Amendment 0001 - for Lift Chain Gate Assemblies
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A02_Section_J.pdf | ||
| A12_Solicitation_W912P918T0014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P918T0014
W81C8X80162776
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise the scope of w ork and the draw ings. The solicitation w ill be extended from Jun 12th at 10:00 AM until June 21st at 10:00 AM.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P918T0014
X 9B. DATED (SEE ITEM 11)
11-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-May-2018
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
F-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The option status has changed from No Status to Option.
The following have been added by full text:
REVISED BID SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
NOTE: Prices must be on a firm basis.
ITEM DESCRIPTION QTY U/I UNIT PRICE AMOUNT
LIFT GATE CHAIN ASSEMBLIES
MAIN LOCK SET
JB
OPTIONAL
BID ITEMS
0002 LIFT GATE CHAIN ASSEMBLIES
AUXILIARY LOCK SET
1 JB _________ _________
0003 LIFT GATE CHAIN ASSEMBLIES
MAIN LOCK SPARE SET
1 JB _________ _________
0004 LIFT GATE CHAIN ASSEMBLY
AUXILIARY LOCK SPARE SET
1 JB _________ _________
NOTE: Job (JB) price and payments shall constitute full compensation for all costs associated with furnishing all required components of each Bid Item, following the delivery schedule as outlined in Section F – Deliveries or Performance.
Each Bid Item consists of 4 assemblies to make a complete set. Assemblies required for each set is as follows:
Bid Item 0001 – Main Lock Set consists of 2 Downstream Leaf (M-401) assemblies and 2 Upstream Leaf (M-402_ assemblies.
Optional Bid Item 0002- Auxiliary Lock Set consists of 1 Downstream Leaf West Wall (M-401) assembly, 1 Upstream Leaf West Wall (M-402) assembly, 1 Downstream Leaf Intermediate Wall (M-
403) assembly, and 1 Upstream Leaf Intermediate Wall (M-404) assembly.
Optional Bid Item 0003 – Main Lock Spare Set consists of 2 Downstream Leaf (M-401) assemblies and 2 Upstream Leaf (M-402) assemblies.
Optional Bid Item 0004 – Auxiliary Lock Spare Set consists of 1 Downstream Leaf West Wall (M-401) assembly, 1 Upstream Leaf West Wall (M-402) assembly, 1 Downstream Leaf Intermediate Wall (M-403) assembly, and 1 Upstream Leaf Intermediate Wall (M-404) assembly.
All costs for Bid Items No. 0001, 0002, 0003, and 0004 shall include, but not be limited to, furnishing all plant, F-3 labor, material, and equipment and performing all operations required to fabricate, assemble, and deliver the lift gate chain assembly sets.
Bid Items No. 0002, 0003, and 0004 are OPTIONAL ITEMS. The contracting Officer will direct the optional bid item work as needed. The Contractor shall perform the appropriate work ONLY when directed by the Contracting Officer. The Government is not obligated to request any work under any optional item(s). The bid prices for each optional item shall represent your firm price to perform that service. Payment will be made ONLY for work actually requested and performed to the Government’s satisfaction. The start of the delivery schedule outlines in Section F for optional bid items shall be considered the date of receipt of a written notice that the optional bid item is exercised by the Contracting Officer
END OF SECTION B
REVISED DELIVERY OR PERFORMANC
SECTION F
DELIVERIES OR PERFORMANCE
1 52.211-8 III TIME OF DELIVERY (JUN 1997)--ALTERNATE III (APR 1984)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER THE
DATE OF RECEIPT OF A
WRITTEN NOTICE OF AWARD
0001 1 270 calendar days
OPTIONAL ITEMS
0002 1 270 calendar days 0003 1 270 calendar days
0004 1 270 calendar days
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
F-4
ITEM NO. QUANTITY WITHIN DAYS AFTER
DATE OF RECEIPT OF
A
WRITTEN NOTICE OF AWARD
(End of clause)
2 52.247-34 F.O.B. DESTINATION (NOV 1991)
(a) The term "f.o.b. destination," as used in this clause, means--
(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, F-5 accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.
(b) The Contractor shall--
(1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
END OF SECTION F
F-6
REVISED SCOPE OF WORK
Scope of Work
1. GENERAL. The work provided for herein consists of furnishing all plant, labor, material, and equipment and performing all operations required to fabricate, assemble, and deliver the lift gate chain assembly sets for the Lock No. 27, as specified herein and shown on the contract drawings.
2. OMISSIONS. This scope of work may duplicate or not cover all specified activities, steps, and/or procedures required to accomplish work. In case of omission, the normal industry standards, practices, specifications and/or guidelines shall prevail. In no instance shall omission be a reason to perform inferior work, produce a less than acceptable product or service, or refuse to perform an intended activity.
3. CONTRACTING OFFICER. The term "Contracting Officer" shall mean the person executing this contract on behalf of the Government, and any other officer or civilian employee who is properly designated Contracting Officer; and the term shall include, except as otherwise provided in this contract, the authorized representative of a Contracting Officer acting within the limits of their authority.
4. WARRANTY. Materials and workmanship shall be warranted by the Contractor for a period of one year from date of delivery to the Government. All replacement parts required under the warranty provisions shall be furnished by the Contractor at no additional cost to the Government.
5. PAYMENT. Payment for the chain assembly sets will be made at the contract amount for the applicable item shown in Section B, which price and payment shall constitute full compensation for the work specified herein and shown on the contract drawings for each item.
6. POINT OF CONTACT. For technical inquiries please call: Joshua Jackson, P.E.
314-331-8270
Figerald Garcia, P.E.
314-320-6990
7. PLACE OF DELIVERY. The item(s) supplied under this contract shall be delivered F.O.B. Destination to:
U.S. Army Corps of Engineers St. Louis District Locks 27
3219 West 20th Street Granite City, IL 62040 POC: Jeremy Garzia, Lockmaster, 314-327-4624
Deliveries are accepted Monday – Friday, 0800 - 1630.
8. ANTITERRORISM/OPERATIONS SECURITY:
a) Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say
F-7
Something): The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law
F-8 enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
b) Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two (2) valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than three (3) business days after the initial contract award.
a. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
9. DRAWINGS AND SPECIFICATIONS. See attached plans and specifications listed herein for additional work performance requirements to include submittal, testing, and inspection requirements:
A. SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B. SECTION C - DESCRIPTION/SPECIFICATIONS
C. SECTION F - DELIVERIES OR PERFORMANCE
D. SECTION J - LIST OF ATTACHMENTS
10. GENERAL NOTE. Upon completion of work the contractor and Government shall inspect all work for functionality and operation. The contractor shall be responsible for repair or replacement of all damages or non-functioning components prior to final acceptance and repair or replacement of all damages to the work site resulting from work performed under this contract.
C-1
SECTION C DESCRIPTION/SPECIFICATIONS
1. SCOPE. The work provided for herein consists of furnishing all plant, labor, material, and equipment and performing all operations required to fabricate, assemble, and deliver lift gate chain assembly sets, as specified herein and shown on the contract drawings.
2. QUALITY CONTROL.
2.1 General. The Contractor shall establish and maintain quality control for all manufacturing, fabrication, and installation operations to assure compliance with the contract requirements and maintain records of its quality control for all construction operations, including but not limited to the following:
(1) Use of specified materials, including material certification records from suppliers.
(2) Shop machine work and fabrication.
(3) Shop inspection records, including dimensions and measurement readings.
(4) Shop assembly and tests.
(5) Preparation for shipment and storage.
2.2 Reporting. A copy of these records of inspections and tests, as well as the records of corrective action taken, shall be furnished to the Government.
3. REFERENCED PUBLICATIONS AND STANDARDS. The following publications of the issues listed below, but referred to thereafter by basic designation only, form a part of the plans and specifications to the extent indicated by references thereto.
3.1 ASME International (ASME).
B4.1 (1967; R 2009) Preferred Limits and Fits for Cylindrical Parts
B46.1 (2009) Surface Texture, Surface Roughness, Waviness and Lay
3.2 American Society for Nondestructive Testing (ASNT).
ASNT SNT-TC-1A (2016) Recommended Practice for Personnel Qualification and Certification in Nondestructive Testing
3.3 American Society for Testing and Materials (ASTM).
C-2
A29 (2016) Standard Specification for General Requirements for Steel Bars, Carbon and Alloy, Hot-Wrought
A322 (2013) Standard Specification for Steel Bars, Alloy, Standard
Grades
A829 (2017) Standard Specification for Alloy Structural Steel Plates
B505 (2014) Standard Specification for Copper Alloy Continuous Castings
4. SUBMITTALS. Submittals required by this section of the Technical Specifications include, but are not necessarily limited to:
4.1 General. The Contractor shall furnish complete shop drawings of the lift gate chain replacement parts, for action by the Contracting Officer, as specified herein. The Contractor shall furnish, upon request, any additional data identified by the Contracting Officer as required for verification of plans and specifications compliance.
4.2 Shop Drawings. The Contractor shall furnish complete shop drawings of the lift gate chain assemblies prior to fabrication of any equipment. Fabrication drawings shall indicate complete details of materials, tolerances, heat treatment, finishes, fits and machining processes, as applicable, for each part. The Contractor shall furnish manufacturer’s catalog data on the proposed dry film lubricant, rust preventative, and lubrication fittings.
4.3 Quality Control Procedures. The Contractor shall submit documentation that details the quality control procedures performed by the fabricator, packager and shipper. Documentation, under individual company letterhead, shall indicate techniques, reference standards, measurement devices, calibration records, and personnel qualifications.
4.4 Lists of Materials. The Contractor shall furnish two (2) copies of all purchase orders, mill orders, foundry orders, shop orders and work orders. The Contractor shall provide a list that designates the material to be used for each item with the shop drawings. All testing data, pertinent to each material, shall be furnished prior to actual shipment of fabricated items to the final destination. The Contractor shall furnish a shipping bill, or memorandum, for all items placed on the final transportation vehicle, which shall designate the mark numbers, individual weights, total weight and number of items. Copies of certified shipping bills shall be furnished to the Contracting Officer.
4.5 Nondestructive Testing (NDT). Conduct NDT examinations using suitable equipment and qualified personnel. Provide written approval of the examination procedures and perform the examination tests in the presence of the Contracting Officer’s representative, unless the witness requirement is waived in writing. Persons performing the NDT examination must be qualified for the specific procedure used in accordance with ASNT SNT-TC-1A. Submit nondestructive examination certification of qualified persons, procedures, and equipment performing or used for nondestructive testing. The examination of the chain components shall be performed at the Contractor’s fabrication site. Quantities and requirements for testing are specified in Table 1, C-3 below. Lots from which examined specimen are parts are selected shall consist of at least 25% of the total quantity of each type part to be furnished per bid item. A lot shall be the completed components of a given type available at the inspection site. Flawed specimens (excessive inclusion size, out-of- tolerance dimension or hardness, or excessive surface roughness) are subject to rejection.
4.6 Measurements. Results of measurements on each of the chain components fabricated and/or machined according to the contract drawings. Measurements will be conducted by the Contractor in the presence of the Contracting Officer's representative, unless witness requirement waived in writing. This testing will be to verify that dimensions and finish are within required tolerances. This testing of the chain components shall be performed at the Contractor's fabrication site. Quantities subject to this testing are specified in Table 1, below. Parts to be examined shall be selected at random. Lots from which inspected parts are selected shall consist of at least 25% of the total quantity of each type part to be furnished per bid item. A lot shall be the completed components of a given type available at the inspection site.
Table 1.
ITEM
MEASURED AND
RECORDED
PARAMETERS1
NUMBER OF
SPECIMENS
TESTED PER
ASSEMBLY/BID
ITEM3
Long Pin M-502-52
Normal Pin M-504-12
OD, FINISH, UST
OD, FINISH, UST
1/4
10/40
Clevis Plate Assembly5 ID,WIDTH,FINISH, UST 2/8
Bushing M-504-22 ID,OD,LENGTH,ID FINISH,OD
FINISH, UST
10/40
Sidebar #1 M-503-14 ID,PITCH,WIDTH,ID FINISH, 5/20
SIDE FINISH, UST
Sidebar #2 M-503-24 ID,PITCH,WIDTH,ID FINISH, 5/20
SIDE FINISH, UST
Sidebar #3 M-503-34
ID,PITCH,WIDTH,ID FINISH,
SIDE FINISH, UST
10/40
Roller M-503-42 ID,OD,WIDTH,ID FINISH,OD
FINISH, UST
10/40
Link M-502-1,2,3,46 ID,PITCH,WIDTH, UST 4/16
NOTES
1. OD = Outside Diameter
ID = Inside Diameter FINISH = Surface Finish UST = Ultrasonic Scan Test
4. Take two (2) measurements per parameter per specimen.
5. Test specimen quantities shown are at least 5% of the total quantity furnished.
C-4
6. Measure inside diameters of both bores and take one measurement per bore. Measure pitch tolerance derived from inside diameter edge to edge measurements. Take two width measurements per specimen.
7. Measure inside diameters of all 6 bores and take one measurement per bore.
8. Measure inside diameters of both bores and take one (1) measurement per bore.
Measure pitch tolerance derived from inside diameter edge to edge measurements. Measure both width dimensions.
4.6.1 Acceptance. All readings taken from the samples are required to be within the specified limits.
Failure of any part to meet these contract requirements will be cause for rejection of the entire quantity until action is taken by the Contractor to correct defects and prevent recurrence and such actions have been approved by the Contracting Officer. Retesting will be subject to the same random sampling and testing procedures as the original lots.
4.7 Material Test Reports. Certified test reports for all required material tests, showing that materials comply with the applicable specifications shall be submitted by the Contractor. These reports shall note the specific standards followed in the performance of tests. Test reports shall be submitted for each material shipment and shall be identified with specified lots prior to use in the work.
4.8 Shipping Documents. The Contractor shall provide shipping documents at least 10 calendar days prior to scheduled arrival date for all materials and equipment to be furnished to the Government. The documents shall list all materials by name, mark number, other descriptive information, as applicable, and include the appropriate shipping information. The shipping information shall include the name, address, telephone number for shipment tracking, shipment identification information, type of carrier, departure date, anticipated arrival date, and equipment required for handling upon arrival.
5. MATERIALS AND WORKMANSHIP.
5.1 General. Materials shall be as shown on the contract drawings, as specified herein or as otherwise required. If the Contractor perceives any variation between the referenced publications, drawings or specifications, the Contractor shall request a clarification, in writing, of the actual requirements. Workmanship shall be of the highest quality in accordance with the most stringent standard industry practice and applicable published standards.
5.2 Surface Finish. Where surface finishes are indicated on the contract drawings or specified herein, the symbols used or finishes specified shall be in accordance with ANSI B46.1. Values of roughness height specified are the arithmetical average deviation expressed in micro inches. Roughness specified is the maximum value and any lesser degree will be satisfactory unless otherwise called for on the drawings. Compliance with specified surface shall be determined by sense of feel and by visual inspection of the work compared to Roughness Comparison Specimens, in accordance with the provisions of ANSI B46.1. Values of roughness width and waviness height are not specified, but shall be consistent with the general type of finish
C-5 specified by roughness height. Flaws such as scratches, ridges, holes, peaks, cracks or checks which will make the part unsuitable for the intended use will be cause for rejection.
5.3 Limits and Fits. All fits shall meet the requirements shown on the drawings. Class 8 running fits are required between cylindrical faces in accordance with ASME B4.1 unless otherwise noted.
5.4 Fabrication. Fabrication requirements shall be as shown on the drawings and as specified herein. All items shall be fabricated from the materials shown on the drawings or specified herein. The items shall be free of twists, kinks, bends, rough spots, projections, or other deformations. All materials shall be handled and supported during manufacture and assembly to prevent distortion. All items shall be straight with bores and holes properly parallel or perpendicular, as required, to the axes shown on the contract drawings. Pin holes shall be bored true to gages, smooth, straight, and at right angles to the axis of the member. Perform the boring after the member is securely fastened in position.
5.5 Heat Treatment. The Contractor shall perform all heat treatment procedures in such a manner as to maintain the dimensions, finishes and fits shown on the contract drawings. No heat treatment, which can alter final finished dimensions, shall be performed after final finish machining.
6. LIFT GATE CHAINS.
6.1 General. Furnish complete assemblies with clevis assemblies at each end. Each assembly shall consist of two (2) 95-foot strands of roller chain, four (4) links, two (2) clevis assemblies and appurtenances as shown on the contract drawings. Each roller chain must be of the length indicated on Drawing Nos. M-401, M-402, M-403, and M-404, and within the tolerance also indicated on that drawing. Quantities of complete assemblies required for each set are as follows:
Bid Item Set Assembly Description Quantity
0001 Main Lock Set M-401 Downstream Leaf 2
M-402 Upstream Leaf 2 0002 Auxiliary Lock Set
M-401 Downstream Leaf West Wall 1
M-402 Upstream Leaf West Wall
M-403 Downstream Leaf Intermediate Wall
M-404 Upstream Leaf Intermediate Wall
0003 Main Lock Spare Set M-401 Downstream Leaf 2
M-402 Upstream Leaf 2 0004 Auxiliary Lock Spare Set
M-401 Downstream Leaf West Wall 1
M-402 Upstream Leaf West Wall
C-6
M-403 Downstream Leaf
Intermediate Wall
M-404 Upstream Leaf Intermediate Wall
6.2 Roller Chain Strand. The roller chain shall be 12-inch pitch chain conforming to the contract drawings. The chain shall be complete with side bars, bushings, pins, rollers, lubrication fittings and retaining rings.
Each strand shall have a minimum ultimate strength of 1,000,000 pounds. The chains shall be assembled in shipping lengths in matched and tagged pairs as shown on the contract drawings. The links shall be shipped attached to the chains. The existing chain is shown in the reference drawings. Submit manufacturer’s qualifications statement.
6.3 Clevis Assembly. The clevis assembly shall be according to the contract drawings and shall be furnished complete with connecting pins, keepers, dowels, and lubrication fittings. The clevis assembly shall be shipped detached from the roller chains.
6.4 Materials. Materials shall be as stated on the drawings and conform to the following specifications.
The substitution of similar but not identical materials to those specified will not be accepted. All materials shall be free from defects and imperfections, of recent manufacture and unused, and of the classifications and grades specified herein unless otherwise approved by the Contracting Officer. Material not specifically described shall, as far as practicable, conform to the latest specifications of the American Society for Testing and Materials. All materials, supplies, and articles not manufactured by the Contractor shall be the products of recognized reputable manufacturers. Samples of materials shall be submitted for approval when so directed. Equipment, materials, and articles installed or sued without such approval shall be at the risk of subsequent rejection.
6.4.1 Steel. Steel shall meet the applicable requirements of either ASTM A322 or A829. The grade shall be as shown on the contract drawings.
6.4.2 Bronze. Bronze castings shall meet the applicable requirements of ASTM B 505 for Copper Alloy No. C95520HT.
6.5 Lubrication. Submit manufacturer’s literature for factory and field lubricant. The field and factory lubricants must be compatible.
6.5.1 Grease. Manufacturer shall recommend and supply a 120 lb drum of grease lubricant per bid item to be used on the chain assemblies in the field during operation. The lubricant shall be compatible with the lubricant currently in use at the project for the current chains (PREMALUBE #1). The lubricant shall be rust and water resistant and designed for heavy load applications. Provide mineral oil base lubricant with aluminum complex base to resist water wash-out and extreme pressure agents for heavy loads. The lubricant shall be suited for unusually wet service. The lubricant shall be pumpable. All components shall be lubricated at assembly and the grease passages and annular space filled prior to shipping.
6.5.2 Dry-Film. The dry-film lubricant shall provide a protective dry film coat that is moisture resistant, greaseless, oil-less, and will not melt, freeze, or wash off. The lubricant shall be spray-able and quick drying and shall be formulated with fine graphite. Prior to shipment, all pins, C-7 bushings, rollers, and sidebars shall be coated with the dry film lubricant and allowed to dry.
6.6 Lubrication Fittings. The lubrication fittings shall be standard button head-fittings with 1/4" P. T. F.
and a plunger check. The fittings shall protrude no more than 1/2-inch after installation on the pins. The Contractor shall coordinate the type and design of the lubrication fittings so that the existing grease delivery equipment owned by the project can be utilized.
7. SHIPPING, HANDLING AND DELIVERY. The lift gate chain replacement assembly sets shall be shipped, handled, and prepared for storage in a manner designed to prevent permanent deflection, distortion, or other damage, including weather damage. All assemblies and appurtenances for bid item 0001 and optional bid item 0002 shall be delivered to Locks # 27, 3291 West 20th Street, Granite City, IL 602040 between the hours of 8:00 AM and 4:00 PM, Monday thru Friday. The contractor shall contact Mr. Jeremy Garzia (618-452-7107) or Mr. Jim Adden (636-899-1543) for additional information or scheduling of delivery to Locks #27. All assemblies and appurtenances for optional bid items 0003 and 0004 shall be delivered to the River’s Project Office Warehouse, located 1.5 miles south of 301 Riverlands Way, West Alton, Missouri between the hours of 8:00 am and 4:00 pm, Monday through Friday. The contractor shall contact Mr. Figerald Garcia (636-899-0068) or Mr. Jim Adden (636-899-1543) for additional information or scheduling of delivery to the River’s Project Office Warehouse. Provisions for delivery shall be coordinated with the Contracting Officer's Representative at least 14 calendar days prior to anticipated arrival date in order to permit procurement of proper handling devices by the Government.
8. PREPARATION FOR SHIPMENT AND STORAGE.
8.1 Preparation for Shipment. Prior to shipment by any manufacturer or fabricator, the Contractor shall prepare elements of the lift gate chain replacement for shipment. All large, bulky or heavy items shall be securely mounted on pallets and covered with plastic. The pallets shall be of appropriate size and strength to facilitate loading and unloading. Contract drawing mark numbers, as well as any match-mark numbers, shall be stenciled, in indelible ink, on the outside of all boxes, crates or pallets. All packaging for shipment shall be designed to prevent damage to the equipment during loading, transportation, unloading, storage and any associated or subsequent handling.
Weatherproof covers shall be provided during shipment to protect any items shipped in trucks.
8.2 Preparation for Storage. Prior to shipment by any manufacturer or fabricator, all elements of the lift gate chain replacement shall be prepared for storage. All drilled or tapped holes, core holes or shaft bores shall be coated with the dry film lubricant and allowed to dry, then sealed with plastic or wooden plugs to prevent intrusion of dirt, moisture or other contaminants. All boxes and crates shall be provided with proper desiccant materials designed for moisture prevention during long term storage. All boxes and crates shall be designed with an accessible opening to inspect or replace desiccant materials. Storage maintenance instructions shall be stenciled or affixed to the outside of each container.
9. WARRANTY. Submit signed copies or the manufacturer’s warranty of a 1 year warranty for all materials and services provided under this section. All
C-8 replacement parts required under the warranty provisions shall be furnished by the Contractor at no additional cost to the Government.
10. PAYMENT. Payment for the lift gate chain replacement assembly sets will be made at the contract amount for the applicable item shown in Section B, which price and payment shall constitute full compensation for the work specified herein and shown on the contract drawings for each item.
END OF SECTION C
The following have been modified:
SECTION J
SECTION J
LIST OF ATTACHMENTS
DRAWINGS
M-401 M-402 M-403 M-404 M-501 M-502 M-503 M-504
End of Section J
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2018)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2017) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Nov 2016) of 52.219-9.
____ (iii) Alternate II (Nov 2016) of 52.219-9.
____ (iv) Alternate III (Nov 2016) of 52.219-9.
____ (v) Alternate IV (Nov 2016) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.
657f).
____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X (26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).
X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
X (28) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
X (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
X (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
X (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.
13496).
____ (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).
____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (June, 2016) (E.O. 13693).
____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-14.
X (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
X (41)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-16.
____ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O.
13513).
____ (43) 52.223-20, Aerosols (June, 2016) (E.O. 13693).
____ (44) 52.223-21, Foams (June, 2016) (E.O. 13693).
____ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
____ (47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (May 2014) of 52.225-3.
____ (iii) Alternate II (May 2014) of 52.225-3.
____ (iv) Alternate III (May 2014) of 52.225-3.
____ (48) 52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
____ (49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
____ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.
5150).
____ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C. 3332).
____ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).
____ (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(12)).
____ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.
Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
_____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).
_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
_____ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
_____ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
_____ (11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iv) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(v) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vi) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(vii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(viii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(ix) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(x) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xi) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xii) _____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O.
13627).
_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xiii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xvii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xv)52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
(xvi) (A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
(B) Alternate I (JAN 2017) of 52.224-3.
(xvii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
(xviii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xix) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xx) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.