A12._Combined_Synopsis_&_Soliciation.pdf
PDF 2 MB Posted
- Attached to
- Miter Gate Anchor Bar - Rivers Project Office Federal contract opportunity
- Solicitation number
- W912P919T0034
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A12._Questions_&_Answers_2.pdf | ||
| A12._Questions_&_Answers_1.pdf | ||
| A12._Q&A_Procedures.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers St. Louis District
Miter Gate Anchor Bar/Gate Block/ Turning Feet Fabrication Rivers Project Office
Rivers Project Office 301 Riverlands Way West Alton, Mo. 63386
COMBINED SYNOPSIS & SOLICITATION
W912P919T0034
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposal are being requested and a written solicitation will not be issued.
Solicitation Number: W912P919T0034
This solicitation is issued as a Request for Quotation.
The solicitation document and incorporated provisions and clauses are those in effect through the date of posting.
This solicitation is set-aside for total small businesses associated with NAICS code 332111, size standard 750 employees.
Please provide a completed copy of the provision at 52.212-3, Offeror Representations and Certifications
– Commercial Items with your offer.
Scope of Work
1. GENERAL. The work provided for herein consists of furnishing all plant, labor, material, and equipment and performing all operations required to fabricate, assemble, and deliver the Turning Feet and Turning Tables, as specified herein and shown on the contract drawings.
2. OMISSIONS. This scope of work may duplicate or not cover all specified activities, steps, and/or procedures required to accomplish work. In case of omission, the normal industry standards, practices, specifications and/or guidelines shall prevail.
3. CONTRACTING OFFICER. The term "Contracting Officer" shall mean the person executing this contract on behalf of the Government, and any other officer or civilian employee who is properly designated Contracting Officer; and the term shall include, except as otherwise provided in this contract, the authorized representative of a Contracting Officer acting within the limits of their authority.
4. WARRANTY. Materials and workmanship shall be warranted by the Contractor for a period of one year from date of delivery to the Government. All replacement parts required under the warranty provisions shall be furnished by the Contractor at no additional cost to the Government.
5. PAYMENT. Payment will be made at the contract amount for the applicable item shown in Section B, which price and payment shall constitute full compensation for the work specified herein and shown on the contract drawings for each item.
6. RESERVED.
7. Place of Delivery. The item(s) supplied under this contract shall be delivered F.O.B. Destination to:
U.S. Army Corps of Engineers St. Louis District Melvin Price Lock and Dam 1 Lock and Dam Way Alton, IL 62002
Deliveries are accepted Monday – Friday, 0800 - 1630.
8. ANTITERRORISM/OPERATIONS SECURITY:
a) Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
b) Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two (2) valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than three (3) business days after the initial contract award.
a. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
9. DRAWINGS AND SPECIFICATIONS. See attached plans and specifications listed herein for additional work performance requirements to include submittal, testing, and inspection requirements:
A. SECTION B – BIDDING SCHEDULE
B. SECTION C - DESCRIPTION/SPECIFICATIONS
C. SECTION F - DELIVERIES OR PERFORMANCE
D. SECTION G – DRAWINGS
10. GENERAL NOTE. Upon completion of work the contractor and Government shall inspect all work for functionality and operation. The contractor shall be responsible for repair or replacement of all damages or non-functioning components prior to final acceptance and repair or replacement of all damages to the work site resulting from work performed under this contract.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 2 Each
Fabricate Gate Block
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 4 Each
Fabricate Anchor Bar Sets
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Each
Supply Plate Steel
FFP
FOB: Destination
NET AMT
SECTION B - BIDDING SCHEDULE
QUANTITY UNIT UNIT PRICE AMOUNT ITEM NO SUPPLIES/SERVICES
0001 8 Each
Fabricate Turning Feet
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 1 Job
Delivery of Fabricated Parts
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 1 Job
Delivery of Plate Steel
FFP
FOB: Destination
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government
0001 01-DEC-2019 8 966473
0002 01-DEC-2019 2 966473
0003 01-DEC-2019 4 966473
0004 01-SEP-2019 1 966473
0005 01-DEC-2019 1 966473
0006 01-SEP-2019 1
MELVIN PRICE LOCKS AND DAM
KATHY CRONE
#1 LOCK AND DAM WAY
EAST ALTON IL 62024-2406
636 899-1543 FOB: Destination
(SAME AS PREVIOUS LOCATION)
FOB: Destination
(SAME AS PREVIOUS LOCATION)
FOB: Destination
(SAME AS PREVIOUS LOCATION)
FOB: Destination
(SAME AS PREVIOUS LOCATION)
FOB: Destination
(SAME AS PREVIOUS LOCATION)
FOB: Destination
966473
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
SECTION C
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 FABRICATE TURNING FEET
1.2 FABRICATE GATE BLOCK
1.3 FABRICATE ANCHOR BAR SET
1.4 SUPPLY PLATE STEEL
1.5 DELIVERY OF FABRICATED PARTS
1.6 DELIVERY OF PLATE STEEL
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00 Page 1
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 FABRICATE TURNING FEET
Payment for all costs associated with fabricating turning feet will be made at the contract price each for "Fabricate Turning Feet", which price and payment shall constitute full compensation for providing all plant, labor, material and equipment and performing all operations necessary to complete the work as specified and as shown on the drawings.
1.2 FABRICATE GATE BLOCK
Payment for all costs associated with fabricating gate blocks will be made at the contract price each for "Fabricate Gate Block", which price and payment shall constitute full compensation for providing all plant, labor, material and equipment and performing all operations necessary to complete the work as specified and as shown on the drawings.
1.3 FABRICATE ANCHOR BAR SET
Payment for all costs associated with fabricating Anchor bar sets, to include but not be limited to, anchor bars, sleeve nuts, gudgeon links, gudgeon pins, connecting pins, bushings, rings, shims, keeper plates, painting, and items incidental thereto, will be made at the contract price per each for bid item "Fabricate Anchor Bar Set" as specified herein and as shown on the drawings. One anchor bar "set" includes the parts required for one gate that is comprised of two leaves.
1.4 SUPPLY PLATE STEEL
Payment for the supply of raw plate steel will be made at the contract job price for "Supply Plate Steel" which price and payment shall constitute full compensation for providing all plant, labor, material and equipment and performing all operations necessary to complete the work as specified.
1.5 DELIVERY OF FABRICATED PARTS
Payment for delivery of fabricated parts will be made at the contract job price for "Delivery of Fabricated Parts", which price and payment shall constitute full compensation for providing all plant, labor, material and equipment and performing all operations necessary to complete the work as specified.
1.6 DELIVERY OF PLATE STEEL
Payment for delivery of plate steel will be made at the contract job price for "Delivery of Plate Steel", which price and payment shall constitute full compensation for providing all plant, labor, material and equipment and performing all operations necessary to complete the work as specified.
SECTION 01 22 00 Page 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 22 00 Page 3
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 50 15
MISCELLANEOUS METALS AND STANDARD ARTICLES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SUBMITTAL DESCRIPTIONS
1.4 SAFETY
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 General
PART 2 PRODUCTS
2.1 STANDARD METAL ARTICLES
2.1.1 Structural Steel Plates for Turning Feet and Gate Blocks
2.1.2 Structural Steel Angle
2.1.3 Bolts, Nuts and Washers
2.1.4 Sleeve Nuts Sleeve nuts shall be ASTM A668/A668M Class G as noted on the drawings.
2.1.5 Anchor Bars
2.1.6 Gudgeon Links
2.1.7 Keeper Rings
2.1.8 Anchor Rings and Collars
2.1.9 Connecting Pins
2.1.10 Steel Bushings
2.1.11 Copper Alloy Bushings
2.2 MISCELLANEOUS ITEMS
2.2.1 Plate Steel
2.3 FABRICATION
2.3.1 Bolted Connections
2.3.2 Welding of Structural Steel
2.3.3 Tests, Inspections, And Verifications
2.3.4 Inspection of Structural Steel Welding
2.3.5 Structural Steel Welding Repairs
2.3.6 Shop Assembly and Field Work
PART 3 EXECUTION
3.1 FINISHES
3.1.1 Painting
3.2 MACHINE WORK
3.2.1 Finished Surfaces
3.2.2 Unfinished Surfaces
3.2.3 Pin Bores
3.3 TESTS
3.3.1 Workmanship
3.3.2 Production Welding
3.4 SAFETY PROVISIONS.
SECTION 05 50 15 Page 1
-- End of Section Table of Contents --
SECTION 05 50 15 Page 2
SECTION 05 50 15
MISCELLANEOUS METALS AND STANDARD ARTICLES
PART 1 GENERAL
This section covers fabrication of Turning Feet, Gate Blocks, Anchor Bars, Connecting Pins, bronze connecting pin bushings, steel bushings and related items.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes
AWS D1.1/D1.1M (2015) Structural Welding Code - Steel
ASME INTERNATIONAL (ASME)
ASME B46.1 (2009) Surface Texture, Surface Roughness, Waviness and Lay
ASTM INTERNATIONAL (ASTM)
ASTM A148/A148M (2014) Standard Specification for Steel Castings, High Strength, for Structural Purposes
ASTM A322 (2013) Standard Specification Steel Bars, Alloy, Standard Grades
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM A307 (2014) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM A434/A434M (2015) Standard Specification for Steel Bars, Alloy, Hot-Wrought or Cold-Finished, Quenched and Tempered
ASTM A500/A500M (2010a) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A572/A572M (2012) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium
SECTION 05 50 15 Page 3
Structural Steel
ASTM A563 (2007a) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A668/A668M (2015) Standard Specification for Steel Forgings, Carbon and Alloy, for General Industrial Use
ASTM A709/A709M (2011) Standard Specification for Structural Steel for Bridges
ASTM A992/A992M (2011) Standard Specification for Structural Steel Shapes
ASTM B505/B505M (2014) Standard Specification for Copper-Base Alloy Continuous Castings
ASTM F436 (2011) Hardened Steel Washers
ASTM F844 (2007a; R 2013) Washers, Steel, Plain (Flat), Unhardened for General Use
ASTM F3125 (2015a) Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength, Inch and Metric Dimensions
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control and are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings; G, EC-DS
Detail drawings for metalwork and machine work shall be submitted and approved prior to start of fabrication. Drawings shall indicate the sequence of fabrication and assembly.
Materials; G, EC-DS
Copies of purchase orders, mill orders, shop orders and work orders for materials shall be submitted prior to the use of the materials in the work.
Materials; G, EC-DS
SECTION 05 50 15 Page 4
Materials List for fabricated items shall be submitted at the time of the submittal of detail drawings.
Structural Steel Welding Repairs; G, EC-DS
SD-03 Product Data
Welding Procedure Specifications; G, EC-DS Welder, Welding Operator, and Tacker Qualification; G, EC-DS Inspector Qualifications; G, EC-DS Procedure Qualifications; G, EC-DS Previous Personnel Qualifications; G, EC-DS
SD-06 Test Reports
Tests, Inspections, And Verifications; G, EC-DS Material Tests; G, EC-DS
Certified test reports for all materials shall be submitted with all materials delivered to the site.
1.3 SUBMITTAL DESCRIPTIONS
Copies of the welding procedure specifications; the procedure qualifications test records; Inspector Qualifications; previous personnel qualifications; and the welder, welding operator, and tacker qualification test records shall be submitted prior commencing fabrication.
1.4 SAFETY
Safe welding practices and safety precautions during welding must conform to AWS Z49.1 .
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 General
Perform delivery, handling, and storage of materials and fabricated items in conformance with the recommendations of the manufacturer and approved by the Contracting Officer. Damaged materials shall be repaired by the Contractor at the direction of the Contracting Officer. Ship each subassembly completely assembled.
PART 2 PRODUCTS
2.1 STANDARD METAL ARTICLES
Standard metal articles shall conform to the respective specifications and other designated requirements. Sizes shall be as specified or shown.
Where material requirements are not specified, materials furnished shall be suitable for the intended use and shall be subject to approval.
2.1.1 Structural Steel Plates for Turning Feet and Gate Blocks
Structural steel plate shall be ASTM A572/A572M , Grade 50.
2.1.2 Structural Steel Angle
Structural steel angle shall be ASTM A36/A36M or ASTM A992/A992M .
SECTION 05 50 15 Page 5
2.1.3 Bolts, Nuts and Washers
Unless otherwise noted, bolts shall be ASTM A307, grade A, plain, with ASTM A563, grade A, plain hex nuts and ASTM F844 plain washers. Bolts for slip-critical connections as noted on the drawings shall be ASTM F3125, Grade A325 with ASTM A563 Bolts, Grade DH, and ASTM F436 hardened washers.
2.1.4 Sleeve Nuts
Sleeve nuts shall be ASTM A668/A668M Class G as noted on the drawings.
2.1.5 Anchor Bars
Anchor bars shall be ASTM A668/A668M Class G as noted on the drawings.
2.1.6 Gudgeon Links
Gudgeon links shall be ASTM A668/A668M Class G as noted on the drawings.
2.1.7 Keeper Rings
Keeper rings shall be ASTM A148/A148M Grade 80-50 as noted on the drawings.
2.1.8 Anchor Rings and Collars
Anchorage rings and collars shall be ASTM A36/A36M.
2.1.9 Connecting Pins
Connecting pins shall be ASTM A322 Grade 4340, as noted on the drawings.
ASTM A322 Grade 4340 shall have a minimum yield strength of 62 ksi and a minumum ultimate strength of 108 ksi.
2.1.10 Steel Bushings
Steel bushings shall be ASTM A434/A434M Grade 4142, Class BC as noted on the drawings. Bushings material shall be heat treated to a minimum Brinell hardness of 260.
2.1.11 Copper Alloy Bushings
Copper alloy bushings shall be ASTM B505/B505M Alloy C86300 as noted on the drawings.
2.1.12 Hollow Structural Steel Tube
Hollow Structural Steel Tube shall be ASTM A500/A500M , Grade C.
2.2 MISCELLANEOUS ITEMS
2.2.1 Plate Steel
The Contractor shall furnish raw plate steel to the Government as follows:
Quantity Description 2 Steel Plate, 8 ft. x 10 ft. x 4 in. Thickness
SECTION 05 50 15 Page 6
Steel plate shall be ASTM A709/A709M Grade 50, with supplemntal impact zone 2 requirement.
2.3 FABRICATION
Detail drawings shall be submitted and approved prior to work beginning.
Materials shall be straight before being laid off or worked. Perform straightening, if necessary, by methods that will not impair the metal.
Sharp kinks or bends will be cause for rejection of the material.
Material with welds will not be accepted except where welding is definitely specified, indicated or otherwise approved. Shearing shall be accurate and all portions of the work neatly finished. Corners shall be square and true unless otherwise shown. Structural steel may be cut by mechanically guided or hand-guided torches, provided an accurate profile with a surface that is smooth and free from cracks and notches is obtained. Prepare surfaces and edges in accordance with AWS D1.1/D1.1M , Subsection 3.2. Where structural steel is not to be welded, chipping or grinding will not be required except as necessary to remove slag and sharp edges of mechanically guided or hand-guided cuts not exposed to view.
Chip, grind or machine to sound metal hand-guided cuts which are to be exposed or visible.
2.3.1 Bolted Connections
Bolts shall be ASTM F3125, grade A325, Type I, plain finish. Bolted connections shall be assembled in accordance with AISC 348-14 to the snug tight condition.
2.3.2 Welding of Structural Steel
a. Welding Process - Perform welding of structural steel by an electric arc welding process using a method which excludes the atmosphere from the molten metal and conforms to the applicable provisions of AWS D1.1/D1.1M . Minimize residual stresses, distortion and shrinkage from welding. For field work, temporary enclosures shall be utilized to prevent wind, rain, and extreme elements from interfering with welding operations and results.
b. Welding Technique
(1) Filler Metal - The electrode, electrode-flux combination and grade of weld metal shall conform to the appropriate AWS specification for the base metal and welding process being used or be as shown where a specific choice of AWS specification allowables is required. Include the AWS designation of the electrodes to be used in the schedule of welding procedures. Use only low hydrogen electrodes for manual shielded metal-arc welding regardless of the thickness of the steel. Use a controlled temperature storage oven at the job site as prescribed by AWS D1.1/D1.1M , Subsection 5.3.2 to maintain low moisture of low hydrogen electrodes.
(2) Preheat and Interpass Temperature - Perform preheating as required by AWS D1.1/D1.1M , Subsection 3.5 or as otherwise specified except that the temperature of the base metal shall be at least 70 degrees F. Slowly and uniformly preheat the weldments by approved means to the prescribed temperature, held at that temperature until the welding is completed and then permitted to cool slowly in still air.
SECTION 05 50 15 Page 7
c. Workmanship - Perform welding workmanship in accordance with AWS D1.1/D1.1M , Section 3 and other applicable requirements of these specifications.
(1) Preparation of Base Metal - Prior to welding inspect surfaces to be welded to ensure compliance with AWS D1.1/D1.1M , Subsection 5.15.
(2) Temporary Welds - Make temporary welds, required for fabrication and erection, under the controlled conditions prescribed for permanent work. Make temporary welds using low-hydrogen welding electrodes and by welders qualified for permanent work as specified in these specifications. Conduct preheating for temporary welds as required by AWS D1.1/D1.1M for permanent welds except that the minimum temperature shall be 120 degrees F in any case. In making temporary welds, arcs shall not be struck in other than weld locations. Remove each temporary weld and grind flush with adjacent surfaces after serving its purpose.
(3) Tack Welds - Subject tack welds that are to be incorporated into the permanent work to the same quality requirements as the permanent welds; clean and thoroughly fuse them with permanent welds. Perform preheating as specified above for temporary welds. Multiple-pass tack welds shall have cascaded ends. Remove defective tack welds before permanent welding.
2.3.3 Tests, Inspections, And Verifications
Perform material tests and analyses certified by an approved laboratory to demonstrate that materials are in conformity with the specifications.
These tests and analyses shall be performed and certified at the Contractor's expense. Perform tests, inspections, and verifications conforming to the requirements of the particular sections of these specifications for the respective items of work unless otherwise specified or authorized. Conduct tests in the presence of the Contracting Officer if so required. Furnish specimens and samples for additional independent tests and analyses upon request by the Contracting Officer. Properly label specimens and samples and prepare for shipment. Submit certified test reports for materials with all materials delivered to the site.
2.3.4 Inspection of Structural Steel Welding
Welding shall be subject to inspection to determine conformance with the requirements of AWS D1.1/D1.1M and the approved welding procedures and provisions stated in other sections of these specifications. All welds shall be visually examined by the Contractor's Inspector. For all visual examination of completed welds clean and carefully examine for insufficient throat or leg sizes, cracks, undercutting, overlap, excessive convexity or reinforcement and other surface defects to ensure compliance with the requirements of AWS D1.1/D1.1M , Section 6, subsection 6.9, Part C
2.3.5 Structural Steel Welding Repairs
Repair defective welds in the structural steel welding repairs in accordance with AWS D1.1/D1.1M , Subsection 3.7. Remove defective weld metal to sound metal by use of air carbon-arc or oxygen gouging.
Thoroughly clean surfaces before welding. Retest welds that have been repaired by the same methods used in the original inspection. Except for
SECTION 05 50 15 Page 8 the repair of members cut to remove test coupons and found to have acceptable welds costs of repairs and retesting will be borne by the Contractor. Submit welding repair plans for steel, prior to making repairs.
2.3.6 Shop Assembly and Field Work
Fabrication and assembly of all components shall be accomlished in an indoor, climate controlled shop.
PART 3 EXECUTION
3.1 FINISHES
3.1.1 Painting
Steel items shall be blasted and painted in accordance with SECTION 09 97 13.00 40 - STEEL COATINGS. Please refer to 09 97 13.00 40 - 3.4.1 Coating Schedule for specific items and portions of items to be coated.
3.2 MACHINE WORK
3.2.1 Finished Surfaces
a. Surface finishes indicated or specified herein, must be in accordance with ASME B46.1 . Values of roughness height specified are arithmetical average deviations expressed in micro inches. Roughness specified is the maximum value and any lesser degree will be satisfactory unless otherwise called for on the drawings. Determine compliance with specified surface by sense of feel and by visual inspection of the work compared to Roughness Comparison Specimens in accordance with the provisions of ASME B46.1 . Values of roughness width and waviness height are not specified but must be consistent with the general type of finish specified by roughness height. Flaws such as scratches, ridges, holes, peaks, cracks, or checks which will make the part unsuitable for the intended use are cause for rejection.
b. Where the finish is not indicated or specified, the type of finish is that which is most suitable for the particular surface and provides the class of fit required. Maximum surface roughness of any surface is 250 micro-inch. Indicate surfaces to be machine finished by symbols which conform to ASME B46.1 .
3.2.2 Unfinished Surfaces
In so far as practicable, lay out all work to secure proper matching of adjoining unfinished surfaces. Where there is a large discrepancy between adjoining unfinished surfaces, chip and grind smooth or machine to secure proper alignment. Unfinished surfaces must be true to the lines and dimensions indicated and must be chipped or ground free of all projections and rough spots. Fill depressions or holes not affecting the strength or usefulness of the parts in a manner approved by the Contracting Officer.
3.2.3 Pin Bores
Pin bores must be machined true to gages, smooth, straight, and at right angles to the axis of the member. Boring and machining shall be done in the shop as much as possible.
SECTION 05 50 15 Page 9
3.3 TESTS
3.3.1 Workmanship
Workmanship must be of the highest grade and in accordance with the best modern practices to conform with the specifications for the item of work being furnished.
3.3.2 Production Welding
Perform production welding conforming to the requirements of AWS D1.1/D1.1M as applicable.
3.4 SAFETY PROVISIONS.
The Contractor shall comply with all applicable provisions of Corps of Engineers Safety Manual EM 385-1-1 .
3.6 DELIVERY
All parts, assemblies and materials specified in this Contract shall be delivered to:
Melvin Price Lock and Dam 1 Lock and Dam Way Alton, IL 62002
-- End of Section --
SECTION 05 50 15 Page 10
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 97 13.00 40
STEEL COATINGS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY CONTROL
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 WARRANTY
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Abrasive Blasting Material
2.1.2 Sealant Compound
2.1.3 Protective Coatings
2.1.3.1 Coating Systems
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Coating Hazards
3.1.2 Surface Preparation
3.1.3 Abrasive Blasting (AB)
3.1.4 Mechanical Cleaning (MC)
3.2 APPLICATION
3.2.1 General Requirements
3.2.2 Mixing and Application Procedures
3.2.3 Dry-Film Thickness (DFT)
3.2.4 Touch-Up
3.2.5 Sealant Compound Application
3.3 FIELD QUALITY CONTROL
3.3.1 Inspection
3.3.2 Inspection Forms
3.4 SCHEDULES
3.4.1 Coating Schedule
-- End of Section Table of Contents --
SECTION 09 97 13.00 40 Page 1
SECTION 09 97 13.00 40
STEEL COATINGS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC AB 1 (2015; E 2017) Mineral and Slag Abrasives
SSPC Painting Manual (2002) Good Painting Practice, Steel Structures Painting Manual, Volume 1
SSPC SP 1 (2015) Solvent Cleaning
SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000 Air Contaminants
29 CFR 1910.134 Respiratory Protection
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Material, Equipment, and Fixture Lists; G, ECDS
A Safety Plan; G, ECDS
SD-03 Product Data
Abrasive Blasting Material; G, ECDS
Sealant Compound; G, ECDS
SECTION 09 97 13.00 40 Page 2
Inorganic Zinc; G, ECDS
Inhibitive Polyamide Epoxy; G, ECDS
Aliphatic Polyurethane; G, ECDS
SD-04 Samples
Manufacturer's Standard Color Charts
Inspection Forms
SD-05 Design Data
Mix Designs; G, ECDS
Inorganic Zinc; G, ECDS
Inhibitive Polyamide Epoxy; G, ECDS
Aliphatic Polyurethane; G, ECDS
SD-06 Test Reports
Inspection Reports; G, ECDS
Test Reports; G, ECDS
SD-07 Certificates
Abrasive Blasting Material; G, ECDS
Sealant Compound; G, ECDS
Inorganic Zinc Coating; G, ECDS
Inhibitive Polyamide Epoxy; G, ECDS
Aliphatic Polyurethane; G, ECDS
SD-08 Manufacturer's Instructions
Protective Coatings; G, ECDS
SD-11 Closeout Submittals
Warranty; G, ECDS
1.3 QUALITY CONTROL
Submit a safety plan for protective coating systems in accordance with OSHA regulations.
Submit manufacturer's standard color charts showing manufacturer's standard finish colors.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver materials in their original, unopened containers bearing the
SECTION 09 97 13.00 40 Page 3 manufacturer's name, shelf-life, product identification, and batch number.
Store coatings, thinners, and cleaners in tightly closed containers in a covered, well-ventilated area; protected from exposure to extreme cold or heat, sparks, flame, direct sunlight, or rainfall. Follow manufacturer's instructions for storage limitations.
1.5 WARRANTY
Provide a Manufactures' warranty for each coating used.
PART 2 PRODUCTS
Submit a material, equipment, and fixture lists for manufacturer's style or catalog numbers, specification and drawing reference numbers and warranty information for the protective coatings systems fabrication site.
2.1 MATERIALS
2.1.1 Abrasive Blasting Material
Ensure abrasive blasting materials conforms to SSPC Painting Manual , Chapter 2.4, and SSPC AB 1 .
2.1.2 Sealant Compound
Sealant is a self-curing, single component, polysulfide-rubber type conforming to ASTM C920. Provide a sealant black in color and capable of being applied into the joint with a caulking gun.
2.1.3 Protective Coatings
Submit mix designs for each type of protective coating including a complete list of ingredients and admixtures. Submit applicable test reports verifying that the mix has been successfully tested and meets design requirements.
2.1.3.1 Coating Systems
The following three coating systems definitions are to be specified for use on the surfaces listed in the Coating Schedule, of this section, and as directed.
Coating System No. 1 consists of inorganic zinc only. Select inorganic zinc from the following listing. Ensure coatings, thinners, and cleaners are the product of one manufacturer.
Coating System No. 2 consists of an inorganic zinc first coat and an inhibitive polyamide epoxy finish coat.
Coating System No. 3 consists of an inorganic zinc first coat, inhibitive polyamide epoxy intermediate coat, and aliphatic polyurethane finish coat. Select coatings from the following listing. Ensure all coatings, thinners, and cleaners are the product of the same manufacturer. Ensure each successive coating is a contrasting color to provide a visual assurance of complete coverage.
SECTION 09 97 13.00 40 Page 4
COATING SYSTEMS
INORGANIC ZINC
INHIBITIVE
POLYAMIDE EPOXY
ALIPHATIC
POLYURETHANE MANUFACTURER
Dimetcote 9 Amercoat 370 Amercoat 450HS PPG One PPG Place Pittsburgh, PA 15272 412/434-3131
CarboZinc 11 Carboguard 893 Carbothane 134HG Carboline Company 350 Hanley Indust rial Court St. Louis, MO 63144 800/ 848-4645 Ext. 2557
Catha-Coat 304V Devran 201H Devthane 359 ICI-DEVOE 925 Euclid Ave.
Cleveland, OH 44115 216/344-8798
Ganicin 3.4 IOZ Corlar 3.2 PR or Corlar 2.1PR
Imron 3.5 HG DuPont Company DuPont Building 1007 Market Street Wil mington, DE 19898 800/441-7515
Porter Zinc 3200 Porter Glaze 4400 High Build
Porterthane 9000 Gloss Urethane
Porter Paint Company 400 South 13t h Street Louisville, KY 40203 800/332-6270
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Coating Hazards
Ensure that employees are trained in all aspects of the safety plan.
Specified coatings may have potential health hazards if ingested or improperly handled. Follow the coating manufacturer's written safety precautions throughout mixing, application, and curing of the coatings.
During all cleaning, cleanup, surface preparation, and paint application phases, ensure that employees are protected from toxic and hazardous chemical agents which exceed concentrations in 29 CFR 1910.1000 . Comply with respiratory protection requirements in 29 CFR 1910.134 .
3.1.2 Surface Preparation
For faying surfaces that become inaccessible after installation, abrasive blast and coat prior to installation.
Surfaces that are part of slip-critical joints are abrasive blasted and coated with inorganic zinc prior to installation.
SECTION 09 97 13.00 40 Page 5
Blast and paint only after welding is complete.
Coat prepared surfaces within 6 hours after completion of surface preparation and before rusting or recontamination occurs. Re-prepare surfaces not coated within 6 hours or which show rusting or contamination, regardless of the length of time after preparation.
Sequence surface preparation and coating operations so that freshly applied coatings are not contaminated by dust or foreign matter.
Inspect and degrease surfaces as required prior to subsequent surface preparation and the application of protective coatings. Degreasing is by solvent cleaning, detergent washing, or steam cleaning. SSPC SP 1 applies for solvent cleaning.
3.1.3 Abrasive Blasting (AB)
Ensure abrasive blasting conforms to SSPC SP 10/NACE No. 2 and SSPC Painting Manual .
Ensure compressed air used for abrasive blasting is free of moisture and oil.
Surfaces not to be blasted are:
a. machined surfaces of the pin holes
Maintain a minimum nozzle pressure of 90 pounds per square inch.
Remove weld slag, weld spatter, and foreign matter from surfaces to be coated prior to abrasive blasting using mechanical methods as specified.
Ensure blast cleaning achieves a 1-to 2-mil anchor profile as indicated by a surface profile comparator, replica tape, or similar device.
Remove rust and corrosion from pits and depressions.
Do not reuse abrasive blast aggregate.
Remove all traces of abrasive residue and dust from the surface, leaving it clean and dry.
3.1.4 Mechanical Cleaning (MC)
Where mechanical cleaning is specified in the coating schedule, use needle scalers or abrasive disks or wheels in accordance with SSPC SP 3 , leaving the surface cleanliness equivalent to near-white metal ( SSPC SP 10/NACE No. 2 ).
3.2 APPLICATION
3.2.1 General Requirements
Manufacturer's instructions for thinning, mixing, handling, and applying products are considered a part of this specification. In the event of conflict between the requirements of this specification and the manufacturer's recommendations, this specification takes precedence.
SECTION 09 97 13.00 40 Page 6
Ensure compressed air used for spraying coatings remains free of moisture and oil.
Ensure each coat of material applied is free from runs; sags; blisters;
bubbles; mud cracking; variations in color, gloss, and texture; holidays (missed areas); excessive film build; foreign contaminants; and dry overspray.
Apply coatings indoors in temperature controlled environment.
Ensure the surface temperature is at least 5 degrees F above the dew point.
Work coatings thoroughly into all joints, crevices, and open spaces. Pay special attention to welds, cutouts, sharp edges, rivets, crevices, and bolts to ensure proper coverage and thickness.
Protect newly coated surfaces from damage.
Apply coatings by airless or conventional spray. Use airless spraying for uniform large surface areas. Use conventional spraying for small areas of intricate configuration and for touchup. During application of inorganic zinc coating, maintain uniform suspension.
3.2.2 Mixing and Application Procedures
Stir material thoroughly using an instrument that does not induce air into coating.
Strain mixed material through a 30- to 60-mesh screen.
Provide continuous slow agitation of the material during application of inorganic zinc coating, maintain uniform suspension. Avoid continuous rapid agitation.
Thin material for workability and improved spray characteristics only.
Apply material in even, parallel passes, overlapping 50 percent. Pay special attention to welds, cutouts, sharp edges, rivets, crevices, and bolts to ensure proper coverage and thickness.
3.2.3 Dry-Film Thickness (DFT)
Apply coatings to the following dry-film thicknesses:
Coating System No. 1, 2 and 3, as applicable:
a. Inorganic primer zinc: 3 to 6 mils, inorganic zinc, as specified in Coating Schedule.
b. Inhibitive polyamide epoxy, second coat: 2 to 4 mils. Top coat 2 to 4 mils.
c. Aliphatic polyurethane, third coat: 2 to 4 mils, but sufficient to hide previous coat Second coat, 2 to 4 mils.
Coating System No. 3: When thoroughly dry (dry to handle), check the film thickness with a calibrated nondestructive dry-film thickness gage. If less than specified thickness, apply additional material as required.
Obtain proper DFT for the inorganic zinc coating in a single application
SECTION 09 97 13.00 40 Page 7 which may consist of multiple passes, while coating is still wet.
3.2.4 Touch-Up
Touch-up abrasions that occurred during shipment or erection as follows:
a. Ensure surface preparation and coating application conforms to the manufacturer's instructions.
b. Use inorganic zinc for touch-up and repair of inorganic zinc and hot-dip galvanizing .
c. Use inhibitive polyamide epoxy and aliphatic polyurethane for touch-up and repair of coating system No. 2.
3.2.5 Sealant Compound Application
Caulk exterior joints (portions exposed to atmosphere), including, but not limited to, the following:
a. Perimeter of faying and bearing surfaces of structural members, after assembly of joint.
b. perimeter of bearing plate at Gate 2 primary anchorage as shown on the drawings.
c. Perimeter of primary link pin plate at saddle at Gate 2 primary anchorage as shown on the drawings.
3.3 FIELD QUALITY CONTROL
3.3.1 Inspection
On-site work as described herein is inspected for compliance with the specification by a NACE (National Association of Corrosion Engineers) Certified Coating Inspector provided by the Contractor.
For all protective coatings applied off-site locations, provide full inspection by NACE Certified Coating Inspector. Ensure the inspector is present at the pre-work conference to address necessary clarification of inspection and specification requirements. Report immediately any apparent deviation from the specified requirements or any out of tolerance condition to the Contracting Officer for determination of corrective action. Submit the inspection reports performed by the Coating Inspector.
3.3.2 Inspection Forms
Submit inspection forms at the pre-work conference which are used by the Coating Inspector and forwarded to the Contracting Officer prior to delivery of the coated work to the job site.
SECTION 09 97 13.00 40 Page 8
3.4 SCHEDULES
3.4.1 Coating Schedule
SURFACE DESCRIPTION SURFACE
PREPARATION
COATING
SYSTEM
FINISH
COLOR
DRY FILM
THICKNESS, PRIMER
MILS
All surfaces of Turning Feet, Gate Blocks
AB 3 Gray 2 to 4 mils, double coat
Heads and ends of Connecting pins AB 3 Gray 2 to 4 mils, double coat
Anchor Bars (except machined threads and inside surfaces of pin holes), Gudgeon link s (except faying surfaces)
AB 3 Gray 2 to 4 mils, double coat
Faying surfaces of Gudgeon Links AB 1 3 to 6 mils
-- End of Section --
SECTION 09 97 13.00 40 Page 9
F-1
SECTION F
DELIVERIES OR PERFORMANCE
1 52.211-8 III TIME OF DELIVERY (JUN 1997)--ALTERNATE III (APR 1984)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY
0001 8 0002 2 0003 4 0004 1 0005 1 0006 1
NO LATER THAN DATE
01 DECEMBER 2019
01 DECEMBER 2019
01 DECEMBER 2019
01 SEPTEMBER 2019
01 DECEMBER 2019
01 SEPTEMBER 2019
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER
DATE OF RECEIPT OF A
WRITTEN NOTICE OF AWARD
(End of clause)
2 52.247-34 F.O.B. DESTINATION (NOV 1991)
(a) The term "f.o.b. destination," as used in this clause, means--
(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or
F-2
"constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.
(b) The Contractor shall--
(1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
(End of clause)
END OF SECTION F
SHEET ID
G-002
F il e S h t s iz
S T
E V
E N M
H O
B B
S P .E
W
IN
F
IE
L D
M
IS
S O
U R I
M
IS
S
IS
S
IP
P I
R
IV
E R
M
IT
E R G
A T
E T
U R
N
IN
G F
O O
T
L O
C K
U
P P
E R M
IT
E
R G
A T
E S
S T L
O U
IS
M
IS
S O
U R I
S T L
O U
IS
D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
IN
D
E X O
F D
R A
W
IN
G S
W P -X
X -X
X X
X
A P
R
IL
G-001
NO.
SHEET
INDEX OF DRAWINGS
G-002
S-001
S-002
S-003
S-004
S-005
TURNING FOOT DETAILS - ELEVATION AND SECTION
COVER SHEET
GATE SUPPORT BLOCK - LOWER PORTION - PLAN ELEVATION AND DETAILS
GATE SUPPORT BLOCK - UPPER PORTION - PLAN ELEVATION AND DETAILS
GATE SUPPORT BLOCK WITH TURNBUCKLE ATTACHED
M-001
M-501
M-502
GENERAL
STRUCTURAL
MECHANICAL
W P -X
X -X
X X
X
P R
O J E
C T L
O C
A T
IO
N M
A P
S
J .R .S
R .D .K
R .K
R .K
M-503
M-504
ANCHORAGE CONNECTING PIN DETAILS
M-511 PIN CONNECTION ASSEMBLY DETAILS
ANCHORAGE ASSEMBLY - ISOMETRIC
ANCHORAGE BUSHING DETAILS
GUDGEON LINK ANCHORAGE DETAILS
ANCHOR BAR DETAILS
NOT USED
INDEX OF DRAWINGS
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
of Engineers fi
A
B
C
D
1 2 3 4 5 6 7 8 9 10
E
F
G
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D B
Y:
SI
ZE
US Army Corps of Engineers
SHEET ID
LO
C
K
U
PP
ER
M
IT
ER
G
AT
ES
AP
R
IL
W
2P 9-
XX
-X
XX
X
W
2P 9-
XX
-X
XX
X
BR
AN
D O
N B
. L
EW
IS
, P
.E
AN
SI
D
ST
. L
O U
IS
D
IS
TR
IC
T
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
ST
. L
O U
IS
, M
IS
SO
U R
I 6
M-001
LO
C
K
AN
D D
AM
N
O . 2
M
EC
H
AN
IC
AL
AN
C H
O R
AG
E
AS
SE
M
BL
Y
IS
O M
ET
R
IC
K.
L.
S.
, P
.E
K.
L.
S.
, P
.E
J.
A.
J.
, P
.E
M
IT
ER
G
AT
E
TU
R
N
IN
G F
O O
T M
IS
SI
SS
IP
PI
R
IV
ER
W
IN
FI
EL
D , M
IS
SO
U R
I
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
LE
N
AM
E:
GENERAL NOTES
1. THE CONTRACTOR SHALL FABRICATE PINS AND BUSHINGS AS SHOWN ON
THE DRAWINGS.
2. BUSHINGS SHALL BE PRESSED IN FROM THE INNER SIDE OF THE MEMBER,
WHERE APPLICABLE.
3. THE CONTRACTOR SHALL PACKAGE AND SHIP THE PARTS AS REQUIRED IN
THE SPECIFICATIONS.
CONNECTION ISOMETRICC3 NTS
MITER GATE ANCHORAGE
ANCHORAGE PIN PLANTES
SEE STRUCTURAL DRAWINGS
ANCHORAGE PIN PLATES
SEE STRUCTURAL DRAWINGS
MK. S-26-3
MK. M-504-2
MK. M-504-3
MK. M-504-3
MK. S-26-2
MK. S-26-1MK. S-26-7
MK. S-26-7
MK. M-504-3
MK. M-504-3
MK. M-504-2
MK. S-31-1
MK. S-31-2
MK. S-26-3
MK. S-26-4
MK. M-504-1
MK. M-504-1
MK. M-504-2
MK. S-26-5MK. S-26-5
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
of Engineers
US Army Corps
DS: c:\users\b3edhkls\pw_working\mvs\d0196767\AEC_Screen.dscript.dscriptPD: AEC_pdf.pltcfg
2019/04/09
2019/04/09
W P -X
X -X
X X
X
M-501
M E
C H
A N
IC
A L
L O
C K A
N D D
A M N
O
C2
PRIMARY ANCHOR BAR
SCALE: 1" = 1'-0"
012" 6" 1'
C2
012" 6" 1'
SECONDARY ANCHOR BAR
SCALE: 1" = 1'-0"
A N
C H
O R B
A R D
E T
A
IL
F il e S h t
File Stat
IN
F
IE
L D
M
IS
S O
U R I
M
IS
S
IS
S
IP
P I
R
IV
E R
S T L
O U
IS
M
IS
S O
U R I
S T L
O U
IS
D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
M
IT
E R G
A T
E T
U R
N
IN
G F
O O
T
L O
C K
U
P P
E R M
IT
E
R G
A T
E S
A P
R
IL
3'-4"5"5"5"
7' - 9"
5'-7"
5"5"5"7 "1' -6¾"
1' -9 "
10'-0"
½
2'-5"
BORE
½
3 ¾"4 "7 "1' -6¾"
.2
.2
.2
29.43°
15°
10" RAD
ASTM A668 CLASS G
QTY: 8MK. S-26-2
10" RAD
3¾" 84 "
10" RAD
11.250 11.252
10" RAD
ASTM A668 CLASS G
QTY: 8
MK. S-26-1
MK. S-24-8
MK. S-26-6
KEEPER PLATE BOLT 6
MK. S-31-10
SPARE PARTS REQUIRED
ITEM MARK NO. QTY.
EYE BOLT
TURNED BOLT
C GUDGEON LINKL
20" RAD
20" RAD
MK. S-26-7
SLEEVE NUT
20" RAD
20" RAD
THREAD ¾" PITCH
" SQ. RIGHT HAND
THREAD 1" PITCH
½" SQ. RIGHT HAND
7.990 8.000
7.500 7.503
THREAD 1" PITCH
½" SQ. RIGHT HAND
7.990 8.000
7.500 7.503
7.990 8.000
7.500 7.503
MK. S-26-7
SLEEVE NUT
" RAD BOLT CENTER8
IN PROPER ANGULAR POSITION
DRILL WITH GUDGEON LINK INSTALLED
FOR A LIGHT DRIVE FIT (ASME B4.1, FN-1)
DRILL FOR TURNED BOLTS MK. S-26-6
IN PROPER ANGULAR POSITION
INSTALLED ON ANCHOR BAR
BORE WITH GUDGEON LINK
" PITCH4
3THREAD
" SQ. RIGHT HAND
K .L .S P .E
K .L .S P .E
J .A .J P .E
W P -X
X -X
X X
X
B R
A N
D O
N B L E
W
IS
P
FACE OF LOCK WALL
MK S-26-1
MK S-26-5MK S-26-2
5"
D7 ASTM A668 CLASS G
SLEEVE NUT
SCALE: 1" = 1'-0"
QTY. 16
012" 6" 1'
11 ½"8
4 "
1' - 9 "
MK. S-26-7
¾" PITCH
" SQ. RIGHT HAND
1" PITCH
½" SQ. RIGHT HAND
GREASE FITTING
¼" STRAIGHT THREAD
8" 10"
3"
SECTION B-B
SECTION A-A
1' - 1 ½" 1' - 1 ½"
1 ½" 1 ½"
BORE
¾
¾
½
¾
¾
2 ½"
3 ½"
1 ½"
1 ½"
1 ½"
3 ½"
2 ½" 7.990 8.000
7.500 7.503
A
A
BB
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
of Engineers
2019/04/08
W P -X
X -X
X X
X
M-502
M E
C H
A N
IC
A L
L O
C K A
N D D
A M N
O
FINISH ALL OVER EXCEPT AS NOTED.
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F5
QTY: 128
6"0 3" 12"
TURNED BOLT
SCALE: 3" = 1'-0"
B6 ASTM A668 CLASS G
GUDGEON LINK
SCALE: 1 1/2" = 1'-0"
E1
012" 6" 1'
QTY: 16
G U
D G
E O
N L
IN
K A
N C
H O
R A
G E D
E T
A
IL
MK. S-26-6
MK. S-26-5
R
R
R
.2
ASTM F3125, GR 325 TYPE 1
F il e S h t
GUDGEON LINK-ANCHOR BAR ASS'Y
NOT TO SCALE
FOR INFORMATION ONLY
"16
W
IN
F
IE
L D
M
IS
S O
U R I
M
IS
S
IS
S
IP
P I
R
IV
E R
S T L
O U
IS
M
IS
S O
U R I
S T L
O U
IS
D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
M
IT
E R G
A T
E T
U R
N
IN
G F
O O
T
L O
C K
U
P P
E R M
IT
E
R G
A T
E S
A P
R
IL
11.250
11.252
AND SPOT FACE (TYPICAL)
FOR A LIGHT DRIVE FIT (ASME B4.1, FN-1)
DRILL FOR TURNED BOLTS MK. S-26-6
ANGULAR POSITION
ON ANCHOR BAR MK. S-26-1 IN PROPER
BORE WITH GUDGEON LINK INSTALLED
K .L .S P .E
K .L .S P .E
J .A .J P .E
W P -X
X -X
X X
X
B R
A N
D O
N B L E
W
IS
P .E
AND SPOT FACE (TYPICAL)
FOR A LIGHT DRIVE FIT (ASME B4.1, FN-1)
DRILL FOR TURNED BOLTS MK. S-26-6
+.0008
+.0012
SECTION A-A
B
C
D
1 2 3 4 5 6 7 8 9 10
E
F
G
A A
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D B
Y:
SI
ZE
US Army Corps of Engineers
SHEET ID
LO
C
K
AN
D D
AM
N
O . 2
N O
. 2
M
AY
W
2P 9-
XX
-X
XX
X
W
2P 9-
XX
-X
XX
X
BR
AN
D O
N B
. L
EW
IS
, P
.E
AN
SI
D
ST
. L
O U
IS
D
IS
TR
IC
T
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
ST
. L
O U
IS
, M
IS
SO
U R
I 6
M-503
C
K
AN
D D
AM
N
O . 2
M
EC
H
AN
IC
AL
AN
C H
O R
AG
E
C O
N N
EC
TI
N G
P
IN
S D
ET
AI
LS
K.
L.
S.
, P
.E
K.
L.
S.
, P
.E
J.
A.
J.
, P
.E
M
IT
ER
G
AT
E
AN
C
H O
R
AG
E R
EP
LA
C
EM
EN
T
U
PP
ER
M
IS
SI
SS
IP
PI
R
IV
ER
LI
N
C O
LN
C
O U
N
TY
, M
IS
SO
U
R I
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
PR
O
JE
C
T N
U M
BE
N
9.990 9.988
30°
4"
4"
4"
4"
12"
32"
4"
2"
1"
4"
8"
8"
2"
8"
8"
8"
7.002 7.000
8"
8"
4"
4"
8"
4"
7.005 7.000
4"
4"
4"
2"
2"
4"
4"
8" WASHER
GUDGEON PIND8 SCALE: 3" = 1'-0"
MK. S-31-1
ASTM A322 GR 4340
QTY: 8
TO GUDGEON LINKE6 SCALE: 3" = 1'-0"
MK. S-26-4
ANCHORAGE PIN
TO PIN PLATESE4 SCALE: 3" = 1'-0"
MK. S-26-3
ANCHORAGE PIN
QTY: 16
8"-7 UNC - 2A
4"-10 UNC - 2A
KEEPER PLATE BOLTB9 SCALE: 3" - 1'-0"
MK. S-31-10
ASTM A325
QTY: 48
EYE BOLTB7 SCALE: 3" = 1'-0"
MK. S-24-8
DROP FORGED
DRILL AND TAP 11
8" HOLE
FOR EYE BOLT MK. S-24-8 DRILL AND TAP 11
8" HOLE
FOR EYE BOLT MK. S-24-8
DRILL AND TAP 11
8" HOLE
FOR EYE BOLT MK. S-24-8
0 3" 6" 9" 12" 0 3" 6" 9" 12"
0 3" 6" 9" 12"
0 3" 6" 9" 12" 0 3" 6" 9" 12"
KEEPER RINGE1 SCALE: 3" = 1'-0"
MK. S-31-9
ASTM A148, GRADE 80-50
TY
P.
30° (TYP.)
R67 8"
7.500 BOLT RAD.
2"
B O
RE
18"
2"
8" 21
8"133 4"
4"
4"
125FINISH ALL SURFACES
DRILL 7 8" HOLES
0 3" 6" 9" 12"
DRILL 11
16" DIA. HOLE
THRU PIN
DRILL 1 2" DIA (TYP.)
4" COUNTERSINK
45° CHAMFER
2" DIA. x 1 2" THREADED PLUG (TYP.)
4" PIPE THREAD STRAIGHT
GREASE FITTING (TYP.)
16"
16"
DRILL 11
16" DIA. HOLE FOR
8" - 11 UFC - 2A X 91
2" LG. BOLT
MK.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.