electronic copies of these standard structural drawings go to web site http://www.spa.usace.army.mil/Missions/EngineeringandConstruction/CADStandards/Disciplines.aspx click on “Discipline Specific Requirements” and click on “Structural”. The contact for these drawings is Mr. Lance Faerber with the CESPA at 505-342- 3693, Fax 505-342-3497 or email at Lance.R.Faerber@usace.army.mil. These standard drawings are in MicroStation or AutoCAD format. The minimum requirements for the respective notes are described in detail throughout this document. These standard drawings are working files and can be revised by CESPA at anytime without notice.
1.1.8.1 Reference CESPA Standard Structural Drawing Sheets S001, S002, S003, S004 & S005 for required minimum standard structural notes and typical details. These five sheets shall be placed as the first five sheets of the structural drawings (no exceptions) no matter the size of the drawing sheets.
There are two sets of Sheets S001, S002, S003, S004 & S005, one for reinforced ribbed mat slabs (RRMS) and one for “Floating” or “Turned Down Edge” slab-on-ground foundation systems as noted on the respective drawings.
1.1.8.2 Standard sheets RM1, RM2 & RM3 are for RRMS foundation systems for use on layout of the ribs (sheet RM1) and typical foundation details (sheet RM2 and RM3).
1.1.8.3 Standard sheets RM4 & RM5 are for “Monolithic Floor Slab-On-Ground with Continuous Turned-Down-Edge Footings, Integral Interior Continuous Footings, and Integral Spread (Spot) Footings System” foundation system plans and typical details.
1.1.8.4 Standard sheets RM6 & RM7 are for “Housing Turned Down Edge” system foundation plans and typical details.
1.1.8.5 Standard sheet numbers with prefix “T” are standard foundation details for water and oil storage tanks.
1.1.8.6 Standard sheet numbers with prefix “HC” are standard sheets for precast concrete hollow core floor and roof planks.
1.1.9 Keyed Notes. Keyed notes are required for all referencing on the structural drawings except for the standard sheets S001, S002, S003, S004 and S005 that may or may not use keyed notes.
APPENDIX P
DESIGN ANALYSIS GUIDANCE
DESIGN ANALYSIS
Table of Contents
1. GENERAL
2. PREPARATION
2.1 Size and Layout
2.2 Organization
2.3 Classified Material
2.4 Design Calculations
2.5 Automated Data Processing
2.6 Standard Designs
2.7 Other Data
2.8 Submission
2.9 Government-Furnished Design
3. FORMAT AND CONTENT
4. DESIGN ANALYSIS TABLE CONTENTS
Part I - Introduction and Design Background Part II - Civil Part III - Architectural Part AU - Interior Design Part IV - Structural Part V - Mechanical Part VI - Electrical Part VII - Environmental Part VIII - Cost Estimate Part IX - Energy Conservation Part X - Fire Safety Part XI - O&M Provisions
Appendix A - Pavement Design Appendix B - Foundation Design Analysis Appendix C - Construction Phasing Data Appendix D - Physically Handicapped Checklist
Attachments A-Z - Drawings, Sketches, Cost Estimate
Supplement, Photographs, etc.
DESIGN ANALYSIS
1. GENERAL. The requirements and procedures for the preparation of the design analysis are contained in ER 1110-345-700. The design analysis will be a bound assemblies of functional and engineering criteria, design information, and estimated costs.
Copies of the cost estimate shall be furnished as specified in Chapter X, Cost Engineering Guide for Military Construction. The design analysis will include supporting documentation to define the project, engineering design analysis, cost estimates, drawings, and specifications. Contents in the design analysis shall be suitable for review and approval, for permanent record purposes, for use in adapting the design to other sites, and for future re-evaluation and modification of the construction.
2. PREPARATION.
2.1 Size and Layout. The design analysis shall be produced by a word processor and letter quality printer (using 12 point size print), hand printed, or a combination thereof. All material shall be prepared on 216 X 279 mm (8-1/2 x 11 inch) standard sheet size.
Larger sheets, folded to the prescribed size, may be utilized when reduction is not feasible. All side margins will be 25 mm (one-inch) minimum to permit side binding and head-to-head duplication.
2.2 Organization. The design analysis for projects with more
than one building or facility will be organized into volumes for each major facility with a title page and complete table of contents for each volume. The several parts and sheets of the design analysis for each facility shall be numbered sequentially and bound under one cover (insofar as practicable) indicating the volume number (if more than one), the name of the facility, the name of the project if different, the project number, fiscal year, date of publication, and the drawing and specification numbers assigned to the facility. Covers will be a durable material with information to indicate contents thereon.
2.3 Classified Material. Every effort will be made to prepare the design analysis as to permit it to be an unclassified document, with proper reference to sources of classified material. Design analyses containing classified material will be marked and handled in accordance with applicable security regulations.
2.4 Design Calculations. Technical design analysis will be
performed and checked by separate individuals. An independent technical review shall be accomplished by registered architects, and/or engineers for completeness. The names or initials and registration of these individuals will be indicated on the computation pages or a cover sheet for the calculations.
Presentation will be clear and legible with a tabulation showing all design loads and conditions. The source of loading conditions, formulas, and references will be identified. Assumptions and conclusions will be explained and cross-referencing will be clear.
2.5 Automated Data Processing. When computer programs are used, the design analysis should include a complete listing of the input and output data, and calculations necessary for preparation of the input data. Input should be annotated to facilitate a reviewer's verification of data. Computer output should be in a format that identifies results by proper column headings and line identification keyed to a sketch of the structure if necessary.
Voluminous output data may be included in a separate volume or, subject to District approval, output presentation may be limited to key sections or to typical results when output is repetitive.
Results should be verified by an independent analysis, or example by a "ball park" hand analysis. The required level of verification is problem-dependent, including such factors as complexity of analysis, importance of results, and level of confidence in the program. Computer programs will be considered "approved" or "non-approved", where approval is granted by the appropriate District for A-E designs. Approved programs will be those commonly used programs judged to be reliable and thoroughly debugged;
examples of approved programs are BLAST, STRUDL and COGO. Non-approved programs are typically those written by an individual engineer to simplify repetitive computations. When non-approved programs are used the design analysis must include a description of the theories, assumptions and design methods employed, sufficient to verify validity of the program. Non-approved programs will require a higher degree of input description and output verification.
2.6 Standard Design. Analysis for standard designs shall be
prepared in accordance with the requirements of ER 1110-345-700 and applicable requirements in this chapter. Modifications of standard design analysis shall be accomplished to meet project site conditions as authorized by ER 1110-345-700.
2.7 Other Data. Codes, manuals, special investigations and
reports are to be considered and used as applicable.
2.8 Submission. Except when specifically exempted, the design analysis will accompany all drawings submitted for review, approval, information, or record, as outlined in ER 1110-345-700.
The design analysis presented with preliminary or partially completed work will be as complete as the stage of design progress permits. Required submittals of drawings, design analysis, cost estimate, and specifications are outlined in Chapter XI of this manual.
2.9 Government-Furnished Design. As subsequently explained, the Foundation and Pavement Design Analyses will be furnished by the District Geotechnical Branch.
3. FORMAT AND CONTENT. The basic format for the Air Force Project Definition, Army Project Engineering, Army Concept, Preliminary, Final, and Corrected Final Design Analysis is essentially the same, adjusted for the particular level of design and the type of facility. The following pages present the format to be used in the preparation of the Design Analysis for each discipline. While not all inclusive, Appendix B (DESIGN REQUIREMENTS AND PROVISIONS) of ER 1110-345-700 provides a checklist of items to be addressed in the Design Analysis.
4 DESIGN ANALYSIS TABLE OF CONTENTS.
Part I Introduction and Design Background
Part II Civil
Part III Architectural
Part AU Interior Design
Part IV Structural
Part V Mechanical
Part VI Electrical Part VII Environmental
Part VIII Cost Estimate
Part IX Energy Conservation
Part X Fire Safety
Part XI O&M Provisions
Appendix A Pavement Design
Appendix B Foundation Design Analysis Appendix C Construction Phasing Data Appendix D Physically Handicapped Checklist Attachments A thru Z Drawings, Sketches, Cost Estimate Supplement, Photographs, etc.
(*) Note: The above list includes items that must be in the Final Design. The following item descriptions are asterisked to indicate items that must be included in the design analyses submittal for project definition, and project engineering phases for a particular construction feature. If a paragraph or "Part" is not appropriate, document with "N/A".
PART I - INTRODUCTION
Describe the purpose and scope of the particular stage of design, and the particular project being designed, generally as follows:
*1. Directive Authorization and Project Description. Give Job Number, Directive Authorization(s) number and date, item category code number, nomenclature, directive scope, programmed dollars, and cost limitation dollars. Provide a brief general description of the project.
*2. A-E Contract Data. Copies of DD Form 1391 (Army projects) and Engineering Instructions with A-E Service Contract Number and date of Notice to Proceed.
*3. Background Criteria. Describe definitive drawings if applicable, and all other drawings or data furnished for design of project. State whether new design or site-adapted.
*4. Government-Furnished Equipment. List any known equipment to be furnished and/or installed by the using service. List any known equipment to be furnished by the Government and installed by the construction contractor.
5. Security Provisions. State any overall security requirements relating to the project.
6. User Information. A compilation of operational characteristics related to design provisions for efficient utilization and maintenance of the overall project to include features built in to provide flexibility, aid housekeeping, control service systems, and provide safety. This part of the design analysis should be in a form that can be adapted to supplement the completion records required by AR 415-10.
*7. Site Visit and Conference Notes. Include copy of notes.
*8. Waivers/Permits. List any waivers that will be required, such as fire clearance, building spacing, airfield clearance, POL, ammunition/explosive area, etc. State what agency must provide the waiver. Waiver request and documentation therefor should be submitted under separate cover.
*9. Design Quality Control Plan (DQCP). An updated DQCP shall be attached as an Appendix to each Design Analysis submittal. See A-E contractual provisions and the district Quality Management Plan for the required content.
*10. Economic Summary.
10.1 Summarize results of economic analysis and refer to specific portions of the design analyses which contain the economic analysis.
10.2 Identify results of value engineering studies performed on the project design.
11. Construction.
11.1 Instruction. Designer shall provide directions to field
construction managers for special subjects such as new and sensitive technology items and features needing particular attention for quality control, workmanship, assembly, etc.
11.2 Phasing. Summarize any known or anticipated construction phasing/sequencing requirements. Refer to Appendix C format.
11.3 Duration. Length of construction period in calendar days, not including weather delays. Coordinate with Appendix C.
*12. Design Problems. Cite any special problems encountered, with recommended solution. Note any significant changes made from criteria and/or previous design stages.
13. Guide Specifications. List all applicable guide specifications.
PART II - CIVIL
*1. Site Analysis.
*1.1 Existing site description, including items to remain, to be removed, and/or to be relocated.
1.2 Analysis of the most effective use and adaptation of the site for the proposed facility. Briefly explain building orientation, building setbacks, driveway and sidewalk locations and widths, parking area locations and sizes, walking distance consideration, emergency access, mail and garbage access, environmental considerations, and functional relationships to other facilities.
Show parking allocation calculations. Explain rationale for locations of borrow areas, disposal sites, and contractor plant areas.
1.3 Briefly explain other siting considerations such as reversal of standard plan and functional and aesthetic relationship with surroundings. State whether or not the facility will be accessible to the physically handicapped.
*2. Grading. State the minimum and maximum grades utilized to develop the desired grading and drainage plan. State the rationale used in establishing the finish floor elevation of the building(s) and the overall grading and drainage plan. Any deviation from the criteria should be stated and fully explained.
*3. Pavements.
3.1 Identify the areas to be paved and the type of pavement to be used. Reference Appendix A of Design Analysis, Pavement Design, that is prepared by the District.
3.2 The type and volume of traffic, class of roads, and Design Index should be stated, with jurisdiction for any deviation from criteria for those classes. Streets should be classified per TM 5-822-2 (AFM 88-7, Chapter 5).
3.3 All pavement information should reflect the date and
recommendations furnished by the Government. Reference Appendix A of Design Analysis for additional information.
4. Storm Drainage.
4.1 Proposed storm frequency, rainfall intensity, and methods used for determination of rate of run-off and design of drainage features.
4.2 Provide a description of the existing and proposed drainage patterns, the rationale for the proposed design, and the impact of future development on drainage.
4.3 Proposed types of materials to be specified for culverts, storm drains, and related structures.
4.4 Describe special structures.
4.5 Provide drainage calculations and drainage area maps as an attachment to the design analysis. See paragraph 10, Calculations.
*5. Utilities.
*5.1 Water Supply and Distribution. General explanation of the existing service. Where major extensions are required, describe system, indicating type, storage, condition, water pressures, and unsatisfactory elements.
5.1.1 Provide statement on type of construction, proposed
materials, required flows or capacities, including designer's basic estimate of tentative pipe sizes. Where pump stations, storage, or treatment plants are involved, include tentative sizes and basic data (population, fire flows, etc.) which will be used in sizing equipment. Provide the domestic and/or fire protection demand(s) and state the static and residual pressure at the building line.
State the static and residual pressure in the existing main at the flow rates of the new facility. Cross reference the mechanical design analysis for the determination of the water demand. State requirements for valves, meters, and fire hydrants. Attach complete calculations for sizing water piping.
*5.2 Sanitary Sewer. Provide a general description of the existing sewer system located within the area. Describe the new system as it relates to the operation of the existing system and the proposed new facility.
5.2.1 Describe type of new system, conveyance sizes and grades, pipe materials, and contributing flows. Where lift stations are required, state type of construction, and pump type, flow, head, size, and number. State requirements for manholes and cleanouts.
Attach all calculations used in the sizing of system.
5.3 Landscape Irrigation. Provide a general summary of system requirements, including required application rates and types of heads specified. Describe user requirements as to system features and operation used in preparation of the specifications.
*5.4 Gas Supply and Distribution. Provide a general description of the existing gas system located within the area. Describe the new system as it relates to the operation of the existing system and the proposed facility including the pressure and flow-rate capacities of the existing lines to be used and the pressure and flow-rate requirements of the proposed facility.
5.4.1 State requirements for valves, meters, regulators, blow-offs and drips. Attach all calculations used in the sizing of the new system.
6. Fencing. Provide type and height of fence and describe the areas to be secured. State the number, type, and size of gates provided. Describe the fence and gates to be removed and state if the removed fence and gates will be reused in this contract, turned over to the installation, or disposed of.
7. Turfing and Landscaping.
7.1 Description of methods of vegetation establishment. Scope of work, such as the number and kinds of trees and shrubs.
7.2 Rationale of the landscape plan and the use of the trees, shrubs and vines in the design of the landscape plan.
7.3 Existing trees to be removed and trees to be saved.
7.4 Instructions for planting, replacement, and maintenance of landscape plants.
*8. Railroads. Statement of type of service for which railroad track will be provided, anticipated volume and type of traffic, and the ruling grade. Proposed type, source, and thickness of ballast, weight of rail, source, treatment and dimensions of ties proposed.
9. Economic Justification. Analyses shall be provided in the choice of basic materials, functional systems, and other design options in sufficient detail to justify economically the materials, systems, and options selected. Suitable documentation shall be provided to:
9.1 Verify that the necessary studies have been made.
9.2 Identify the alternatives considered.
9.3 State the decisions made, and;
9.4 Indicate the basis for the decisions and cost determination.
Economic studies should include consideration of maintenance costs for the design life of the structure if such information is readily available. The formalized life cycle costing technique is not required unless the contract has been negotiated to include additional developing of life cycle cost data or alternatives.
10. Calculations. All calculations will be submitted for review, including calculations for the sizing of utility lines and storm drainage facilities.
11. Additional Criteria Needed. List criteria needed to complete final design.
PART III - ARCHITECTURAL
Design Analysis Format
*1. General Description. Briefly describe the proposed facilities, functional purpose, capacities and type of construction. Confirm any building fire protection classification cited by the project criteria.
*2. Criteria References. List architectural criteria references numerically.
*3. Design Criteria. Present design data and/or show numerical reference and page number as applicable for the following:
3.1 Space Allocations. State program scope, personnel capacity, and any unit or statutory limitations for building. State comparable gross scope and unit factors for proposed design.