Amendment_0001_05Sep2017.pdf

PDF 4 MB Posted

Attached to
Buffalo River RSM at Unity Island Federal contract opportunity
Solicitation number
W912P417B0004
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

Please see attachment with Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Buffalo River RSM at Unity Island, newest first.
File Type Posted
Existing_North_Pond_.xyz XYZ file
Existing_Contours.dgn —
Existing_Contours.dwg DWG drawing
Site_Visit_Location_Map.pdf PDF
Solicitation_W912P417B0004_10Aug2017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment is addressing questions from contractors. Also, a new bid schedule has been issued along w ith updated specs. Please see follow ing attachment w ith further infomation w hich follow s after page tw o. All changes have been highlighted yellow . All other terms of solicitation remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P417B0004

X 9B. DATED (SEE ITEM 11)

02-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Sep-2017

CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P417B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

CONTRACTING BRANCH

1776 NIAGARA STREET

BUFFALO NY 14207-3199

to

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

(End of Summary of Changes)

W912P4-17-B-0004

AMENDMENT NO. 1

UNITY ISLAND

ECOSYSTEM RESTORATION

BUFFALO, NEW YORK

BIDDERS QUESTIONS WITH GOVERNMENT

RESPONSES, UPDATED BID FORM, PLANS &

SPECIFICATIONS

05 SEPTEMBER 2017

This amendment contains the following items:

1. Questions submitted by bidders and USACE responses

2. Updated BId Form (changes are highlighted)

3. Updated specification sections (changes are highlighted):

a. 01 22 00.00 02 PRICE AND PAYMENT PROCEDURES

b. 01 35 13 SPECIAL PROJECT PROCEDURES

4. Additional information regarding USACE sampling and testing

5. Updated drawing C-101 (changes are highlighted)

Page numbers will not match original solicitation

6. The following files are part of this amendment but are not included in this pdf file and must be downloaded separately:

a. Existing North Pond.xyx - Survey data for the North Pond used to create the contours shown

b. Existing Contours.dgn - Microstation CADD file

c. Existing Contours.dwg - AutoCad version of the Microstation file h5cosklm Highlight h5cosklm Highlight h5cosklm Highlight h5cosklm Highlight

All requirements with respect to the Contractor's use of the lock guide wall are in the Contract Specifications, Section 01 35 13, Paragraph

1.5.1.

LDC CONSTRUCTION (Received 8/31/17)

1. At the pre‐bid it was mentioned that the blacktop walkway from the parking lot over to the seawall was only to be used for light duty equipment. What is the maximum weight that can go across or down that path?

The first sentence of Note 2 on Contract Drawing Sheet C‐101 has been revised as follows: "ACCESS ACROSS THE CAUSEWAY IS LIMITED TO ONLY

PEDESTRIAN TRAFFIC AND LIGHT‐WEIGHT VEHICLES WITH A MAXMUM

WEIGHT OF 6000 POUNDS WHEN LOADED." A PDF file of the revised

Contract Drawing Sheet C‐101 is provided.

7. In addition to the weight restriction (300lbs/sf) to be used on the lock for transloading equipment, are there any other location or equipment‐ type restrictions for use of the lock as a temporary work platform.

4. Please provide details related any turbidity monitoring requirements or water quality standards that could impact operations.

5. Please provide any boring logs collected for the material being dredged and placed into North Pond.

6. What specific requirement – if any – exist for the use of divers?

The .xyz file "Existing North Pond.xyz" that was used to create the existing contours on Contract Drawing Sheet C‐101 is provided.

The Autocad file "Existing Contours.dwg" and the Microstation file

"Existing Contours.dgn" that was used to create it are provided.

The following sentence has been added to the end of paragraph 1.3.1.1:

"The 60% payment will be made after the initial mobilization during calendar year 2018 and the 40% payment will be made after the final demobilization at the end of calendar year 2018. " See amended specifications.

The requirement to install a turbidity curtain on the North Pond side of the opening in the existing stone dike has been added as an option bid item. For the added turbidity curtain requirements, see the amended

Contract Specifications, Section 01 22 00.00 02, Paragraph 1.3.6 and

Section 01 35 13 Paragraph 1.3.1 b. The dredging contractor, this fall, will install a turbidity curtain on the North Pond side of the existing concrete box culvert. Contract Specifications Section 01 22 00.00 02, Paragraph 1.3.1.1 and Section 01 35 13, Paragraph 1.3.1 have been revised to require the Unity Island Ecosystem Restoration contractor to maintain this turbidity curtain, and replace it (if functionality cannot be maintained), throughout the duration of the contract and remove as directed.

No borings were obtained in the Buffalo River dredging area. Five (5) surface grab samples (BRD17‐1 through BRD17‐5) were obtained using

Ponar dredge. Locations are shown in the plan as part of this amendment . Sieve analysis was performed on only 1 sample (BRD17‐1) as this sample was the only one that had gravel/sand. Gradation (sieve) and Atterberg limits were performed on these samples with results summarized in the table and figure that is attached to the original solicitation. All other samples were fine grained (silt & clay) as shown in the summary table that is attached to the original solicitation.

Photographs of teste performed by USACE personnel are also part of this amendment.

2. Please provide existing AutoCAD drawings of North Pond at Unity

Island.

3. Section 01 22 00, 1.3.1.1 states that costs associated with mobilization and demobilization will be paid as one line item. This section additionally acknowledges that multiple mobilization/demobilizations may be required as it relates to crews returning for additional planting seasons.

Please clarify whether after the initial mobilization the successful contractor will be compensated for 60% of Bid Schedule Item 1. If that is not the case, please detail how the 60% compensation for mobilization is spread among the mobilizations, and further define “mobilization”.

The definition of "mobilization" is:

'The movement of any Contractor plant and equipment to be used to complete the work required .'

Dive safety requirements are specified in the Contract Specifications, Section 01 35 26, Paragraph 1.14.

ECOSYSTEM RESTORATION ‐ UNITY ISLAND

W912P4‐17‐B‐0004

Contractor Question USACE Response

CHARTER CONTRACTING COMPANY, LLC (Received 8/30/17)

1. Please provide any existing .xyz data for North Pond at Unity Island.

Bidders Questions and USACE Repsonses

SECTION 00 10 00

SOLICITATION, OFFER, AND AWARD (SF1142) AND BIDDING SCHEDULE

The work pursuant to terms and conditions of this contract shall consist of the work as shown on the contract drawings and in accordance with the specifications.

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

1 Mobilization and Demobilization 1 JA $___________

2 Record (As‐built) Drawings 1 JA $___________ (including all surveys and photographs)

3 Dredged Material Relocation 5,000 CY $_______ $___________

4 2018 Plantings a Zone A (Elev. 566.2 ~ 565.2) 1,060 EA $_______ $___________ b Zone B (Elev. 565.2 ~ 564.2) 1,060 EA $_______ $___________ c Zone C (Elev. 564.2 ~ 558.2) 1,050 EA $_______ $___________

5 2018 Cut Tree Installation 6 EA $_______ $___________

6 2018 Wildlife Deterrence Installation & 43,200 SF $_______ $___________ Maintenance & 2019 & 2020

Re‐installation & Maintenance (Grid)

7 2018 Wildlife Deterrence Installation & 150 LF $_______ $___________ Maintenance & 2019 & 2020

Re‐installation & Maintenance (Fence)

8 2018 Trial Area Deterrence Installation 192 LF $_______ $___________ & Maintenance 2018 & 2019

Re‐installation & Maintenance

9 2019 Plantings a Zone A (Elev. 566.2 ~ 565.2) 3,120 EA $_______ $___________ b Zone B (Elev. 565.2 ~ 564.2) 3,150 EA $_______ $___________ c Zone C (Elev. 564.2 ~ 558.2) 3,130 EA $_______ $___________

10 Opening In Existing Stone Dike: 1 JA $___________ Construction and Associated Work

11 New Stone for Opening in Existing 800 TN $_______ $___________ Stone Dike

12 2018 Special Contour Staking 1,000 LF $_______ $___________

13 2019 Special Contour Staking 1,000 LF $_______ $___________

14 Floating Boom 1 JA $___________

15 Upland Features 1 JA $___________

Total Estimated Amount (Items 1 ~ 15) $________________________

DREDGED MATERIAL RELOCATION OPTION

16 Dredged Material Relocation 15,000 CY $_______ $___________

2018 WILDLIFE DETERRENT FENCE OPTION

17 2018 Wildlife Deterrent Installation & 3,000 LF $_______ $___________ Maintenance (Fence)

2018 WILDLIFE DETERRENT GRID OPTION

18 2018 Wildlife Deterrent Installation & 64,800 SF $_______ $___________ Maintenance (Grid)

2019 WILDLIFE DETERRENT FENCE OPTION

19 2019 Wildlife Deterrent Installation & 3,000 LF $_______ $___________ Maintenance (Fence)

2019 WILDLIFE DETTERENT GRID OPTION

20 2019 Wildlife Deterrent Installation & 140,000 SF $_______ $___________ Maintenance (Grid)

2018 PLANTING OPTION

21 2018 PLANTING OPTIONS

a Zone A (Elev. 566.2 ~ 565.2) 1,050 EA $_______ $___________ b Zone B (Elev. 565.2 ~ 564.2) 1,050 EA $_______ $___________ c Zone C (Elev. 564.2 ~ 558.2) 1,050 EA $_______ $___________

2019 PLANTING OPTION

22 2019 PLANTING OPTIONS

a Zone A (Elev. 566.2 ~ 565.2) 3,120 EA $_______ $___________ b Zone B (Elev. 565.2 ~ 564.2) 3,150 EA $_______ $___________ c Zone C (Elev. 564.2 ~ 558.2) 3,140 EA $_______ $___________

2020 PLANTING OPTION

23 2020 PLANTING OPTIONS

a Zone A (Elev. 566.2 ~ 565.2) 3,130 EA $_______ $___________ b Zone B (Elev. 565.2 ~ 564.2) 3,150 EA $_______ $___________ c Zone C (Elev. 564.2 ~ 558.2) 3,145 EA $_______ $___________

2018 SPECIAL CONTOUR STAKING OPTION

24 2018 Special Contour Staking 3,000 LF $_______ $___________

2019 SPECIAL CONTOUR STAKING OPTION

25 2019 Special Contour Staking 3,000 LF $_______ $___________

2018 CUT TREE INSTALLATION OPTION

26 2018 Cut Tree Installation 6 EA $_______ $___________

2019 CUT TREE INSTALLATION OPTION

27 2019 Cut Tree Installation 6 EA $_______ $___________

2018 INVASIVE SPECIES TREATMENT OPTION

28 A ‐ 2018 Invasive Species Treatment 20,000 SF $_______ $___________

29 B ‐ 2018 Invasive Species Treatment 20,000 SF $_______ $___________

2019 INVASIVE SPECIES TREATMENT OPTION

30 A ‐ 2019 Invasive Species Treatment 40,000 SF $_______ $___________

31 B ‐ 2019 Invasive Species Treatment 40,000 SF $_______ $___________

2020 INVASIVE SPECIES TREATMENT OPTION

32 A ‐ 2020 Invasive Species Treatment 40,000 SF $_______ $___________

33 B ‐ 2020 Invasive Species Treatment 40,000 SF $_______ $___________

TURBIDTY CURTAIN OPTION

34 New Turbidity Curtain 1 JA $___________

Total Estimated Amount (all Base and Option items): $________________

Note 1: Bids must be complete as to all the items on the schedule. Failure to complete all items on the bid schedule will render the bid non‐responsive.

Note 2: The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

NOTE 3: If any option items are executed, the Government reserves the right to limit the quantity of material up to the estimated quantity of the option item. If executed, option items will be executed according to the following schedule.

Dredged Material Relocation Options and New Turbidity Curtain Option: by 15 February 2018

2018 Wildlife Deterrent Fence Options: by 31 March 2018

2018 Wildlife Deterrent Grid Options: by 31 March 2018

2019 Wildlife Deterrent Fence Options: by 31 December 2018

2019 Wildlife Deterrent Grid Options: by 31 December 2018

2020 Wildlife Deterrent Fence Options: by 31 December 2019

2020 Wildlife Deterrent Grid Options: by 31 December 2019 2018 Planting Options: by 31 December 2017

2019 Planting Options: by 31 October 2018

2020 Planting Options: by 31 October 2019

2018 Special Contours Staking: by 31 December 2017

2019 Special Contours Staking: by 31 December 2018

2018 Cut Tree Installation by 31 March 2018

2019 Cut Tree Installation by 31 March 2019

A ‐ 2018 Invasive Species Treatment by 01 June 2018

B ‐ 2018 Invasive Species Treatment by 01 August 2018

A ‐ 2019 Invasive Species Treatment by 01 June 2019 h5cosklm Highlight

B ‐ 2019 Invasive Species Treatment by 01 August 2019

A ‐ 2020 Invasive Species Treatment by 01 June 2020

B ‐ 2020 Invasive Species Treatment by 01 August 2020

FY17 Unity Island (204) AMENDMENT NO. 1

FY17UNITY204 W912P4-17-B-0004

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 02

PRICE AND PAYMENT PROCEDURES

01/17

PART 1 GENERAL

1.1 1.1 REFERENCES

1.2 1.2 SUBMITTALS

1.3 SINGLE JOB PAYMENT ITEMS

1.3.1 Mobilization and Demobilization

1.3.1.1 Payment

1.3.1.2 Unit of Measure

1.3.2 Record (As-built) Drawings

1.3.2.1 Payment

1.3.2.2 Unit of Measure

1.3.3 Opening In Existing Stone Dike: Construction and Associated Work

1.3.3.1 Payment

1.3.3.2 Unit of Measure

1.3.4 Floating Boom

1.3.4.1 Payment

1.3.4.2 Unit of Measure

1.3.5 Upland Features

1.3.5.1 Payment

1.3.5.2 Unit of Measure

1.3.6 New Turbidity Curtain

1.3.6.1 Payment

1.3.6.2 Unit of Measure

1.4 UNIT PRICE PAYMENT ITEMS

1.4.1 Dredged Material Relocation

1.4.1.1 Payment

1.4.1.2 Measurement

1.4.1.3 Unit of Measure

1.4.2 Plantings

1.4.2.1 Payment

1.4.2.2 Measurement

1.4.2.3 Unit of Measure

1.4.3 Wildlife Deterrence (Fence)

1.4.3.1 Payment

1.4.3.2 Measurement

1.4.3.3 Unit of Measure

1.4.4 Trial Area Fence

1.4.4.1 Payment

1.4.4.2 Measurement

1.4.4.3 Unit of Measure

1.4.5 Wildlife Deterrence (Grid)

1.4.5.1 Payment

1.4.5.2 Measurement

1.4.5.3 Unit of Measure

1.4.6 Special Contour Staking

1.4.6.1 Payment

SECTION 01 22 00.00 02 Page 1001 09/01/17 h5cosklm Highlight

1.4.6.2 Measurement

1.4.6.3 Unit of Measure

1.4.7 2018 Cut Tree Installation

1.4.7.1 Payment

1.4.7.2 Measurement

1.4.7.3 Unit of Measure

1.4.8 New Stone for Opening in Existing Stone Dike

1.4.8.1 Payment

1.4.8.2 Measurement

1.4.8.2.1 Method of Determining Weight with Delivery by Vessel or

Barge

1.4.8.2.1.1 Displacement Gauges

1.4.8.2.1.2 Gauging Tables

1.4.8.2.1.3 Reading of Draft Gauges

1.4.8.2.1.4 Uniform Loading

1.4.8.2.1.5 Readings in Still Water

1.4.8.2.1.6 Leaks

1.4.8.2.1.7 Variations During Unloading Operations

1.4.8.2.1.8 Carrier Designations

1.4.8.2.1.9 Verification of Measurements

1.4.8.2.1.10 Carriers Not Measured

1.4.8.2.2 Method of Determining Weight with Delivery by Truck

1.4.8.2.2.1 Scales

1.4.8.2.2.2 On-Site Scales and Weigh Scale Certification

1.4.8.2.3 Determination of Excess Stone

1.4.8.2.4 Surveys for Excess Volume

1.4.8.3 Unit of Measure

1.4.9 Invasive Species Treatment

1.4.9.1 Payment

1.4.9.2 Measurement

1.4.9.3 Unit of Measure

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section Table of Contents --

SECTION 01 22 00.00 02 Page 1002 09/01/17

SECTION 01 22 00.00 02

PRICE AND PAYMENT PROCEDURES

01/17

PART 1 GENERAL

1.1 1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST HB 44 (2007) NIST Handbook 44: Specifications, Tolerances, and other Technical Requirements for Weighing and Measuring Devices

1.2 1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following must be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Weigh Scale Certification; G,AOF

If an on-site scale is used, prior to the use thereof, submit details on the location and construction of the scale and a copy of the certification of the scale's accuracy from the local weights and measures regulating agency.

Weight Certificates

Submit certified weight certificates for stone.

Bill of Lading

Submit Bill of Lading for each vessel/barge of stone.

Displacement Gauges; G,DS

Gauging Tables; G,DS

On-Site Scales; G,DS

1.3 SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below.

All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The

SECTION 01 22 00.00 02 Page 1003 job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.3.1 Mobilization and Demobilization

1.3.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization, as defined in FAR 252.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION.

This includes all site preparation (including site fencing, with gates, to be installed) and restoration as required in section 01 35 13 SPECIAL PROJECT PROCEDURES, all work related to the signs required in section 01 58 00 PROJECT IDENTIFICATION, and maintenance (and replacement, if required) of existing turbidity curtain, and its removal (see section 01 35 13, paragraph 1.3.1 'Order of Work'). Due to the duration of the performance period, more than one mobilization/demobilization may be required. All mobilizations/demobilizations will be paid as one line item. The 60% payment will be made after the initial mobilization during calendar year 2018 and the 40% payment will be made after the final demobilization at the end of calendar year 2018

1.3.1.2 Unit of Measure

Unit of measure: job.

1.3.2 Record (As-built) Drawings

1.3.2.1 Payment

Payment will be made for costs associated with line item "Record (As-built) Drawings" as required in section 01 78 00. The cost of all labor, equipment, and any other items not listed, to obtain all surveys, photographs, and videos must be included.

1.3.2.2 Unit of Measure

Unit of measure: job.

1.3.3 Opening In Existing Stone Dike: Construction and Associated Work

1.3.3.1 Payment

Payment will be made for costs associated with the removal of existing stone, as shown, and temporarily stockpiling into separate piles, (re-usable and not re-usable) as required, the placement of re-usable and new stone, placement of unusable stone into the pond as specified and shown, any manipulation of stone to create the pre-existing interlocking mass of stone, and any restoration required to return all areas disturbed by the construction of the opening in the existing dike, to its original condition or better.

1.3.3.2 Unit of Measure

Unit of measure: job.

SECTION 01 22 00.00 02 Page 1004 09/01/17

1.3.4 Floating Boom

1.3.4.1 Payment

Payment will be made for costs associated with the design, manufacture, transportation, and installation of the floating boom as shown and required. This includes all engineering and design for the anchors.

1.3.4.2 Unit of Measure

Unit of measure: job.

1.3.5 Upland Features

1.3.5.1 Payment

Payment will be made for costs associated with the furnishing, and installation of the upland features which are the (1) Metal Hand Railing, and (2) Asphalt Walkway Extension, as shown and required. This includes all labor and materials, as stated and shown, for the manufacture and installation of both items.

1.3.5.2 Unit of Measure

Unit of measure: job.

1.3.6 New Turbidity Curtain

1.3.6.1 Payment

Payment will be made for costs associated with the furnishing, installation, maintenance, and removal of a turbidity curtain as required in section 01 35 13 SPECIAL PROJECT PROCEDURES, paragraph 1.3.1 b.

1.3.6.2 Unit of Measure

Unit of measure: job.

1.4 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.4.1 Dredged Material Relocation

1.4.1.1 Payment

Payment will be made for costs associated with all required dredged material relocation to create the surface contouring as shown on the plan to be provided to the contractor by the government during the winter of 2018. This includes all personnel and the use of specialized equipment required. Due to the uncertainty of the quantity to be relocated, the base bid quantity listed on the bid form is intentionally low. The option will be executed to make payment for the actual total amount of material

SECTION 01 22 00.00 02 Page 1005 09/01/17 relocated as directed by the Government.

1.4.1.2 Measurement

The quantity of material to be paid for will be determined by using the digital terrain models of the survey performed by the Government and the digital terrain model of the after survey performed by the Contractor, using the TIN (triangular irregular network) method. The difference used for the quantity calculation is defined as the quantity of material removed from below the surface of the terrain model representing conditions before any material is relocated ("Cut" quantity only).

1.4.1.3 Unit of Measure

Unit of measure: cubic yard.

1.4.2 Plantings

1.4.2.1 Payment

Payment, for the line items listed below, will be made for costs associated with all plugs planted, in groups of 5, at the spacing required, within the limits shown. This includes all personnel, the use of any specialized equipment required, and the locating of each group of 5, as required in section 31 00 00 PROJECT SURVEYS. Due to the uncertainty of the quantity to be planted, the base bid quantity listed on the bid form is intentionally low. The base bid item for 2018 and 2019 includes the trial areas.

For 2018 Plantings/2019 Plantings/2020 Plantings:

Zone A (Elev. 566.2 ~ 565.2)

Zone B (Elev. 565.2 ~ 564.2)

Zone C (Elev. 564.2 ~ 558.2)

1.4.2.2 Measurement

The quantity to be paid for will be the total number of plugs properly planted, as determined by the Government.

1.4.2.3 Unit of Measure

Unit of measure: each.

1.4.3 Wildlife Deterrence (Fence)

1.4.3.1 Payment

Payment, for the line items listed below, will be made for costs associated with furnishing and installation in 2018 and 2019, of the fence with the required posts, spaced as required, and secured for stability, for the required length, as required and shown. This includes all personnel, the use of any specialized equipment required, installation of two (2) removable section/panels for Government personnel access, the maintenance of the fence while it is installed, removal, re-installed, and removed as required, and any replacement of damaged fence.

SECTION 01 22 00.00 02 Page 1006

The 2018 Fence must be installed and removed in 2018, re-installed and removed in 2019, and re-installed and removed in 2020.

The 2019 Fence must be installed and removed in 2019, re-installed and removed in 2020.

Due to the uncertainty of the exact location of the 563' contour and its length, the base bid quantity listed on the bid form (base bid only) for items "2018 Wildlife Deterrence Installation & Maintenance (Fence)" and "2019 Wildlife Deterrennce Installation & Maintenance (Fence)", are intentionally low. Options will be executed to make payment for the actual total length of fence installed as directed by the Government.

2018 Wildlife Deterrence Installation & Maintenance (Fence)

2019 Wildlife Deterrence Installation & Maintenance (Fence)

1.4.3.2 Measurement

The quantity of material to be paid for will be determined by calculating the actual length of fence installed. No payment will be made for any excess fence and posts that was not properly installed.

1.4.3.3 Unit of Measure

Unit of measure: lineal foot.

1.4.4 Trial Area Fence

1.4.4.1 Payment

Payment, for the line items listed below, will be made for costs associated with furnishing and installation in 2018 and re-installation in 2019, of six trials areas, using the required fence as stated in section 32 92 19 CONTOUR STAKING, PLANTING, AND WILDLIFE DETERRENT (which is different than the deterrent fence)with the required posts, and secured for stability.

This includes all personnel, the use of any specialized equipment required, installation of a removable section/panel for Government personnel access, the maintenance of the fence while it is installed, and removal as required.

2018 Trial Area Deterrence Installation & Maintenance 2018 & 2019 Re-installation & Maintenance (Fence)

1.4.4.2 Measurement

The quantity of material to be paid for will be determined by calculating the actual length of trial area fence installed. No payment will be made for any excess fence and posts that was not installed.

1.4.4.3 Unit of Measure

Unit of measure: lineal foot.

1.4.5 Wildlife Deterrence (Grid)

1.4.5.1 Payment

Payment, for the line items listed below, will be made for costs associated

SECTION 01 22 00.00 02 Page 1007 with furnishing and installation in 2018 and 2019, of the grid with the required posts, spaced as required, the poly wire installed at the correct elevation and interconnected to all posts, and the required flagging spaced along the poly wire at the required interval, as required and shown. This includes all personnel, the use of any specialized equipment required, the maintenance of the grid while it is installed, its removal, re-installation, and removal as required, and any replacement of damaged grid.

The 2018 Grid must be installed and removed in 2018, re-installed and removed in 2019, and re-installed and removed in 2020.

The 2019 Grid must be installed and removed in 2019, re-installed and removed in 2020.

This also include any deterrent used where the minimally required grid does not reach the deterrent fence line. Due to the uncertainty of the exact area requiring the grid installation, the base bid quantities listed on the bid form are intentionally low. Options will be awarded to make payment for the actual total square footage of grid installed as directed by the Government.

2018 Wildlife Deterrence Installation & Maintenance (Grid)

2019 Wildlife Deterrence Installation & Maintenance (Grid)

1.4.5.2 Measurement

The quantity of material to be paid for will be determined by calculating the total area of grid installed, based upon the coordinates of the exterior posts of any completed grid. If multiple grids are installed, payment will be made based upon the total of all areas where the grid is completely installed. No payment will be made for any excess grid materials that was not properly installed.

1.4.5.3 Unit of Measure

Unit of measure: square foot.

1.4.6 Special Contour Staking

1.4.6.1 Payment

Payment, for the line items listed below, will be made for costs associated with furnishing stakes and installation of the stakes on the special contours (565.2' and 564.2'), as required and shown. The staking required each year is only for the areas planted that year. This includes all personnel, the painting of the top of the posts, the use of any specialized equipment required, the maintenance of the posts while they installed, and removal as required. Due to the uncertainty of the exact length of the special contours and their length, the base bid quantity listed on the bid form is intentionally low. Options will be awarded to make payment for the actual total length of the special contours.

2018 Special Contour Staking

2019 Special Contour Staking

SECTION 01 22 00.00 02 Page 1008

1.4.6.2 Measurement

The quantity of material to be paid for will be determined by calculating the actual length of contours where staking is required. No payment will be made for any excess staking that was not required.

1.4.6.3 Unit of Measure

Unit of measure: lineal foot.

1.4.7 2018 Cut Tree Installation

1.4.7.1 Payment

Payment, for the line items, "2018 Cut Tree Installation" (base bid and option item), will be made for costs associated with the installation of the Government-furnished cut trees, at the locations and orientations provided by the Government. This includes all personnel, the use of any specialized equipment required for installation, and the locating of the ends of each cut tree as required in section 32 92 19 CONTOUR STAKING, PLANTING, AND WILDLIFE DETERRENT.

1.4.7.2 Measurement

The quantity of cut tree installation to be paid for will be the qunatity of cut trees installed. No payment will be made for any cut trees that were not properly installed at the correct location as designated by the Government.

1.4.7.3 Unit of Measure

Unit of measure: each.

1.4.8 New Stone for Opening in Existing Stone Dike

Payment will be made for costs associated for all costs, to include, but not limited to, furnishing, transporting, and stockpiling the new stone (if applicable).

1.4.8.1 Payment

Payment will be made at the contract unit price ton in place for the following items, which will constitute full compensation for providing all plant, labor, and materials, and performing all operations required to complete the work as specified herein, and as shown on the drawings. All stone materials must be new quarried materials. Placement of new stone in the opening is paid for under the line item "Opening In Existing Stone Dike: Construction and Associated Work".

1.4.8.2 Measurement

Stone will be measured for payment by the ton (2,000 pounds) by weighing each truckload to the nearest 0.1 ton, and the final quantity of the whole sum will be rounded to the nearest whole ton. Surveys will not be used for measurement purposes other than to determine excess quantities to deduct from payment. The stone will be measured for payment by being weighed on approved scales before being placed in the work. Quarry weights will not be accepted. Scales must be of sufficient length to permit simultaneous weighing all axle loads and must be inspected, tested and sealed as

SECTION 01 22 00.00 02 Page 1009 directed to assure accuracy with 0.5 percent throughout the range of the scales. The scales, located at the site of the work, must be certified as to accuracy by an acceptable scales company representative prior to weighing any stone. Scales will be checked and certified before stone hauling and rechecked and recertified whenever a variance is suspected.

The Contractor must furnish the scales. If commercial scales are readily available in close proximity 10 miles of site of work, the Contracting Officer may approve the use of the scales. The stone must be weighed in the presence of the Government representative. The Contracting Officer may elect to accept certified weight certificates furnished by a public weighmaster in lieu of scale weights at the jobsite. New stone materials will be measured for payment will be by the ton (2,000 pounds) of material acceptably placed in the work. as determined by carrier displacement or certified scale weight tickets, as approved by the Contracting Officer.

Material placed beyond the tolerance limits will not be paid for. Any length of repair not completed will all types of stone specified will not be paid for The method of determining the quantity of material placed beyond tolerance limits will be made in accordance with paragraph, "Determination of Excess Stone" and the use of the conversion factors outlined in paragraph "FACTORS USED FOR CONVERTING IN-PLACE VOLUME TO WEIGHT." Any material wasted or used by the Contractor for other purposes and any material not placed in the required work in accordance with the requirements of the specifications and drawings will not be measured or paid for.

1.4.8.2.1 Method of Determining Weight with Delivery by Vessel or Barge

A Bill of Lading must accompany every vessel or barge loaded at a quarry to indicate indicating the origin, specific type of stone and draft/freeboard readings on the vessel or barge. Only one type of stone will be allowed per vessel or barge.

1.4.8.2.1.1 Displacement Gauges

If stone is delivered by vessel or barge, the carrier must, prior to use in connection with this work, be fitted by the Contractor at its own expense with gauges or such other facilities for determining displacement as may be required by, or be satisfactory to, the Contracting Officer. Carriers, which owing to their model or other cause cannot be accurately gauged for displacement, must not be used on this work. Gauges must be graduated to the tenth of a foot, or to other suitable unit approved by the Contracting Officer. They must be six (6) in number and must be located as follows:

two (2) near each end on opposite sides and two (2) amidship on opposite sides. The gauges must be attached solidly to the hull itself, and wherever practicable, must be located inside the hull. If located inside the hull, provisions must be made for the free passage of the outside water to a vertical tube and for the ready measurement of the depth of the water within the tube. If located outside on wood hulls, the gauges must be protected by solid fenders or be recessed into the planking, or if on steel hulls, the gauge marks may be placed directly on the plates and identified by punch marks. Gauges must be so placed that their zeros are below water when the carrier is in its normal trim, light and free from water. The installation of the gauges must be subject to the approval of the Contracting Officer. The Contracting Officer must be allowed to be present at the installation of gauges and (s)he must be notified a minimum of five

(5) days prior to installation of gauges.

SECTION 01 22 00.00 02 Page 1010

1.4.8.2.1.2 Gauging Tables

To facilitate the determination of the weight of each load, a gauging table for each carrier employed must be prepared by an accredited agent satisfactory to the Contracting Officer. The gauging table must show the cargo weight, in tons of 2,000 pounds, for each unit of measurement of the draft. If the lines of the carrier are such that the cubic feet of displacement for each measured unit of draft can be accurately calculated, the gauging table must be based upon the data, using 62.4 pounds as the weight of one (1) cubic foot of water. If the lines of the carrier to be gauged are such as to render impracticable the preparation of the gauging table by the above described method, the weight for each unit of draft must be determined by measurement of displacement by actually loading stone of known weight and the weight thus obtained must be entered in the table for use in subsequent gauging. If alterations are made in any carrier which will affect the accuracy of the gauging table, after it has been prepared, or if otherwise deemed necessary at any time by the Contracting Officer, the carrier must be remeasured, and a new gauging table prepared. The Contractor must furnish such labor and material as may be required in collecting data for the preparation of gauging tables, and the cost of the labor and material so furnished must be included in the contract unit price per ton for the items as applicable. Existing stone placed in lieu of new stone is excluded from measurement for payment for new stone.

1.4.8.2.1.3 Reading of Draft Gauges

Readings to determine the draft will be taken before and after unloading.

The difference in tonnage found between loaded and light, will be used to determine the net weight to be paid. The draft must be determined from the average of all six (6) readings, weighting the readings of the middle gauges at double those of the end gauges. (G1 + G2 + 2xG3 + 2xG4 + G5 + G6) divided by 8 = average draft. The Contracting Officer must be present at all draft gauge readings.

1.4.8.2.1.4 Uniform Loading

The carrier must be so loaded as to cause uniform submergence. The increase in draft on the middle gauges, as a result of the load, must not differ by more than 0.5 feet from each other and that between any bow gauges and any stern gauges must not differ more than 1.5 feet from each other. If such is not the case, the Contractor must trim the carrier by shifting the stone until this limit is reached, before the stone will be accepted. If, however, the carriers proposed to be used by the Contractor are so built that they cannot be loaded as prescribed, and yet can be calibrated accurately for displacement under varying loads, such other method of determination of displacement as may be approved by the Contracting Officer may be used.

1.4.8.2.1.5 Readings in Still Water

All measurements for determining gauging table data and for load depths must be made in still water as close to the work as is possible. The Contractor is required to place the carriers where such measurements can be accurately made.

1.4.8.2.1.6 Leaks

All carriers used in transporting stone must be free of leaks such as would render accurate gauging difficult. Facilities for inspecting the hold of

SECTION 01 22 00.00 02 Page 1011 each carrier to determine whether leakage is occurring must be provided.

Each carrier must also be provided with adequate pumping facilities, and if water is found to be accumulating in the hold, the carrier must be pumped dry before each gauging, both before and after unloading.

1.4.8.2.1.7 Variations During Unloading Operations

Lightening by pumping or by transfer of crews or supplies will not be permitted while stone is being discharged. Should any lightening become necessary, the unloading of stone must be suspended and the draft readings taken before and after lightening, or, upon approval of the Contracting Officer's onsite representative, other record made of the amount removed.

The amount determined by the Contracting Officer, as having been removed must be excluded from the net tonnage paid.

1.4.8.2.1.8 Carrier Designations

Each carrier must be plainly marked by a distinctive number, letter, or name, which must not be changed or given to any other carrier during the contract period.

1.4.8.2.1.9 Verification of Measurements

The readings, other data, and calculations from which the gauging table and the tonnage are determined will be open to verification by the Contractor and must be subject to the approval of the Contracting Officer. The Contractor is invited to be present in person or to be represented by an authorized agent during the measuring of carriers. When the displacements of the carriers are determined or redetermined, a record of allowed displacement for quantity determination will be sent to the Contractor. If the Contractor protests within five (5) days, the carrier will be remeasured and the Contractor must be present in person or be represented by an accredited agent so that correct measurements can be agreed upon.

The Contractor will be given the weight of each load, as it is determined.

Failure to protest within five (5) days will be taken as equivalent to expressing satisfaction with the measurements and weight of stone determined by the Contracting Officer.

1.4.8.2.1.10 Carriers Not Measured

In case any stone is delivered by carriers not measured for displacement and marked as herein described, the Contractor must, with the Contracting Officer's approval and at the Contractor's expense, furnish means for properly and conveniently weighing such stone at the work site.

1.4.8.2.2 Method of Determining Weight with Delivery by Truck

The method of measurement for determining the weight of stone materials delivered by truck must be certified weigh bills provided by the Contractor at the job site from either on-site or off-site scales. Weigh bills and the scales used for weighing of trucks and materials contained therein must, unless otherwise approved by the Contracting Officer, conform to the following requirements:

a. Scales must conform to the requirements of the National Bureau of Standards (NBS) Handbook NIST HB 44. The tolerance applications of the Handbook, as applicable to under registration and over registration and to tests involving digital indications or representations, must apply.

The manufacturer may not use a scale for weighing a load totaling more

SECTION 01 22 00.00 02 Page 1012 than the nominal capacity marked on the scale. Any portion of the load in excess of the nominal scale capacity will not be considered for payment.

(1) The accuracy of the scale must be checked. When a State scale inspector is not immediately available for checking the scale, the Contractor may, at its own expense, secure a check from a local official sealer of weights and measures, or the Contracting Officer, may give tentative approval, based on check truckloads weighed on other scales which bear an official seal placed in the current calendar year.

b. The total weight of a single highway vehicle must be weighed as a single draft and may not be determined by adding together the results obtained by separately weighing each end of such vehicle, except that weighing of a coupled combination may be determined without uncoupling under the following conditions:

(1) The brakes are released.

(2) There is no tension or compression on the drawbar.

(3) The approaches are straight and in the same level plane as the scale platform.

(4) The approaches are paved at least fifty (50) feet in each direction with a seal coat or higher type surfacing.

(5) The approaches are of sufficient width and length to ensure level positioning of vehicles during the weighing operation.

c. When a printout system is employed on a platform or surge bin scale, it must be equipped with a printer, which must print the following information on a triplicate ticket for each truckload:

(1) Time.

(2) Date.

(3) Sequential ticket number (may be preprinted on ticket).

(4) Gross Weight.

(5) Tare Weight (trucks must be tare weighed at least twice daily).

(6) Net Weight.

(7) Net accumulated job daily total.

(8) Truck identification number (or license plate number).

d. The system must be so interlocked as to allow printing only when the scale has come to a complete rest.

1.4.8.2.2.1 Scales

For scales not equipped with the print-out system, as stated above, weigh bills must contain the same or equivalent data as specified for the

SECTION 01 22 00.00 02 Page 1013 print-out system. Weigh bills, including printouts, must be certified by the signature of the scale operator, which must attest that the information shown on the weigh bill is correct and is the weight(s) observed on the scale at the time of weighing. Each weigh bill must also be certified by the Contractor attesting that the entire load was properly placed in the work, and must show the time and date of weighing and the time and date of unloading. Each truck must be plainly marked by a distinctive number, letter, or name, which must not be changed or given to any other truck during the contract period. The Government reserves the right to periodically inspect the weighing operations at the scales. Copies of waybills and delivery tickets must be submitted during the progress of the work with the Contractor's daily Quality Control Reports. Before the final statement is allowed, the Contractor must file certified waybills and certified delivery tickets for all stone actually used.

1.4.8.2.2.2 On-Site Scales and Weigh Scale Certification

On-site scales must be certified by the applicable local weights and measures regulating agency and must be as approved by the Contracting Officer. Scales must be of the recording type and of the size required to weigh the materials and containers or vehicles. The scale must include housing for the instruments and scale operator, with heat, lighting and ventilation.

1.4.8.2.3 Determination of Excess Stone

All stone permitted by the Contracting Officer to remain outside the limits and tolerances of the cross sections of the structure, except variations so minor as not to be measurable, will be deducted from the quantity of new stone to be paid for. Weight of excess stone will be determined from the cross sections obtained by the method provided for in paragraph "Final Surveys," on the basis that the cubic feet of volume (including voids) for each type of stone listed in paragraph "FACTORS USED FOR CONVERTING IN-PLACE VOLUME TO WEIGHT", is equal to one (1) ton or 2,000 pounds for the bulk specific gravity and percentage of voids shown. If the bulk specific gravity of the stone furnished or the percentage of voids is other than as listed below, the cubic feet of volume equaling 2,000 pounds must be recomputed as described in paragraph "Revision of Bidding Schedule Quantities". Should any excess stone be disclosed above the tolerance line as defined in paragraph, "Tolerances," its volume will be computed by the average end area method, based on the cross sections in the following manner. The average end area of excess stone above the tolerance line for two (2) successive cross sections, multiplied by the distance between the cross sections will be accepted as the volume. The Contractor will not be required to remove such excess stone and deductions for the weights thereof will be made from contract payments for new stone. In addition to the above, stone which has been delivered to the site and has been lost or wasted or otherwise not properly incorporated into the final required work, must be deducted from the quantity to be paid for.

1.4.8.2.4 Surveys for Excess Volume

Survey work and measurements required for determination of excess volume computations for stone materials must be performed by the Contractor in the presence of the Government's on-site representative, unless the requirement for the Government's presence is waived. Additional cross sections, elevations and soundings may be taken if determined necessary by the Government's on-site representative. Prior to performing any work under this Section, the Contractor must coordinate all operations with the

SECTION 01 22 00.00 02 Page 1014

Government's on-site representative so that excess volume surveys will be made at the appropriate time. Stone quantity computations must be based entirely upon weights of new stone as determined from carrier displacement or certified scale weight tickets. Existing stone placed in lieu of new stone from off-site sources is excluded from measurement for payment.

1.4.8.3 Unit of Measure

Unit of measure: ton (2,000 pounds)(TN)

1.4.9 Invasive Species Treatment

1.4.9.1 Payment

Payment, for the line items listed below, will be made for costs associated with any required invasive species treatments as stated in section 32 92 20 INVASIVE SPECIES TREATMENT. This includes all personnel, the use of any specialized equipment required, any chemical treatment supplies, all Personal Protective Equipment (PPE) required and any other items not specifically stated but required to complete the work.

A - 2018 Invasive Species Treatment

B - 2018 Invasive Species Treatment

A - 2019 Invasive Species Treatment

B - 2019 Invasive Species Treatment

A - 2020 Invasive Species Treatment

B - 2020 Invasive Species Treatment

1.4.9.2 Measurement

The area(s) of treatment to be paid for will be determined by calculating the area requiring treatment, as determined by the Government. This will be done by obtaining the limits of each area and calculating the area using CADD/GIS software. Any areas where chemical and mechanical treatments overlap will not be counted twice.

1.4.9.3 Unit of Measure

Unit of measure: square feet.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section --

SECTION 01 22 00.00 02 Page 1015

SECTION TABLE OF CONTENTS

DIVISION…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .