About this file

Amendment No. 3 Lorain Dredge

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 3

W912P418B0021

MAINTENANCE DREDGING

LORAIN HARBOR

LORAIN, OHIO

UPDATED SPECIFICATIONS AND

PLAN

10 SEPTEMBER 2018

AMENDMENT DESCRIPTION:

1. Section 01 35 13 SPECIAL PROJECT PROCEDURE, paragraph 1.2 e. has been changed to the following:

e. All environmental work period restrictions have been waived for this project.

2. Drawing C‐101 has been updated to indicate the new limits of the open lake placement site

CENTER 41.524378257 82.202072791

SW 41.518065273 82.209915950

SE 41.518025151 82.194287203

NE 41.530690699 82.194228121

NW 41.530730829 82.209859888

LATITUDE LONGITUDEPOINT

NAD 83 (DD.DDDDDDDDD)

OPEN LAKE PLACEMENT COORDINATES

BREAKW

ATE

RS

N

1̊ '0

" W

.2

S

T A

T U

T E M

IL

E

S

4+

GENERAL PLAN

0 600'

SCALE:1"=600'

1200'

(http://www.lrb.usace.army.mil/Library/MapsandCharts.aspx)

THE BUFFALO DISTRICT WEB SITE.

LATEST FEDERAL CHANNEL SURVEY DATA PROVIDED ON

CONTRACTORS ARE ENCOURAGED TO REVIEW THE 3.

ALL INDICATED MILE DISTANCES ARE IN "STATUTE" MILES.6.

AND ATMOSPHERIC ADMINISTRATION.

U.S. DEPARTMENT OF COMMERCE, NATIONAL OCEANIC

"UNITED STATES COAST PILOT NO.6", PUBLISHED BY THE

OF LORAIN HARBOR, SEE THE LATEST EDITION OF THE

GOVERNING THE USE, NAVIGATION, AND ADMINISTRATION

FOR UP-TO-DATE FEDERAL AND CITY REGULATIONS 5.

CABLES AND CHAINS.

TIMBERS, AND METAL ITEMS LIKE STEEL MILL SCALE,

LIMITED TO: SLAG, TACONITE, STONE, GRAVEL, WOOD,

CONTAIN VARIOUS TYPES OF DEBRIS, INCLUDING BUT NOT

INFREQUENTLY DREDGED. DREDGE MATERIAL MAY

WILL BE TYPICAL OF THAT ENCOUNTERED IN AREAS

NOT BEEN DREDGED IN OVER 8 YEARS. DREDGE MATERIAL

THAT PORTION OF THE CHANNEL ABOVE STA. 33+69 HAS 4.

PROCEDURES".

ARE DESCRIBED IN SECTION 01 35 13 "SPECIAL PROJECT

LIMITS CAN BE FOUND ON SHEET C-102. BENCH MARKS

COORDINATES OF THE CHANNEL LIMITS AND CONTRACT 2.

DATUM 1985).

QUEBEC (IGLD 1985) (INTERNATIONAL GREAT LAKES

FEET ABOVE MEAN WATER LEVEL AT RIMOUSKI,

REFERRED TO LOW WATER DATUM ELEVATION 569.2

DEPTHS AND ELEVATIONS ARE IN FEET AND ARE 1.

GENERAL NOTES:

O

P E

N L

A K

E P

L A

C E

M E

N T S

IT

E D

IM

E N

S

IO

N S

A N

D C

O O

R D

IN

A T

E S U

P D

A T

E D

L O

R A

IN

O H

L O

R A

IN

H

A R

B O

R A

N D B

L A

C K R

IV

E R

W P

B

C-101

-L

R B -L

O R

-C -1

X X

X .d g n

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

B U

F F

A L

O D

IS

T R

IC

T

N

IA

G A

R A S

T R

E E

T

B U

F F

A L

O

N E

W Y

O R

K

A S

S

H O

W N

A N

S I

D

P D

T

K L

M F

T L

P

CERTIFIED FINAL - RTA

IS

S

U E D

A T

E

G E

N E

R A

L P

L A

N /2

/2

S O

L

IC

IT

A T

IO

N N

O

M A

IN

T E

N A

N C

E D

R E

D G

IN

G F

Y

J

U L

Y

F R

A N

K T L E

W A

N D

O W

S K I

NOT MAINTAINED

CONTRACT DEPTH 28'

CONTRACT DEPTH 29'

LOWER LIMIT OF DREDGING

CONTRACT DEPTH 27'

SHEFFIELD

VILLAGE OF

LORAIN

CITY OF

65+00

PLACEMENT AREA

NE

SESW

NW

CENTER

LIGHT

BREAKWATER

WEST

8+

+0

+6

5+00

UPPER LIMIT OF DREDGING

(NOT TO SCALE)

INSET 1

4+05

4280'

SITE LIMIT

PLACEMENT

HISTORICAL

L A K E E R I E

L A K E E R I E

(NOT MAINTAINED)

LOWER TURNING BASIN

CHANGE IN CONTRACT DEPTH

CONTRACT LIMITS

CHANGE IN CONTRACT DEPTH

PLACEMENT AREA (SEE INSET 1)

TO GOVERNMENT-DESIGNATED

B R

O A

D W

A Y

COLORADO AVENUE

OUTER BREAKWATER

EAST BREAKWATER

W E

S T B

R E

A K

W A

T E

R

EAST BR

EAKW

ATER

SH

O

R

EAR

M

LIGHT

BREAKWATER

WEST

W E S T P

IE

RAPPROX WHERE SHOWN

ON HARBOR BOTTOM

ALL POWER CABLES LAY

2 - ACTIVE USCG POWER CABLES

POWER CABLE

ABANDONED

INTAKE PIPES

HARBOR

SMALL BOAT

FACILITY (CDF)

CONFINED DISPOSAL

OF ENGINEERS

ARMY CORPS

U.S.

HALL

CITY

STATION

USCG

TURNING BASINS NOT MAINTAINED

1 - ACTIVE USCG POWER CABLE

CHANNEL

APPROACH

LAKE

HARBOR

OUTER

(DO NOT DREGE)

TURNING BASINS

W

ES

T

ERI

E

AVENUE

ERIE

AVENUE

LAKES

IDE A

VENUE

E A S T

PIER

1ST S

TREET

PIER

MUNICIPAL

RIVER

BLACK

9/ /1

File details come from the government source that posted it.