W912PB18Q3103_amendment_vendor_questions_2_final.pdf
PDF 184 KB Posted
- Attached to
- Dishwasher Federal contract opportunity
- Solicitation number
- W912PB18Q3103
About this file
vendor questions 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PB18Q3103_amendment_response_time_and_requirement_specifications.pdf | ||
| W912PB18Q3103_amendment_vendor_questions_final.pdf | ||
| requirement_specification_for_vendors.pdf | ||
| W912PB18Q3103_amendment_final.pdf | ||
| W912PB18Q3103_SOL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011185778
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PB18Q3103
X 9B. DATED (SEE ITEM 11)
04-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jun-2018
CODE
RCO BAVARIA
AMERIKANISCHE BESCHAFFUNGSSTELLE
GEB 542
92655 GRAFENWOEHR LAGER
GERMANY
W912PB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PB18Q3103
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
Summary of Changes:
The purpose of this amendment is to answer vendor questions regarding requirement specifications.
QUESTION: The Meiko dishwasher specifications that were provided state the following wash and final rinse temperatures (specifications page 3/10):
Pre‐wash zone: 40‐55°C (104 ‐131°F) Main wash zone: 55‐71°C (131‐160°F) Pump final rinse: 60‐74°C Fresh Water final rinse: 80‐85°C (176 ‐ 185°F) On that page 3/10, there is also the following statement: "The NSF labeling is not applicable, but the machine must fulfill the corresponding temperature regulation."
In addition, on page 7/10, there is a statement "that the unit will pass the thermolabel test (160°F/71°C) during the daily operation (in DIN Speed selection)".
Please note the attached documentation for the TRI‐Services food sanitation and health code including TB MED 530 (for US Army) and excerpt from NSF‐standard 3 for sanitation which are mandatory for US military facilities. The TRI‐Services code clearly states that the MINIMUM wash temperature must be 160°F/71°C (see page 89 in attachment):
"4‐501.110 Mechanical warewashing equipment, wash solution temperature
(A) The temperature of the wash solution in spray type warewashers that use hot water to SANITIZE may not be less than‐ (..)
(3) For a single tank, conveyor, dual temperature machine, 160°F (71°C); or
As per the provided specifications, all temperatures below 71°C/160°F are in violation of the required US Army sanitation code. According to the provided specifications, the maximum temperature that the Meiko can reach is 71°C/160°F and it will not meet the applicable sanitation (and Thermolabel) requirements if it falls below that maximum possible temperature. Constantly operating at the max possible temperature is simply not possible. The dishwasher will also not operate in the mandatory temperature range during most of the daily operations. Usually it will heat to the max temperature and then let it cool down a bit, then the heating will again kick in. And 15 out of 16 possible temperatures of the Meiko are below the minimum required temperature and are therefore not compliant with the US ARMY and NSF food sanitation regulations: that is any temperatures between 55°C to 70°C (131 to 158°F). And because the dishwasher would constantly try to get to the max temperature it will also wear out all heating components very fast with resulting operational and technical issues.
In addition, the stated temperature range for the fresh water final rinse is 80‐85°C. As per NSF standard 3, the minimum required temperature is 82°C/180°F and max temperature is 90°C/195°F. Therefore the provided temperature range is not compliant with the food sanitation code if the temperature falls below 82°C. Due to the Meiko's small temperature range of 80‐85°C, the temperature is not compliant if at 80°C or 81°C. Here is the quote from the TRI‐Services code (page 89 in the attachment):
"4‐501.112 Mechanical warewashing equipment, hot water sanitization temperatures
(A) Except as specified in (B) of this section, in a mechanical operation, the temperature of the fresh hot water SANITIZING rinse as it enters the manifold may not be more than 194Of (90oC), or less than‐ (.)
(2) For all other machines, 180oF (82oC). (.)"
Basically, the specified dishwasher will be in violation of the US Army sanitation codes for most of the time during its operation. This is contrary to the statement in the provided specifications. Again, the minimum temperature in wash tank must be at all times at least 71°C/160°F as per NSF! For the specified Meiko, it will be below the sanitation requirement whenever at 55°C to 70°C (131 to 158°F). In addition, the minimum temperature in the final rinse tank must be at least 82°C/180°F and it may not be below that. However, this is the case for the Meiko if at 80°C or 81°C (176°F or 177.8°F).
Please confirm if the US Army TB MED 530/NSF required temperatures as shown in the attachments have to be strictly adhered to in order to meet the applicable sanitation codes that are in place at the US Army.
If needed, we can also provide the complete codes rather than only the attached excerpts.
ANSWER: The machine specified in the solicitation meets the required NSF / Thermolabel / TB Med 530 temperatures.
QUESTION: Please confirm whether a 2‐tank machine like the provided specifications for the Meiko is required or a 3‐tank machine like the provided Hobart model number. The difference is that a 2‐tank machine has a prewash and a wash tank while the Hobart 3‐tank machine has 1 pre‐wash, a large second power pre‐wash plus a main wash tank for a much better performance during high head count periods.
ANSWER: The machine specified in the solicitation is a 3 tank machine and this is required.
QUESTION: Please confirm the max connected load available at the installation locations of 56KW for the dishwasher as stated at the site visit.
ANSWER: The available connected load is sufficient for the machine specified in the solicitation.
QUESTION: Please confirm whether deep‐drawn ("tiefgezogene") tanks are required.
This will provide a more hygienic solution compared to welded tanks.
ANSWER: The construction of tanks of the machine specified in the solicitation is sufficient.
QUESTION: Please provide the required number of upper and lower wash arms for the pre‐wash and wash zones.
ANSWER: The number of wash arms of the machine specified in the solicitation is sufficient.
QUESTION: Is this solicitation based on Lowest Prices Technically Acceptable?
ANSWER: No, solicitation is based on “Price Only”.
QUESTION: Who will be responsible for the disposal of the old dishwasher?
ANSWER: Included in this contract. See Item number 0010.
QUESTION: How many washing active tanks are required?
ANSWER: 3ea
QUESTION: Should each wash tank be separately drainable in order to reduce water consumption?
ANSWER: Yes.
QUESTION: What is the required response time of the service techs?
ANSWER: Eight hours within warranty period
QUESTION: What is maximum acceptable quantity of regenerative Water?
ANSWER: 75l/h
QUESTION: What is maximum acceptable waste air volume?
ANSWER: 150m3/h
QUESTION: What is the minimum acceptable size in m² of the Heat Exchanger?
ANSWER: 60m2
QUESTION: Should the machine have the capability to be filled automatically with timer function?
ANSWER: Yes.
Government Point of Contact
Regional Contracting Office POC Contract Specialist: Miriam Tomaselli
COMM: (+49) 09641-83-8508
DSN: 314-475-8508
E-mail: miriam.tomaselli2.ln@mail.mil
(End of Summary of Changes)