Huron_Dredge_Amendment02_package_W912P419B0002.pdf

PDF 396 KB Posted

Attached to
Huron Harbor Dredging Federal contract opportunity
Solicitation number
W912P419B0002
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

Huron Dredge Amendment02 package W912P419B0002

View the file

Other files for this federal contract opportunity

Other files attached to Huron Harbor Dredging, newest first.
File Type Posted
IGE_Adjusted_Abstract_Huron_Harbor_14Dec2018.xls XLS spreadsheet
Huron_Dredge_Amendment_01_W912P19B002_U0001.docx DOCX document
Final_W91P4180002_FY19_Huron_Harbor_Dredge_.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912P419B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 04-Dec-2018 03:00 PM to 14-Dec-2018 03:00 PM.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

Questions concerning this solicitation shall be submitted via electronic mail (e-mail) by 07 Dec 2018, 12:00 P.M. EST to Peter.R.Gembala@USACE.Army.mil and Frank.J.D’Andrea@USACE.Army.mil.

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 01: Bid due date and public opening is 11-December-2018, 3:00pm(ET) Amendment 02:

-Bid due date and public opening is 14-December-2018, 3:00pm(ET) -Bid form is updated to indicate 2 line items for the base bid.

-Section 01 35 13, table in paragraph 1.2 is updated , and subparagraph 1.2.2 Enviromental Window has been updated. (End of Provision)

(End of Summary of Changes) mailto:Peter.R.Gembala@USACE.Army.mil mailto:Andrea@USACE.Army.mil

AMENDMENT NO. 2

W91P418B0002

MAINTENANCE DREDGING

HURON HARBOR

HURON, OHIO

BID FORM CHANGE AND

CHANGES TO SECTION 01 35 13

04 DECEMBER 2018

Bid form is updated to indicate 2 line items for the base bid.

2. Section 01 35 13, table in paragraph 1.2 is updated, and subparagraph 1.2.1 Environmental Window has been updated.

SECTION 00 10 00

SOLICITATION, OFFER, AND AWARD (SF1142) AND BIDDING SCHEDULE

Bid will be based upon dredging and disposal of dredged material from Huron Harbor in the Government-furnished Open Lake Placement Site, as shown on the contract drawings, in accordance with these specifications.

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

1 Mobilization and Demobilization 1 JA $

2 Maintenance Dredging Sta. 25+00 to Lower Limit of Dredging w/placement in Government-furnished Open Lake Site 115,000 CY $ $

3 Maintenance Dredging Sta. 0+00 to Sta. 25+00 w/placement in Government-furnished Open Lake Site 60,000 CY $ $

Total Estimated Amount (Items 1 through 3) $

OPTION "A"

4 Maintenance Dredging Sta. 25+00 to Lower Limit of dredging w/placement in Government-furnished Open Lake Site 75,000 CY $ $

Total Estimated Amount (Items 1 through 4) $

Note 1: Bids must be complete as to all the items on the schedule. Failure to complete all items on the bid schedule will render the bid non-responsive.

Note 2: The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

Note 3: Regarding the option item, the government may elect to award or not to award the option. If the option item is awarded, the government reserves the right to limit the quantity of material up to the estimated quantity of the option item. If the option is awarded, it will be awarded within sixty (60) days of the contract award.

Milestone Maximum Calendar Days After Receipt of Notice to Proceed

Commence Work (Submittals, Administration, etc.) 10

Commence Actual Sediment Removal Operations 230

Complete Base Bid Work 270

b. The Notice to Proceed will be issued on or about 15 January 2019.

1.2.2 Environmental Window

Huron Harbor has dredging limitations based on environmental conditions. Between stations 0+00 and 25+00, dredging is only permitted between 01 July and 15 September. Complete dredging between stations 0+00 and 25+00 by 15 September 2019. Between station 25+00 and the lower limit of dredging, dredging is permitted only between 01 July and 15 April. Schedule the work accordingly.

TABLE FROM PARAGRAPH 1.2:

141176 - FY19 Huron Dredge - Amend No. 2.pdf
COVER PAGE