Amendment 0002 The purpose of this amendment is to 1. Post Q A 2. Edit 52.211-10 to state 50 calendar days from Notice to Proceed 3. Update FAR 52.252-3 and 4. Extend the bid opening date to September 1 2016 at 1 00 pm CT.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Bid_Opening_Sign-In_Sheet.pdf | ||
| W912P5-16-B-0013-0001.pdf | ||
| Cumberland_City_Dredge_Plan_Site_Map.pdf | ||
| Controls_HPU.jpg | JPG image | |
| W912P5-16-B-0013.pdf | ||
| DumpScow_opening.jpg | JPG image | |
| DumpScow_underway.jpg | JPG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING DIVISION (JD9)
JAMIE.DAVIES@USACE.ARMY.MIL
(615) 736-7921
(615) 736-7124
NASHVILLE TN 37202-1070
W38XDD61396179
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Post Q&A;
2. Edit 52.211-10 to state 50 calendar days from Notice to Proceed;
3. Update FAR 52.252-3; and
4. Extend the bid opening date to September 1, 2016 at 1:00 pm CT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-B-0013
X 9B. DATED (SEE ITEM 11)
19-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2016
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37202-1070
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912P5
FACILITY CODECODE
EMAIL:TEL:
W912P5-16-B-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 29-Aug-2016 01:00 PM to 01-Sep-2016 01:00 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
Q&A
Clamshell Dredging in Cumberland River Solicitation Number: W912P5-16-B-0013
Questions and Answers
22. Question: Base option is for removal of 135,000 CY. At 300 CY/HR, that yields 450 Hours. Divide the 450 Hours by one, 9-hour shift and you have 50-days. Why is the requirement 2 ea. 9-hour shifts per day?
Answer: The work shall be completed within fifty (50) calendar days from Notice to
Proceed. FAR clause 52.211-10 has been updated to reflect this clarification. The 50 calendar days includes the twenty (20) calendar days the contractor has to commence work.
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001: The purpose of this amendment is to:
1. Post Q&A;
2. Revise Section 00800;
3. Revise Section 01000;
4. Correct wage determination from "Heavy" to "Heavy Flood Control";
5. Update FAR 52.252-3;
6. Edit 52.211-10 to add 20 calendar days for Option 3; and
7. Extend the bid opening date to August 29, 2016.
Amendment 0002: The purpose of this amendment is to:
1. Post Q&A;
2. Edit 52.211-10 to state 50 calendar days from Notice to Proceed;
3. Update FAR 52.252-3; and
4. Extend the bid opening date to September 1, 2016 at 1:00 pm CT.
(End of provision)
W912P5-16-B-0013
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within twenty (20) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire base work ready for use not later than fifty (50) calendar days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises. Additional calendar days will be added to the 50 calendar days for each of the options if they are exercised as per the table below:
Option Number Additional Calendar days added to the contract Period of Performance
1 18 2 17 3 20
If Options 1 and 2 are exercised while the contractor is still onsite, the resulting period of performance will be 85 calendar days. If the contractor has demobilized and Option 3 is exercised then 20 calendar days will be added for mobilization.
Delayed Notice to Proceed: The Government Furnished self-dumping split hull Dump Scow barges will be available no later than by December 30, 2016. At least one (1) week before the dump scows become available, the Government will notify the Contractor as to the date such dump scows will be available. Once available they can be picked up at Barkley Lock CRM30.6, Cumberland River