About this file
03 Drawing, Sheet 1of2,18Jan19
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 03_Site_Visit_Invitation.pdf | ||
| 01_Solicitation_W912PB19Q8014.pdf | ||
| 04_Drawing,_Sheet_2of2,18Jan19.pdf | ||
| 02_Attachment_I,_Specification-11APR19.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
----�=::J---=�-------------------------0
6/12
6/12 I
I
PCFY-
P20 -
VFM-E
I
I PCFY- re==:--J. j
--'P20 - ._., VFM-E.
I
I
� I/
I
PCFY-
P20
VFM-E
I
6/12
I
PCFY-
P20
VFM-E
I
I ' I
PAR�3 □I□ MAAG✓
z L!J z L!J Cl z v.=:::.----!._J � -
DN32
I/
18122
PUHZ
ZRP35VKA
r-------------------------------------------------�
I
Condensate water line in the attic with free outlet above sink at 3rd floor Kondensatleitung im Dachboden mit freiem Auslauf Ober Waschtisch im 2. OG
□ 6/12
I/ / /1 � ------- I/ l
PMFY-
: I P32VBM-E
l l
6/12
DN32
PAR-33 D
- ' - MAAG✓ -- ----------------------/---------------
��JD
6/12 6/12 - �
PAR-33 D
MAAG-J r---->--+---'--l-------liT I "tu ,-'---,��
- I�--� 6/12 •
I
6/12
I
- - �---- - �------L
<------4-----1 I I I
6/12 I /
/ -,------1--'---'---LLL�
c_ _______ L_ __ -+---------------1: BC - CONTROLLER r \
� \0,12
□6112_( �� -
KALTEMITTELLEITUNGEN
I c__ ____ ----s""-,-8/-22-------1\-'
32m
Install BC-Controller and refrigerant pipe lines in the attic BC-Controller und Kaltemittelleitungen im Dachboden installieren
PAR-33 D
MAAG✓
I
NOTE:
BEMERKUNG:
THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND
DIMENSIONS AT SITE.
SAMTLICHE MABE LIND BAUZUSTANDE SIND VOM
AUFTRAGNEHMER AN ORT LIND STELLE ZU PRO FEN.
NOTE:
BEMERKUNG:
THE PURPOSE OF THIS DRAWING IS TO EASE CALCULATION.
DIMENSIONS, CROSS SECTIONS AND LOCATION OF EXISTING
AND PLANNED PHYSICAL STRUCTURES ARE NOT BINDING AND
CAN CHANGE DUE TO LOCAL CONDITIONS.
DIESER PLAN DIENT NUR ALS KALKULATIONSHILFE. MABE,
QUERSCHNITTE LIND LAGE DER VORHANDENEN LIND
GEPLANTEN BAULICHEN ANLAGEN SINO NIGHT BINDEND
LIND K6NNEN SICH AUFGRUND 6RTLICHER GEGEBENHEITEN
ANDERN.
REV NO DATE DESCRIPTION DRAWN BY APPROVED
INSTALLATION
PROJECT TITLE
USAG BAVARIA
Grafenwoehr Military Community - Tower Barracks
INSTALL AIR CONDITIONING SYSTEM
IN BUILDING# 433
LAYOUT AND INSTALLATION
ENGR DIV DATE., •• ,., •• ,., USING UNIT DATE, ••.•.••.•.••
SIGNAnlRE ................................................ SIGNATURE., •• ,., •• ,., •• ,., •• ,., •• NAME -RINT' John A. Howard, CJE:rgr Div NAME -RINT' DESIGN f PROJ MGMT BR DATE, , , , , , , , , , , , , MASTER PLANNER DATE ..
SIGNAruRE ................................................ SIGNATURE
�E �RINTI
DRAWN BY
M. Froehler
DATE
18.01.2019
L. Gruenwald, C/Deslgn & Proj Mgmt
PROJECT ENGR
M. Froehler
NAME -RINTI David Tasker, CJMElster Planning
CHECKED BY SHEET
L. Gruenwald 1
SCALE PROJECT NO 2
1 : 50 42-01287-8J oe __ _
Drawing, Sheet 1 of 2
Project No. 42-01287-8J 18 January 2019
3rd Floor, Building # 433
2. Obergeschoss, Gebaeude # 433