W912P4-09-B-0007, Amend1.doc
DOC document 73 KB Posted
- Attached to
- RECOVERY Huron Harbor Ohio Maintenance Dredging Federal contract opportunity
- Solicitation number
- W912P4-09-B-0007
About this file
Bid Schedule has been amended.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FY09 Huron Abstract.pdf | ||
| HURON FINAL SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
BID SCHEDULE
SECTION 00010
SOLICITATION, OFFER, AND AWARD (SF 1442) AND BIDDING SCHEDULE
MAINTENANCE DREDGING
HURON HARBOR
HURON, ERIE COUNTY, OHIO
BIDDING SCHEDULE “A”
Bid on Bidding Schedule “A” will be based upon dredging and disposal of dredged material from Huron Harbor in the Government-designated Open-Lake Disposal Area, as shown on the contract drawing, in accordance with these specifications.
(See Section 35 20 23, MAINTENANCE DREDGING, Paragraph 3.3.2)
Item
No.
| Description |
| Estimated |
Quantity
| Unit |
| Unit |
Price
Estimated
Amount
Mobilization & Demobilization
LS
| 2 |
| Maintenance Dredging: |
Huron Harbor (Sta 55+00 to 133+41) w/ Open-Lake Disposal
| 170,000 |
| CY |
| $______ |
Total Estimated Amount (Items 1 & 2)
Option “A”:
| 3 |
| Maintenance Dredging: |
Huron Harbor (Sta 55+00 to 133+41) w/ Open-Lake Disposal
| 330,000 |
| CY |
| $______ |
Total Estimated Amount (Items 1, 2 & 3)
NOTE 1: The above “estimated quantity” pay items for dredging are based upon total estimated quantity of material available within the “required pay prism” plus a portion of the available “overdepth” material noted below. These quantities are approximate and do not indicate limitations in channel work areas nor are they an indication of expected material to be dredged:
Item Estimated Quantity in Quantity of Allowable
No. Required Pay Prism Overdepth Material Included
2 140,000 30,000
3 265,000 65,000
NOTE 2: BIDS MAY BE SUBMITTED ON EITHER OR BOTH OF THE BIDDING SCHEDULES. BIDS MUST BE COMPLETE AS TO ALL THE ITEMS ON THE SCHEDULE. FAILURE TO COMPLETE ALL ITEMS ON A BID SCHEDULE WILL RENDER THE BID NON-RESPONSIVE.
NOTE 3: Regarding Option Item “A”, the Government may elect to award this Option Item. If Option Item “A” is awarded, the Government reserves the right to limit the quantity of material up to the Estimated Quantity of the Option. Additionally, the Government may elect to award the Option Item within a period of sixty (60) calendar days from the date of Contract Award.
NOTE 4: The Government will evaluate the bids based upon the total amount of the base bid amount (Items 1 & 2) and the amount of Option “A” (Item 3).
MAINTENANCE DREDGING
HURON HARBOR
HURON, ERIE COUNTY, OHIO
BIDDING SCHEDULE “B”
Bid on Bidding Schedule “B” will be based upon dredging & disposal of dredged material from Huron Harbor in the Contractor-furnished/Government-approved Disposal Area(s), with the balance, if any, in the Government-designated Open-Lake Area, as shown on the contract drawing, in accordance with these specifications.
(See Section 35 20 23, MAINTENANCE DREDGING, Paragraph 3.3.3)
Item
No.
| Description |
| Estimated |
Quantity
| Unit |
| Unit |
Price
Estimated
Amount
| 1 |
| Mobilization and Demobilization |
LS
| 2 |
| Maintenance Dredging: |
Huron Harbor (Sta 55+00 to 133+41) w/ disposal in Contractor-furnished/Government-approved Disposal Area(s)
| 170,000 |
| CY |
| $______ |
Total Estimated Amount (Items 1 & 2)
Option “A”:
| 3 |
| Maintenance Dredging: |
Huron Harbor (Sta 55+00 to 133+41) w/ Open-Lake Disposal
| 330,000 |
| CY |
| $______ |
Total Estimated Amount (Items 1, 2 & 3)
NOTE 1: The above “estimated quantity” pay items for dredging are based upon total estimated quantity of material available within the “required pay prism” plus a portion of the available “overdepth” material noted below. These quantities are approximate and do not indicate limitations in channel work areas, nor are they an indication of expected material to be dredged:
Item Estimated Quantity in Quantity of Allowable
No. Required Pay Prism Overdepth Material Included
2 140,000 30,000
265,000
65,000
NOTE 2: BIDS MAY BE SUBMITTED ON ANY OR ALL OF THE BIDDING SCHEDULES. BIDS MUST BE COMPLETE AS TO ALL THE ITEMS ON THE SCHEDULE. FAILURE TO COMPLETE ALL ITEMS ON A BID SCHEDULE WILL RENDER THE BID NON-RESPONSIVE.
NOTE 3: Regarding Option Item “A”, the Government may elect to award this Option Item. If Option Item “A” is awarded, the Government reserves the right to limit the quantity of material up to the Estimated Quantity of the Option. Additionally, the Government may elect to award the Option Item within a period of sixty (60) calendar days from the date of Contract Award.
NOTE 4: The Government will evaluate the bids based upon the total amount of the base bid amount (Items 1 & 2) and the amount of Option “A” (Item 3).
NOTE 5: AWARD OF THE CONTRACT UNDER SCHEDULE “B” WILL BE SUBJECT TO THE ACCEPTANCE OF THE PROPOSED CONTRACTOR-FURNISHED DISPOSAL AREA(S), BY THE CONTRACTING OFFICER. UNLESS THE DATA REQUIRED IN SECTION 35 20 23, MAINTENANCE DREDGING, PARAGRAPHS “REQUIRED DOCUMENTS” AND “REQUIRED FORMS” OF THIS SPECIFICATION IS FURNISHED WITH THE OFFER AT THE TIME OF BID OPENING, THE OFFER UNDER THIS SCHEDULE WILL BE CONSIDERED NON-RESPONSIVE.
(End of Summary of Changes)