AMENDMENT 0001-OAKLAND.pdf
PDF 938 KB Posted
- Attached to
- OAKLAND INNER AND OUTER HARBOR FY 21 MAINTENANCE DREDGING PROJECT Federal contract opportunity
- Solicitation number
- W912P721B0002
About this file
This document contains an amendment to a solicitation for the Oakland Inner and Outer Harbor FY21 Maintenance Dredging Project. The amendment provides responses to contractor questions that clarify contract requirements and specifications. The project involves annual maintenance dredging of Oakland's inner and outer harbors to a depth of -50 feet MLLW plus a 2-foot overdepth allowance using contour dredging methods. Dredged material from most reaches is suitable for disposal at an upland site provided by the contractor or at the San Francisco Deep Ocean Disposal Site. The material from Reach 10A must be disposed at an upland site. The solicitation number is W912P721B0002 and was issued by the Department of the Army Corps of Engineers Engineering District San Francisco. Award and notice to proceed are intended to occur by June 1st to allow dredging within the environmental window.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OAKLAND BIDOF 1419-2.pdf | ||
| OAKLAND BID -OF 1419.pdf | ||
| W912P721B0002 0004.pdf | ||
| AMENDMENT 0003-OAKLAND DREDGING .pdf | ||
| AMENDMENT 0002-OAKLAND.pdf | ||
| OI_BD_FY19.zip | ZIP file | |
| OO_BD_FY20.zip | ZIP file | |
| OI_BD_FY20.zip | ZIP file | |
| OO_BD_FY19.zip | ZIP file | |
| W912P721B0002 Oakland InnerOuter FY21 Plans -24Feb21.pdf | ||
| W912P721B0002 Oakland InnerOuter FY21 Specs.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
W912P7
Oakland Inner and Outer Harbor FY21 Maintenance Dredging Project
See Continuation page of SF-30 Summary of changes for Amendment 0001
W912P7
CONTRACTING DIVISION
450 GOLDEN GATE AVE., 4TH FLOOR
SAN FRANCISCO, CA 94102
See Item 6
W912P721B0002
W912P721B0002
03/24/2021
03/05/2021
X X
1 3
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
Continuation page of SF 30 – Summary of changes for Amendment 0001
This amendment makes changes to the solicitation; these changes represent one of three types, either adding new information, deleting information, or revising existing information.
Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the below summary of changes:
RFI 1: Contractor would like to request the official full resolution multibeam pre-dredge survey data for all reaches in the OAKLAND INNER & OUTER HARBOR CHANNEL FY20 MAINTENANCE DREDGING PROJECT and OAKLAND INNER & OUTER HARBOR CHANNEL FY19 MAINTENANCE DREDGING PROJECT.
Answer: Refer to the uploaded attachments:
OO_BD_FY20.zip
OI_BD_FY20.zip
OO_BD_FY19.zip
OI_BD_FY19.zip
RFI 2: Note 5 of Section 00 10 00 states, “The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.” Per 1.3 Special Environmental Requirements of Section 01 57 19.99 43, “Any material dredged after November 30 in any year (if approved by the Government) shall be placed either at an upland beneficial reuse site benefitting aquatic species or the San Francisco Deep Ocean Disposal Site, as directed by the Government.” If dredging is necessary and approved after November 30, and the Government directs placement at an upland beneficial reuse site benefitting aquatic species, will this also be handled under the Change Clause FAR 52.243-4 as provided in Note 5 above?
ANSWER: Yes. However, the Government does not intent to dredge under this contract after 30 November 2021.
RFI 3: 1.4.1.4 Allowable (Paid) Overdepth Prism in Section 35 20 23 states, “Dredging in excess of the allowable 2-foot paid overdepth is prohibited.” Please confirm that this language applies only to repeated, continuous, and intentional excavation below the maximum overdepth as opposed to incidental dredging beyond the maximum overdepth, as may be expected with clamshell dredging operations.
ANSWER: No material beyond the -52' may be dredged or disposal of. Doing so is a violation of the Marine Protection, Research and Sanctuaries Act and subject to fines by EPA.
RFI 4: With regard to anticipated project timeline, does the Government intend to award and issue NTP so that Contractors may begin dredging at the start of the environmental window, on or about June 1?
ANSWER: Yes, assuming project moves according to the schedule.
W912P721B0002 file://Coespna7001sfo.spn.ds.usace.army.mil/cespn/Geomatics/_Hydrographic_Surveys_(Office)/2019/Oakland_Harbor/FY19_OH_BD file://Coespna7001sfo.spn.ds.usace.army.mil/cespn/Geomatics/_Hydrographic_Surveys_(Office)/2019/Oakland_Harbor/FY19_OH_BD
RFI 5: 3.2.6.4 Overflow/Decant, Spillage and Leakage in Section 35 20 23 states, “Overflow/decanting at the dredge site will be controlled in accordance with the requirements in Section TEMPORARY ENVIRONMENTAL CONTROLS FOR DREDGING IN SAN FRANCISCO BAY 01 57 19.01 43.” The referenced section only mentions that scow overflow /decant may be stopped if it appears to be affecting the light thresholds in the eelgrass area. Aside from this restriction, will scow decanting be allowed as determined necessary by the Contractor during dredging?
ANSWER: There are no prohibitions for overflow/decanting at the dredge site. If dredging activities affect light thresholds. then contractor may be required to cease dredging activities until the threshold is cleared.
RFI 6: DQM certification requirements, as described in Section 35 20 23.13, were waived last season due to COVID restrictions. Does the Government anticipate that they will be waived again this year?
ANSWER: The Government does not intend to waive any contract requirements including DQM certification requirements.
RFI 7: 3.4.5 San Francisco Deep Ocean Disposal Site (SF-DODS) in Section 35 20 24 states, “Disposal quantity limits for SF-DODS are established on a project-specific bases. The Contractor shall limit disposal quantities to those amounts specified in the Government-provided regulatory guidance.” May the Contractor assume that all material anticipated for this work can be disposed of at SFDODS without exceeding disposal quantity limits?
ANSWER: Yes.
RFI 8: Will the Government please consider extending the question deadline by one week?
ANSWER: If a suitable reason was given to extend the deadline.
RFI: 9 Past Oakland Inner and Outer Harbor Channel Maintenance Dredging contracts have required the use of a third party to certify that vessels transiting to SF-DODS are not overloaded and to complete the Scow Certification Checklist prior to departure. That language does not appear to be included in the specifications for this work. Is that no longer a requirement?
ANSWER: Correct. The use of a third party to certify scows that transport dredged material to SF- DODS will not be needed. The certification will be completed by the Government.
W912P721B0002
File details come from the government source that posted it. Updated .