Amendment 00002.pdf
PDF 140 KB Posted
- Attached to
- Morganza Control Structure Replacement Sluice Gate Federal contract opportunity
- Solicitation number
- W912P821R0015
About this file
This amendment modifies solicitation number W912P821R0015 for the replacement of sluice gates at the Morganza Control Structure in Pointe Coupe Parish, Louisiana. The USACE, New Orleans District is seeking proposals for the removal of existing sluice gates and installation of new stainless steel gates and frames. Proposals are due by February 5, 2021 and must be submitted via email to Joseph.J.Fitzgerald@usace.army.mil. The estimated value of the work is between $100,000 and $500,000, and the period of performance is from notice to proceed until March 29, 2021. Questions were accepted until January 28, 2021. This amendment provides answers to vendor questions on requirements for payment and performance bonds, site access, equipment use, electrical work, and proposal submission instructions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00003 - 21R0015 - SF30.pdf | ||
| Solicitation Package 21R0015 Am 0003.pdf | ||
| Solicitation Package 21R0015 Am 0002.pdf | ||
| Amendment 0001 - SF30.pdf | ||
| Solicitation Package W912P821R0015 Edited Amendment 0001.pdf | ||
| Drawings - 21R0015.pdf | ||
| Solicitation Package 21R0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation is hereby amended as follow s:
1. Updates made to SF 1442, items 9-13, see SF 1442 for details
2. Answ er vendor questions
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P821R0015
X 9B. DATED (SEE ITEM 11)
04-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2021
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P821R0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - SF 30 CONTINUATION
The offer guarantee is not required has been added.
The performance code Notice has been added.
The contractor period of performance begin 10 has been added.
The performance period code Mandatory has been added.
The performance payment bonds No has been added.
The contractor period of performance end 229 has been added.
The required performance Mississippi River and Tributaries, Morganza Control Structure Replacement Sluice Gates,Pointe Coupee Parish, LouisianaThis is a Total Small Business procurement.The work consists of removal of the existing sluice gates and frames; fabrication, transportation and installation of new stainless steel sluice gates and frames, and other work incidental thereto.The estimated value of this work is between $100,000 and $500,000.Questions are to be submitted no later than 1/28/2021 by 2 PM CentralProposals are due by 2/5/2021 no later than 11 AM Central and are to be submitted by email only tojoseph.j.fitzgerald@usace.army.mil. has been added.
The following have been added by full text:
ANSWERS TO VENDOR QUESTIONS
Contractor questions received between 1/5/21 - 1/22/21
Question 1. Payment and Performance Bonds and Offer Guarantee
The Solicitation Offer, and Award form 1442 does not indicate if a Payment and Performance bond is required for this project. Is Line 12A Incomplete? Will the Form be amended prior to the response date? The Solicitation Offer, and Award form 1442 does not indicate if an offer guarantee is or is not required. Is Line 13B Incomplete? Will the Form be amended prior to the response date?
See 1442, item has been updated
Question 2.
Will access to the structure be allowed to examine the existing condition of the Sluice Gates that are to be removed and replaced on this project? Does the Government have photographs of the current condition?
Section 01100, paragraph 12 has provisions for a Site Visit.
Question 3.
Can the Government’s Crane be utilized for the removal and replacement of the Sluice Gates or should the we mobilize the necessary equipment required for the removal and replacement?
Contractor shall provide their own equipment.
Question 4.
Are there any electrical demolition or replacements requirements for the removal of the Sluice Gates?
W912P821R0015
The existing electric gate operators shall be removed and placed in storage prior to the demolition of the gates.
After installation of the gates, these operators shall be reinstalled. Depending on the configuration of the new gate, the wiring and conduit from the operators to the first junction box may have to be replaced.
Question 5.
The SF 1442 and the SF 30 for amendment 0001 do not include a proposal due date. The only date for receipts is on beta.SAM.gov. Will the Government issue an amendment incorporating the response date and time?
See 1442, item has been updated
Question 6.
The solicitation number and type is indicated as an RFP, however there are no instruction for a proposal. Is this requirement a straight bid, or will a full proposal be required? If the latter, please provide the type of proposal evaluation and instructions for inclusion.
There is no technical or cost proposal required. Pricing needs to be submitted per Section 00010-Bidding Schedule (not just a lump sum amount).
7. How will responses be submitted to the Government? Via hard copy, email, or DoD SAFE upload? Will bid bonds be required to be submitted in hard copy, or will electronic suffice (depending on submission requirements)?
Proposals are to be submitted by email only to Joseph.J.Fitzgerald@usace.army.mil.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .